Plan Review Details - Permit 23031377
Plan Review Stops For Permit 23031377
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2023-04-10 Cont ID  
Sent By cpuell Date 2023-04-10 Time 11:35 Rev Time 0.00
Received By cpuell Date 2023-04-10 Time 11:35 Sent To  
Notes
2023-04-10 11:36:42ADDITIONAL PERMITS APPLIED FOR ALL THE PARCELS, SEE
 23031377, 23040235, 23040234, 23040233, 23040232 AND
 23040231

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2023-04-03 Cont ID  
Sent By cpuell Date 2023-04-03 Time 14:32 Rev Time 0.00
Received By cpuell Date 2023-04-03 Time 14:31 Sent To  
Notes
2023-04-03 14:32:05AS ACKNOWLEDGED IN THE APPLICATION FORM, THE WORK
 ENCOMPASSES 6 PARCELS (THE APPLICATION LISTS
 74434321130030010) AND THE REMAINING PARCELS NEED A
 PERMIT: 74434321130030020, 74434321130030080,
 74434321130030060, 74434321130030050 AND
 74434321130030070. PLEASE INFORM [email protected]
 OR CALL 561-805-6659 ONCE PERMITS HAVE BEEN APPLIED FOR
 ALL 6 PARCELS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-06-30 Cont ID  
Sent By pvalenti Date 2023-06-30 Time 07:39 Rev Time 0.00
Received By pvalenti Date 2023-06-29 Time 11:13 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-22 Cont ID  
Sent By pvalenti Date 2023-06-22 Time 16:43 Rev Time 0.00
Received By pvalenti Date 2023-06-22 Time 15:10 Sent To  
Notes
2023-06-22 17:12:28PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 1.) FBC B 107.2.1, FBC B 3306.1 THROUGH FBC B 3306.9:
 PROVIDE ALL DETAILS AS REQUIRED BY THIS CODE SECTION
 INCLUDING CONNECTION DETAILS & WIDTH/HEIGHT
 MEASUREMENTS.
  
 2.) WPB AMENDMENTS TO FBC B 107.2.1: PROVIDE THE
 SIGNATURE OF THE CONTRACTOR/INDIVIDUAL RESPONSIBLE FOR
 DESIGN ON EACH OF THE PLAN SHEETS SUBMITTED FOR THE
 DESIGN OF THE COVERED WALKWAY INCLUDING ALL CONNECTION
 DETAILS AND LOAD DESIGNS.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-07-03 Cont ID  
Sent By cseifer Date 2023-07-03 Time 12:49 Rev Time 0.00
Received By cseifer Date 2023-07-03 Time 12:49 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-06-02 Cont ID  
Sent By lquinone Date 2023-06-02 Time 15:09 Rev Time 0.00
Received By lquinone Date 2023-06-02 Time 15:09 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-04-13 Cont ID  
Sent By lquinone Date 2023-04-13 Time 07:46 Rev Time 0.00
Received By lquinone Date 2023-04-13 Time 07:46 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2023-06-30 Cont ID  
Sent By clfranci Date 2023-06-30 Time   Rev Time 0.00
Received By clfranci Date 2023-06-30 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-05-26 Cont ID  
Sent By pleduc Date 2023-05-26 Time   Rev Time 0.00
Received By pleduc Date 2023-05-26 Time 09:22 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2023-04-04 Cont ID  
Sent By pleduc Date 2023-04-04 Time   Rev Time 0.00
Received By pleduc Date 2023-04-04 Time 16:07 Sent To  
Notes
2023-04-04 16:11:21FIRE COMMENT:
  
 IT IS RECOMMENDED THAT ALL GATES BE EQUIPPED WITH
 A KNOX PADLOCK FOR FD EMERGENCY ACCESS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-07-06 Cont ID  
Sent By aoliver Date 2023-07-06 Time 06:48 Rev Time 0.00
Received By aoliver Date 2023-06-28 Time 18:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-06-23 Cont ID  
Sent By pvalenti Date 2023-06-23 Time 11:25 Rev Time 0.00
Received By pvalenti Date 2023-06-08 Time 10:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-06-06 Cont ID  
Sent By lmarchan Date 2023-06-06 Time 12:16 Rev Time 0.00
Received By lmarchan Date 2023-05-25 Time 16:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-05-10 Cont ID  
Sent By lmarchan Date 2023-05-10 Time 14:38 Rev Time 0.00
Received By lmarchan Date 2023-04-03 Time 13:22 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2023-07-05 Cont ID  
Sent By eschneid Date 2023-07-05 Time 18:29 Rev Time 0.25
Received By eschneid Date 2023-07-05 Time 18:18 Sent To  
Notes
2023-07-05 18:30:11PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING
 REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING
 WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL
 THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED.
  
 CONDITION: THE ZONING APPROVAL OF THE EIGHT-FOOT TALL
 TEMPORARY CONSTRUCTION FENCE IS ONLY FOR THE DEMOLITION
 PHASE OF THE PROJECT AND IS BASED ON THE PROXIMITY OF
 THE DEMOLITION ACTIVITY TO THE PROPERTY LINES.
  
  

Review Stop Z ZONING
Rev No 3 Status F Date 2023-06-16 Cont ID  
Sent By eschneid Date 2023-06-16 Time 09:55 Rev Time 0.50
Received By eschneid Date 2023-06-14 Time 17:49 Sent To  
Notes
2023-06-16 09:56:09FAILED
  
 1) UPDATED COMMENT: THE UPDATED SITE PLAN SHOWS THAT
 THE FENCE WILL BE LOCATED 2.5 FEET FROM THE PROPERTY
 LINE. WHEN COMPARED TO THE DIMENSIONS PROVIDED ON THE
 OVERHEAD PROTECTION CROSS SECTION DRAWING, THIS RESULTS
 IN THE CONCRETE BARRIER LOCATED IN THE VALLEY GUTTER,
 WHICH IS NOT PERMITTED. ALL DRAWINGS MUST SHOW
 CONSISTENT, ACCURATE DIMENSIONS FOR THE FENCE, THE
 OVERHEAD PROTECTION, THE CONCRETE BARRIERS, THE
 PROPERTY LINE AND THE VALLEY GUTTER LOCATIONS.
  
 2) UPDATED COMMENT: THANK YOU FOR PROVIDING THE
 RIGHT-OF-WAY APPROVAL FOR GARDENIA AND HIBISCUS. STAFF
 HAS SPOKEN WITH ENGINEERING REGARDING ROSEMARY AND THEY
 HAVE ACKNOWLEDGED THAT THE RIGHT-OF-WAY PERMIT DOES NOT
 CURRENTLY INCLUDE THE USE OF ROSEMARY FOR THE
 INSTALLATION OF THE FENCE AND OVERHEAD COVER. PLEASE
 UPLOAD THE UPDATED RIGHT-OF-WAY PERMIT THAT COVERS
 ROSEMARY AVENUE PRIOR TO THE ZONING APPROVAL OF THIS
 PERMIT.
  
 3) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING
 REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING
 WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL
 THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED.
  
 4) CONDITION: THE ZONING APPROVAL OF THE EIGHT-FOOT
 TALL TEMPORARY CONSTRUCTION FENCE IS ONLY FOR THE
 DEMOLITION PHASE OF THE PROJECT AND IS BASED ON THE
 PROXIMITY OF THE DEMOLITION ACTIVITY TO THE PROPERTY
 LINES.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status F Date 2023-06-06 Cont ID  
Sent By eschneid Date 2023-06-06 Time 11:22 Rev Time 0.00
Received By eschneid Date 2023-06-06 Time 09:19 Sent To  
Notes
2023-06-06 11:24:29FAILED
  
 1) UPDATED REPEAT COMMENT: AN UPDATED SITE PLAN WAS NOT
 PROVIDED WITH THE RESUBMITTAL (NOTE: THE SURVEY MAY BE
 USED AS A BASE FOR THE SITE PLAN IF IT INCLUDES ALL THE
 INFORMATION LISTED BELOW).
  
