Plan Review Details - Permit 23031934
Plan Review Stops For Permit 23031934
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2023-07-13 Cont ID  
Sent By lmarchan Date 2023-07-13 Time 15:52 Rev Time 0.00
Received By lmarchan Date 2023-07-13 Time 15:52 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2023-07-05 Cont ID  
Sent By rmcphers Date 2023-07-05 Time 10:05 Rev Time 0.00
Received By rmcphers Date 2023-07-05 Time 10:05 Sent To  
Notes
2023-07-05 10:06:24PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT
  
 "THE INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY"
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:56 Rev Time 0.00
Received By jleahy Date 2023-05-04 Time 17:07 Sent To  
Notes
2023-05-02 10:58:23PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-07-05 Cont ID  
Sent By rmcphers Date 2023-07-05 Time 10:04 Rev Time 0.00
Received By rmcphers Date 2023-07-05 Time 10:04 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:42 Rev Time 0.00
Received By rmcphers Date 2023-05-02 Time 09:19 Sent To  
Notes
2023-05-02 10:38:09BUILDING RESTORATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE A CONCRETE REPAIR MAP SHOWING THE
 LOCATIONS OF THE CONCRETE REPAIR. FBC 107.2.1
  
 2) PLEASE SHOW THE LOCATIONS AND SIZES OF THE WINDOWS
 TO BE REPLACED. FBC 107.2.1
  
 3) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS. FBC 107.2.1
  
 4) DRAWING S-00 REFERS TO ASCE 7-10 - SHOULD BE ASCE
 7-16 PER FBC CHAPTER 35
  
 5) PLEASE PROVIDE THE DETAILS FOR THE NEW GUARD RAILS -
 FBC 107.2.1
  
 6) THRESHOLD BLDG. REQUIRED STATEMENT: FBC W.P.B.
 AMENDMENT 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH
 ARE REQUIRED TO BE SIGNED AND SEALED BY THE ARCHITECT
 OR ENGINEER OF RECORD SHALL CONTAIN A STATEMENT THAT,
 TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S KNOWLEDGE,
 THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE
 MINIMUM BUILDING CODES AND THE APPLICABLE FIRE-SAFETY
 STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN
 ACCORDANCE WITH THIS SECTION AND CHAPTER 633 FLORIDA
 STATUTES.
  
 7) THE PROVIDED SIGNED AND SEALED DRAWINGS AND
 THRESHOLD FORM DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE
 READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED
 TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2023-07-11 Cont ID  
Sent By jleahy Date 2023-07-11 Time 16:31 Rev Time 0.00
Received By jleahy Date 2023-07-11 Time 16:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-05-04 Cont ID  
Sent By jleahy Date 2023-05-04 Time 17:17 Rev Time 0.00
Received By jleahy Date 2023-05-04 Time 17:08 Sent To  
Notes
2023-05-04 17:19:08 
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NO ELECTRICAL WORK SHOWN. PLEASE INDICATE IN COMMENTS
 BACK TO CITY IF ANY ELECTRICAL WORK WILL BE INVOLVED.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-07-12 Cont ID  
Sent By cseifer Date 2023-07-12 Time 12:15 Rev Time 0.00
Received By cseifer Date 2023-07-12 Time 12:15 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-06-09 Cont ID  
Sent By parking Date 2023-06-09 Time 09:00 Rev Time 0.00
Received By lquinone Date 2023-06-09 Time 09:00 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-07-06 Cont ID  
Sent By pleduc Date 2023-07-06 Time   Rev Time 0.00
Received By pleduc Date 2023-07-06 Time 11:52 Sent To  
Notes
2023-07-06 11:54:01FIRE PROVISO:
  
 MAINTAIN EXITS AND EXIT ROUTES UNLESS NECESSARY TO
 REPAIR.
  
 SHOULD AN EXIT BE OBSTRUCTED PROVIDE SIGNAGE TO
 ALTERNATE EXIT.
  
 PROTECT PERSONS FROM DEBRIS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2023-04-10 Cont ID  
Sent By cwalker Date 2023-04-10 Time   Rev Time  
Received By cwalker Date   Time   Sent To  
Notes
2023-04-10 10:37:22FIRE PROVISO COMMENT:
  
 ALL REQUIRED MEANS OF EGRESS SHALL BE MAINTAINED DURING
 ALL PHASES OF DEMOLITION AND CONSTRUCTION.
  
 C. WALKER
  
 561-804-4762
  
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-14 Cont ID  
Sent By avolcy Date 2023-07-14 Time 14:29 Rev Time 0.00
Received By avolcy Date 2023-07-03 Time 08:26 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-12 Cont ID  
Sent By aoliver Date 2023-06-12 Time 07:06 Rev Time 0.00
Received By aoliver Date 2023-04-07 Time 14:45 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:42 Rev Time 0.00
Received By rmcphers Date 2023-05-02 Time 10:42 Sent To  
Notes
2023-05-02 10:43:15NOT A SUBSTANTIAL IMPROVEMENT

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:44 Rev Time 0.00
Received By rmcphers Date 2023-05-02 Time 10:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-07-05 Cont ID  
Sent By rmcphers Date 2023-07-05 Time 10:09 Rev Time 0.00
Received By rmcphers Date 2023-07-05 Time 10:08 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:38 Rev Time 0.00
Received By rmcphers Date 2023-05-02 Time 10:38 Sent To  
Notes
2023-05-02 10:39:09SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) THE PROVIDED SIGNED AND SEALED DRAWINGS AND
 THRESHOLD FORM DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE
 READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED
 TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 2 Status P Date 2023-07-05 Cont ID  
Sent By rmcphers Date 2023-07-05 Time 10:24 Rev Time 0.00
Received By rmcphers Date 2023-07-05 Time 10:24 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status F Date 2023-05-02 Cont ID  
Sent By rmcphers Date 2023-05-02 Time 10:44 Rev Time 0.00
Received By rmcphers Date 2023-05-02 Time 10:44 Sent To  
Notes
2023-05-02 10:44:34SEE BUILDING PLAN REVIEW

Review Stop Z ZONING
Rev No 2 Status P Date 2023-07-14 Cont ID  
Sent By avolcy Date 2023-07-14 Time 14:29 Rev Time 0.00
Received By avolcy Date 2023-07-14 Time 14:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2023-06-06 Cont ID  
Sent By AVolcy Date 2023-06-06 Time 14:53 Rev Time 0.00
Received By avolcy Date 2023-06-02 Time 16:25 Sent To  
Notes
2023-06-02 16:53:5206.02.2023 - FAILED
  
 SCOPE OF WORK UNCLEAR. THE APPLICATION STATES THAT THIS
 IS A CONCRETE RESTORATION PROJECT, HOWEVER, FLOOR,
 ROOF, SEAWALL AND DOCK PLANS HAVE BEEN SUBMITTED.
  
 PROVIDE A SURVEY, AND PROPER PLANS WITH THE AREA OF
 WORK HIGHLIGHTED TO REFLECT THE CORRECT SCOPE OF WORK.
  
 **REVIEWED BY:
 GAISHA (ANNE CLERISSE) VOLCY
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved