| Plan Review Stops For Permit 23031785 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-06-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-06-13 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-06-13 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2023-06-13 16:00:08 | EVCS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING | | | INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING | | | STATIONS IS AN ACCESSIBLE PARKING SPACE ONLY, ACCESS | | | AISLE, SIGNAGE ETC. PER FBC 502 | | | FBC 406.1.7 ELECTRIC VEHICLE CHARGING STATIONS. | | | ACCESSIBILITY TO ELECTRIC VEHICLE CHARGING STATIONS | | | SHALL BE PROVIDED IN ACCORDANCE WITH CHAPTER 11. | | | | | | 2) THE DRAWINGS SHOW THE CHARGERS ON THE ROOF - PLEASE | | | SHOW THE CORRECT LOCATION OF THE CHARGERS. | | | | | | 3) THE JOB COST APPEARS LOW - PLEASE PROVIDE A COST | | | BREAK DOWN. FOR PERMITTING PURPOSES THE VALUE OF ALL | | | LABOR AND MATERIALS REQUIRED TO COMPLETE THE PROJECT | | | ARE REQUIRED TO BE INCLUDED IN THE COST. FBC WPB 109.3 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-04-11 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-04-11 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2023-04-11 11:21:11 | EVCS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING | | | INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING | | | STATIONS IS AN ACCESSIBLE PARKING SPACE ONLY, ACCESS | | | AISLE, SIGNAGE ETC. PER FBC 502 | | | FBC 406.1.7 ELECTRIC VEHICLE CHARGING STATIONS. | | | ACCESSIBILITY TO ELECTRIC VEHICLE CHARGING STATIONS | | | SHALL BE PROVIDED IN ACCORDANCE WITH CHAPTER 11. | | | | | | 2) THE DRAWINGS SHOW THE CHARGERS ON THE ROOF - PLEASE | | | SHOW THE CORRECT LOCATION OF THE CHARGERS. | | | | | | 3) THE JOB COST APPEARS LOW - PLEASE PROVIDE A COST | | | BREAK DOWN. FOR PERMITTING PURPOSES THE VALUE OF ALL | | | LABOR AND MATERIALS REQUIRED TO COMPLETE THE PROJECT | | | ARE REQUIRED TO BE INCLUDED IN THE COST. FBC WPB 109.3 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-14 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-14 |
Time |
15:21 |
Sent To |
|
|
| Notes |
| 2023-06-14 15:59:14 | FLORIDA BUILDING CODE 2020 7TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | | NFPA 70 2017 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | THE VALUE OF THE WORK IS TO INCLUDE ALL LABOR AND | | | MATERIALS SUPPLIED BY THE CONTRACTOR AND/OR THE | | | CUSTOMER. | | | | | | PLEASE INCLUDE ALL MATERIAL FOR A COMPLETE JOB. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2023-04-04 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-04-04 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-04-04 |
Time |
15:26 |
Sent To |
|
|
| Notes |
| 2023-04-04 15:30:57 | VALUE OF THE WORK TO INCLUDE CHARGING STATIONS JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-14 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-09 |
Time |
08:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-04-28 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-04-28 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-03-31 |
Time |
11:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-14 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-14 |
Time |
15:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2023-04-04 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-04-04 |
Time |
15:31 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-04-04 |
Time |
15:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-06-14 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-06-14 |
Time |
09:56 |
Sent To |
|
|
| Notes |
| 2023-06-14 10:00:04 | 6.14.2023 - FAILED | | | | | | LOCATION OF EVCS PARKING OK. | | | | | | PROVIDE PARKING DETAIL TO SHOW FOOTPRINT AND LOCATION | | | OF MECHANICAL EQUIPMENT. | | | | | | SEE BUILDING COMMENTS FOR ADA ACCESSIBILITY. | | | | | | **REVIEWED BY: | | | GAISHA (ANNE) VOLCY | | | PLANNER | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2023-04-28 |
|
|
Cont ID |
|
| Sent By |
AVolcy |
Date |
2023-04-28 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-04-28 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2023-04-28 16:28:27 | 04.28.2023 FAILED | | | | | | CLARIFY SCOPE OF WORK. HOW MANY PARKING EVCS ARE | | | PROPOSED? | | | | | | SITE PLAN DOES NOT ILLUSTRATE THE PROPOSED EVCS WITHIN | | | PARKING STALLS. | | | | | | PROPOSED EVCS CANNOT BE WITHIN REQUIRED PARKING SPACED. | | | A PRAKING TABLE SHALL BE PROVIDED TO SHOW THAT THIS | | | REQUIREMENT IS BEING MET. | | | | | | THIS PROPERTY IS ZONED CPD (COMMERCIAL PLANNED | | | DEVELOPMENT) AN AMENDMENT TO THE SITE PLAN WILL HAVE TO | | | BE SUBMITTED AND APPROVED PRIOR TO PERMIT APPROVAL. | | | | | | **** REVIEWD BY **** | | | GAISHA (ANNE CLERISSE) VOLCY | | | PLANNER | | | [email protected] | | | |
|
|