| Plan Review Stops For Permit 23031769 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-05-25 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-05-25 |
Time |
14:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-04-10 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-04-10 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-04-10 |
Time |
14:27 |
Sent To |
|
|
| Notes |
| 2023-04-10 14:54:19 | CREATING SHELL SUITES | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS ALS1.1 AND ALS1.2 - UNDER "CODE DATA" SUITE | | | NUMBERS DO NOT MATCH FLOOR PLAN AND INCLUDE ONLY 3 | | | UNITS - PLEASE RE EVALUATE. | | | | | | 2) DRAWINGS ALS1.1 AND ALS1.2 - UNDER "OCCUPANCY LOAD" | | | THE OCCUPANT LOAD SHOULD MATCH THE INFO SHOWN UNDER | | | "CODE DATA" | | | | | | 3) DRAWING A-8.0.1 - DETAIL 6 - OR THE STRUCTURAL | | | DRAWINGS - PLEASE SHOW THE EXTERIOR WALL BOTTOM AND TOP | | | TRACK ATTACHMENTS, SHOW THE PLYWOOD ATTACHMENTS, SHOW | | | THE DENS DECK ATTACHMENTS ETC. FBC WPB 107.2.1 | | | | | | 4) DRAWING A-8.0.1 - DETAIL 6 - PLEASE SHOW THE | | | EXTERIOR WALL WATER RESISTIVE BARRIER - FBC 1404.2 | | | WATER-RESISTIVE BARRIER. | | | NOT FEWER THAN ONE LAYER OF NO.15 ASPHALT FELT, | | | COMPLYING WITH ASTM D226 FOR TYPE 1 FELT OR OTHER | | | APPROVED MATERIALS, SHALL BE ATTACHED TO THE STUDS OR | | | SHEATHING, WITH FLASHING AS DESCRIBED IN SECTION | | | 1405.4, IN SUCH A MANNER AS TO PROVIDE A CONTINUOUS | | | WATER-RESISTIVE BARRIER BEHIND THE EXTERIOR WALL | | | VENEER. | | | | | | 5) PLEASE SHOW THE EXTERIOR WINDOW/DOOR FLASHING PER - | | | FBC 1405.4 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2023-04-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-04-13 |
Time |
17:35 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-04-13 |
Time |
16:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2023-05-23 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-05-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-05-23 |
Time |
14:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2023-04-06 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-04-06 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-04-05 |
Time |
10:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2023-04-10 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-04-10 |
Time |
08:21 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-04-10 |
Time |
08:21 |
Sent To |
|
|
| Notes |
| 2023-04-10 08:21:59 | RESULTS CHANGED TO PASSED - 5-18-23 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-05-25 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-05-22 |
Time |
15:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-05-09 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-05-09 |
Time |
11:05 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-04-03 |
Time |
08:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2023-04-18 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2023-04-18 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2023-04-18 |
Time |
10:28 |
Sent To |
|
|
| Notes |
| 2023-04-18 10:28:50 | SHELL ONLY |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2023-05-24 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-05-24 |
Time |
12:17 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-05-24 |
Time |
12:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2023-04-10 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-04-10 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-04-10 |
Time |
08:07 |
Sent To |
|
|
| Notes |
| 2023-04-10 08:20:00 | 1ST PLUMBING REVIEW | | | | | | THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED | | | BY RYAN BROWN WITH THE FOLLOWING COMMENTS. | | | | | | 1. 2017 WPB AMEND - 105.1/107.3 --THE GREASE TRAP | | | REQUIRES A SEPARATE PERMIT THAT IS REQUIRED TO BE | | | APPLIED FOR PRIOR TO ISSUANCE OF THE PRIMARY PERMIT. | | | YOU CAN SUBMIT AN APPLICATION "TBD" (TO BE DETERMINED) | | | IF YOU DO NOT HAVE A CONTRACTOR SELECTED BY EMAILING A | | | COMPLETED PERMIT APPLICATION TO | | | [email protected]. AFTER YOU HAVE THE PERMIT | | | GENERATED, NOTIFY ME VIA EMAIL OR NOTE IN THE RESPONSE | | | LETTER AND I WILL COMPLY THIS COMMENT. | | | | | | 2. 2020 FPC 708.1.1 AND 708.1.3 - DETAIL THE REQUIRED | | | CLEANOUT AT INTERVALS NO MORE THAN 100 FEET ON THE | | | BUILDING DRAINS AS WELL AS THE REQUIRED CLEANOUTS JUST | | | OUTSIDE THE BUILDING AT THE JUNCTION OF THE BUILDING | | | DRAIN AND THE BUILDING SEWER ON BOTH THE SANITARY AND | | | THE GREASE WASTE. | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | | | | RYAN W. BROWN | | | CHIEF PLUMBING INSPECTOR | | | OFFICE: 561-805-6692 | | | CELL: 561-517-4293 | | | EMAIL: [email protected] | | | | | | | | | V7 FPC - 2020 FLORIDA PLUMBING CODE | | | V7 FGC - 2020 FLORIDA FUEL GAS | | | V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE | | | V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE | | | V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE | | | V7 FEC - 2020 FLORIDA ENERGY CONSERVATION | | | 2021 F.S. - 2021 FLORIDA STATUTES | | | 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE | | | 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE | | | FBC CHAPTER 1 | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-05-24 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-05-24 |
Time |
12:19 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-05-24 |
Time |
12:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2023-04-10 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-04-10 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-04-10 |
Time |
15:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2023-05-09 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-05-09 |
Time |
09:39 |
Rev Time |
0.75 |
| Received By |
eschneid |
Date |
2023-05-09 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|