 A. THE SITE PLAN MUST ACCURATELY SHOW THE LOCATION OF
 THE TEMPORARY CONSTRUCTION FENCE, INCLUDING DIMENSIONS
 FROM THE CURB AND PROPERTY LINES.
 B. THE SITE PLAN MUST ACCURATELY SHOW THE LOCATION OF
 THE OVERHEAD PROTECTION, INCLUDING DIMENSIONS. STAFF
 SCALED THE 10-FOOT WIDTH OF THE OVERHEAD PROTECTION
 (PROVIDED ON THE NEW DETAIL) FROM THE FENCE LOCATION ON
 THE SURVEY, WHICH RESULTS IN THE OVERHEAD PROTECTION
 BEING CONSTRUCTED IN THE ROSEMARY AVENUE TRAVEL LANE,
 WHICH IS NOT PERMITTED UNLESS THIS IS CLEARLY INDICATED
 ON THE APPROVED RIGHT-OF-WAY PERMIT.
  
 2) UPDATED REPEAT COMMENT: THANK YOU FOR PROVIDING THE
 INFORMATION THAT THE FIRE HYDRANTS WITHIN THE
 RIGHT-OF-WAY WILL BE CAPPED. DOES THIS MEAN THAT THEY
 WILL BE REMOVED? WHAT ABOUT THE OTHER STREET FURNITURE
 THAT IS LOCATED IN THE RIGHT-OF-WAY? YOU MUST CLEARLY
 CALL OUT WHAT IS PROPOSED TO BE REMOVED AND WHAT IS TO
 REMAIN WITHIN THE PEDESTRIAN TRAVEL WAY UNDER THE
 OVERHEAD PROTECTION. IF ANY ABOVE GROUND FEATURES
 REMAIN, THEN THE SITE PLAN MUST INCLUDE DIMENSIONS TO
 CLEARLY DEMONSTRATE THAT THERE IS ADA CLEARANCE. NOTE:
 YOU MUST ALSO INDICATED WHAT THE PROPOSED SURFACE
 MATERIAL IS TO INFILL WHERE THE LANDSCAPE ISLANDS
 CURRENTLY EXIST UNDER THE OVERHEAD PROTECTION.
  
 3) REPEAT COMMENT: THE PLANS INDICATE THAT THE FENCE
 ALONG ROSEMARY AVENUE WILL BE AT THE INSIDE EDGE OF THE
 OVERHEAD PROTECTION AND THUS WITHIN THE RIGHT-OF-WAY.
 THE GARDENIA STREET SECTION OF THE FENCE IS CLEARLY
 SHOWN IN THE RIGHT-OF-WAY. THE MAJORITY OF THE HIBISCUS
 STREET SECTION OF THE FENCE IS CLEARLY SHOWN IN THE
 RIGHT-OF-WAY. YOU MUST INCLUDE A COPY OF THE APPROVED
 RIGHT-OF-WAY PERMIT FOR THESE SECTIONS OF THE FENCE AND
 OVERHEAD PROTECTION PRIOR TO THE ZONING APPROVAL OF
 THIS PERMIT.
  
 4) REPEAT COMMENT: THE PROPOSED FENCE SHOWS THE
 ENCLOSURE OF A NUMBER OF ON-STREET PARKING SPACES. YOU
 MUST INCLUDE A COPY OF THE PAID INVOICE TO THE CITY'S
 PARKING DEPARTMENT FOR THE REMOVED PARKING SPACES PRIOR
 TO THE ZONING APPROVAL OF THIS PERMIT.
  
 5) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING
 REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING
 WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL
 THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED.
  
 6) UPDATED COMMENT: THE ZONING APPROVAL OF THE
 EIGHT-FOOT TALL TEMPORARY CONSTRUCTION FENCE IS ONLY
 FOR THE DEMOLITION PHASE OF THE PROJECT AND IS BASED ON
 THE PROXIMITY OF THE DEMOLITION ACTIVITY TO THE
 PROPERTY LINES. THE TEMPORARY CONSTRUCTION FENCE HEIGHT
 CAN BE REVIEWED AT SUCH TIME AS A PERMIT FOR THE
 FOUNDATION IS SUBMITTED.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2023-05-10 Cont ID  
Sent By ESchneid Date 2023-05-10 Time 09:54 Rev Time 0.50
Received By eschneid Date 2023-05-10 Time 09:54 Sent To  
Notes
2023-05-10 09:54:55FAILED
  
 1) PROVIDE THE SURVEY FOR THE C BLOCK. THE SURVEY SHALL
 SHOW THE LOCATIONS OF THE FIRE HYDRANTS THAT ARE
 REFERENCED ON THE SITE PLAN.
  
 2) THE SITE PLAN MUST CLEARLY SHOW THE DIMENSION OF THE
 OVERHEAD PROTECTION AND THE LOCATION OF THE FIRE
 HYDRANTS. A REVIEW OF GOOGLE STREET VIEW IN
 RELATIONSHIP TO THE SITE PLAN SHOWS THAT THE HYDRANTS
 ARE NOT ON PRIVATE PROPERTY, NOR MORE THAN 8 FEET FROM
 THE CURB LINE (EDGE OF THE OVERHEAD PROTECTION
 LOCATION). YOU MUST CLEARLY DEMONSTRATE THAT THERE IS
 ADA CLEARANCE UNDER THE OVERHEAD PROTECTION AT THE
 LOCATION OF THE HYDRANTS.
  
 3) THE PLANS INDICATE THAT THE FENCE ALONG ROSEMARY
 AVENUE WILL BE AT THE INSIDE EDGE OF THE OVERHEAD
 PROTECTION AND THUS WITHIN THE RIGHT-OF-WAY. THE
 GARDENIA STREET SECTION OF THE FENCE IS CLEARLY SHOWN
 IN THE RIGHT-OF-WAY. THE MAJORITY OF THE HIBISCUS
 STREET SECTION OF THE FENCE IS CLEARLY SHOWN IN THE
 RIGHT-OF-WAY. YOU MUST INCLUDE A COPY OF THE APPROVED
 RIGHT-OF-WAY PERMIT FOR THESE SECTIONS OF THE FENCE AND
 OVERHEAD PROTECTION PRIOR TO THE ZONING APPROVAL OF
 THIS PERMIT.
  
 4) THE PROPOSED FENCE SHOWS THE ENCLOSURE OF A NUMBER
 OF ON-STREET PARKING SPACES. YOU MUST INCLUDE A COPY OF
 THE PAID INVOICE TO THE CITY'S PARKING DEPARTMENT FOR
 THE REMOVED PARKING SPACES PRIOR TO THE ZONING APPROVAL
 OF THIS PERMIT.
  
 5) PROVIDE THE DETAILS OF THE WIND SCREEN FOR THE MESH
 PORTIONS OF THE FENCE, TO INCLUDE VERIFICATION THAT IT
 HAS NO LESS THAN 83 PERCENT OPACITY.
  
 6) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING
 REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING
 WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL
 THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED.
  
 7) THE ZONING APPROVAL OF THE EIGHT-FOOT TALL TEMPORARY
 CONSTRUCTION FENCE IS ONLY FOR THE DEMOLITION PHASE OF
 THE PROJECT AND IS BASED ON THE PROXIMITY OF THE
 DEMOLITION ACTIVITY TO THE PROPERTY LINES.
  
 8) PROVIDE VERIFICATION THAT THE SITE VISIBILITY CORNER
 DIMENSIONS AT THE CORNER OF ROSEMARY AVENUE AND
 HIBISCUS STREET ARE BEING MET.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved