| 2023-06-06 11:24:29 | FAILED |
| | |
| | 1) UPDATED REPEAT COMMENT: AN UPDATED SITE PLAN WAS NOT |
| | PROVIDED WITH THE RESUBMITTAL (NOTE: THE SURVEY MAY BE |
| | USED AS A BASE FOR THE SITE PLAN IF IT INCLUDES ALL THE |
| | INFORMATION LISTED BELOW). |
| | |
| | A. THE SITE PLAN MUST ACCURATELY SHOW THE LOCATION OF |
| | THE TEMPORARY CONSTRUCTION FENCE, INCLUDING DIMENSIONS |
| | FROM THE CURB AND PROPERTY LINES. |
| | B. THE SITE PLAN MUST ACCURATELY SHOW THE LOCATION OF |
| | THE OVERHEAD PROTECTION, INCLUDING DIMENSIONS. STAFF |
| | SCALED THE 10-FOOT WIDTH OF THE OVERHEAD PROTECTION |
| | (PROVIDED ON THE NEW DETAIL) FROM THE FENCE LOCATION ON |
| | THE SURVEY, WHICH RESULTS IN THE OVERHEAD PROTECTION |
| | BEING CONSTRUCTED IN THE ROSEMARY AVENUE TRAVEL LANE, |
| | WHICH IS NOT PERMITTED UNLESS THIS IS CLEARLY INDICATED |
| | ON THE APPROVED RIGHT-OF-WAY PERMIT. |
| | |
| | 2) UPDATED REPEAT COMMENT: THANK YOU FOR PROVIDING THE |
| | INFORMATION THAT THE FIRE HYDRANTS WITHIN THE |
| | RIGHT-OF-WAY WILL BE CAPPED. DOES THIS MEAN THAT THEY |
| | WILL BE REMOVED? WHAT ABOUT THE OTHER STREET FURNITURE |
| | THAT IS LOCATED IN THE RIGHT-OF-WAY? YOU MUST CLEARLY |
| | CALL OUT WHAT IS PROPOSED TO BE REMOVED AND WHAT IS TO |
| | REMAIN WITHIN THE PEDESTRIAN TRAVEL WAY UNDER THE |
| | OVERHEAD PROTECTION. IF ANY ABOVE GROUND FEATURES |
| | REMAIN, THEN THE SITE PLAN MUST INCLUDE DIMENSIONS TO |
| | CLEARLY DEMONSTRATE THAT THERE IS ADA CLEARANCE. NOTE: |
| | YOU MUST ALSO INDICATED WHAT THE PROPOSED SURFACE |
| | MATERIAL IS TO INFILL WHERE THE LANDSCAPE ISLANDS |
| | CURRENTLY EXIST UNDER THE OVERHEAD PROTECTION. |
| | |
| | 3) REPEAT COMMENT: THE PLANS INDICATE THAT THE FENCE |
| | ALONG ROSEMARY AVENUE WILL BE AT THE INSIDE EDGE OF THE |
| | OVERHEAD PROTECTION AND THUS WITHIN THE RIGHT-OF-WAY. |
| | THE GARDENIA STREET SECTION OF THE FENCE IS CLEARLY |
| | SHOWN IN THE RIGHT-OF-WAY. THE MAJORITY OF THE HIBISCUS |
| | STREET SECTION OF THE FENCE IS CLEARLY SHOWN IN THE |
| | RIGHT-OF-WAY. YOU MUST INCLUDE A COPY OF THE APPROVED |
| | RIGHT-OF-WAY PERMIT FOR THESE SECTIONS OF THE FENCE AND |
| | OVERHEAD PROTECTION PRIOR TO THE ZONING APPROVAL OF |
| | THIS PERMIT. |
| | |
| | 4) REPEAT COMMENT: THE PROPOSED FENCE SHOWS THE |
| | ENCLOSURE OF A NUMBER OF ON-STREET PARKING SPACES. YOU |
| | MUST INCLUDE A COPY OF THE PAID INVOICE TO THE CITY'S |
| | PARKING DEPARTMENT FOR THE REMOVED PARKING SPACES PRIOR |
| | TO THE ZONING APPROVAL OF THIS PERMIT. |
| | |
| | 5) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING |
| | REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING |
| | WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL |
| | THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED. |
| | |
| | 6) UPDATED COMMENT: THE ZONING APPROVAL OF THE |
| | EIGHT-FOOT TALL TEMPORARY CONSTRUCTION FENCE IS ONLY |
| | FOR THE DEMOLITION PHASE OF THE PROJECT AND IS BASED ON |
| | THE PROXIMITY OF THE DEMOLITION ACTIVITY TO THE |
| | PROPERTY LINES. THE TEMPORARY CONSTRUCTION FENCE HEIGHT |
| | CAN BE REVIEWED AT SUCH TIME AS A PERMIT FOR THE |
| | FOUNDATION IS SUBMITTED. |
| | |
| | CONTACT ERIC SCHNEIDER @ 561-822-1446 |
| | [email protected] |
| | |