| 2023-04-21 17:00:32 | 1ST BUILDING REVIEW |
| | RESULTS: CORRECTIONS NEEDED |
| | |
| | CHRISTOPHER S. THROOP, CBO, BN, PX, CFM |
| | PLANS EXAMINER II |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | NFPA 70 2017 EDITION NEC 2017 |
| | |
| | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: |
| | |
| | |
| | 1. PROVIDE A SITE DRAINAGE PLAN PER FBC R401.3 |
| | IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND |
| | INCLUDED BOUNDARY LINE SURVEY. |
| | FBC R401.3 SITE DRAINAGE |
| | SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER |
| | CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT |
| | DOES NOT CREATE A HAZARD. |
| | LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM |
| | FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6 |
| | INCHES WITHIN THE FIRST 10 FEET. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| 2023-03-30 15:12:58 | PETER E VALENTI |
| | BUILDING PLANS EXAMINER II/INSPECTOR |
| | [email protected] |
| | 561 805 6673 |
| | |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC M = FBC MECHANICAL |
| | FBC FG = FBC FUEL GAS |
| | |
| | SIGNATURE REVIEW APPROVED: |
| | |
| | THE SUBMITTED PAPER PLAN SHEET 1 WITH STRUCTURAL |
| | DETAILS HAS ORIGINAL HAND SIGNATURE/SEAL BY THE DESIGN |
| | PROFESSIONAL (ERNEST A. KUONEN P.E.). |