|
 |
 |
 |
 |
 |
Plan Review Details - Permit 23031288
| Plan Review Stops For Permit 23031288 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-06-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-06-28 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-06-28 |
Time |
07:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-04-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-21 |
Time |
13:09 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-21 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2023-04-21 13:19:26 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE ENGINEER OF RECORD THAT SIGNED AND SEALED THE | | | ORIGINAL PLANS JOSEPH BRAVO, PE IS NOT THE ENGINEER | | | THAT SIGNED AND SEALED THE REVISED PLANS (JOUNGHO CHOI, | | | PE). IS MR. CHOI GOING TO ASSUME THE RESPONSIBILITY FOR | | | THE DESIGN OF THIS PROJECT AND BECOME THE NEW ENGINEER | | | OF RECORD. IF SO, HE WILL NEED TO FOLLOW THE RULES FOR | | | ASSUMING THE WORK OF THE ENGINEER OF RECORD. PLEASE | | | CARIFY. FS471 AND FAC 61G-15 | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2023-06-16 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-16 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-16 |
Time |
09:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2023-04-18 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2023-04-18 |
Time |
20:35 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2023-04-18 |
Time |
18:19 |
Sent To |
|
|
| Notes |
| 2023-04-18 20:35:20 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. ORIGINAL SET OF SUBMITTED AND APPROVED DRAWINGS WERE | | | FOR A MICRO-INVERTER SYSTEM WITH A 40AMP BACKFED | | | BREAKER, NOW A SOLAR-EDGE DC SINGLE INVERTER SYSTEM HAS | | | BEEN PROPOSED BUT NO UPDATED ONE-LINE DIAGRAM HAS BEEN | | | SUBMITTED. PLEASE PROVIDE UPDATED AND CODE COMPLIANT | | | ONE-LINE DIAGRAM. FBC 107.2.1 | | | | | | 2. WHY ARE THERE 2 DIFFERENT ENGINEERS SIGNING FOR THE | | | NEW SUBMITTED PAGES, BOTH OF WHICH ARE DIFFERENT FROM | | | THE ENGINEER OF RECORD ON THE ORIGINAL SUBMITTED | | | APPROVED DRAWINGS? | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2020 7TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | | 7TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | | 7TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | FRANK GIAQUINTO III | | | ELECTRICAL INSPECTOR | | | ELECTRICAL PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | [email protected] | | | CELL: 561-805-6744 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-06-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-06-28 |
Time |
07:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-06-05 |
Time |
09:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-05-12 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2023-05-12 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2023-04-12 |
Time |
09:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-06-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-06-28 |
Time |
07:34 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-06-28 |
Time |
07:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-04-21 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-04-21 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-21 |
Time |
13:10 |
Sent To |
|
|
| Notes |
| 2023-04-21 13:12:57 | THE ENGINEER THAT SIGNED AND SEALED THE ORIGINAL PLANS | | | JOSEPH BRAVO, PE IS NOT THE ENGINEER THAT SIGNED AND | | | SEALED THE REVISED PLANS JOUNGHO CHOI, PE. PLEASE | | | CARIFY. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2023-06-14 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2023-06-14 |
Time |
09:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2023-05-12 |
|
|
Cont ID |
|
| Sent By |
VBroglia |
Date |
2023-05-12 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2023-05-12 |
Time |
11:41 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |