| Plan Review Stops For Permit 23030964 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-07-26 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-26 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-26 |
Time |
13:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-07-21 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-21 |
Time |
10:26 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-21 |
Time |
07:49 |
Sent To |
|
|
| Notes |
| 2023-07-21 10:26:35 | JONATHAN BROOKS JR. | | | BUILDING PLANS EXAMINER | | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | | PHONE (561) 805-6656 | | | EMAIL: [email protected] | | | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | | | 1. PLEASE ADDRESS THE SIGNATURE REVIEW COMMENTS. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-07-03 |
Time |
13:02 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-07-03 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2023-07-03 13:03:31 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | | | | 2ND BUILDING REVIEW APPROVAL PENDING APPROVAL OF | | | SIGNATURE REVIEW. | | | | | | | | | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: | | | | | | PLAN SHEET P 410 SUBMITTED DOES NOT APPEAR TO BE SIGNED | | | AND SEALED. | | | | | | 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND | | | SUBMITTED ELECTRONICALLY FOR PUBLIC RECORD SHALL HAVE A | | | VALID DIGITAL SIGNATURE. A SCAN OF A WET SEAL AND | | | SIGNATURE OR DIGITAL SIGNATURE IS NOT CONSIDERED A | | | VALID DIGITAL SIGNATURE. | | | ALL ELECTRONIC DOCUMENTS PREPARED BY ARCHITECTS OR | | | ENGINEERS MUST BE DIGITALLY SIGNED, IN ACCORDANCE WITH | | | 61G1-16 AND 61G15, F.A.C. | | | | | | 2. SUBMIT PLANS WITH A VALID DIGITAL SIGNATURE. | | | FBC 107.2.1 ALL INFORMATION, DRAWINGS, SPECIFICATIONS | | | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE | | | OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO | | | SECTION 107.3.5), CHPT. 471, F.S. & 61G15 AND CHPT. | | | 481, F.S. & 61G1. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-03-21 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-03-21 |
Time |
14:33 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-03-21 |
Time |
07:32 |
Sent To |
|
|
| Notes |
| 2023-03-21 14:34:20 | JONATHAN BROOKS JR. | | | BUILDING PLANS EXAMINER | | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | | PHONE (561) 805-6656 | | | EMAIL: [email protected] | | | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT | | | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. | | | | | | 1. FBC B 107.2.1 PROVIDE A SIGN AND SEALED ROOF | | | DRAINAGE PLAN THAT COMPLIES WITH SECTION 1503 OF THE | | | 2020 FBC-BUILDING AND CHAPTER 11 OF THE 2020 | | | FBC-PLUMBING. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-07-26 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-26 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-21 |
Time |
15:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-07-21 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-21 |
Time |
10:26 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-18 |
Time |
08:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-07-03 |
Time |
13:25 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-07-03 |
Time |
08:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-03-22 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-03-22 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-03-17 |
Time |
07:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
N |
Date |
2023-03-22 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-03-22 |
Time |
12:58 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-03-22 |
Time |
12:58 |
Sent To |
|
|
| Notes |
| 2023-03-22 12:59:47 | CHANGED TO PP INSPECTIOSN ONLY PER SH, REVIEWED UNDER | | | MASTER 21071620 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2023-07-26 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-26 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-26 |
Time |
13:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2023-07-21 |
|
|
Cont ID |
|
| Sent By |
jbrooks |
Date |
2023-07-21 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
jbrooks |
Date |
2023-07-21 |
Time |
07:49 |
Sent To |
|
|
| Notes |
| 2023-07-21 10:24:53 | JONATHAN BROOKS JR. | | | BUILDING PLANS EXAMINER | | | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM | | | PHONE (561) 805-6656 | | | EMAIL: [email protected] | | | | | | 1ST REVIEW: FBC 2020 7TH EDITION | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC | | | RESULTS: DENIED | | | | | | THE SUBMITTED PLAN SHEET P 410 (REVISION 4) DOES NOT | | | APPEAR TO BE SIGNED/SEALED. | | | | | | PLEASE SUBMIT THE REVISED PLAN SHEET P 410 WITH | | | SIGNATURES/SEALS. | | | | | | FS471, DOCUMENTS PREPARED BY AN ENGINEER AND SUBMITTED | | | FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | | ORIGINALS. A SCAN OF A SIGNED PLAN IS NOT CONSIDERED AN | | | ORIGINAL. | | | PLEASE UPLOAD A VALID ELECTRONICALLY SIGNED | | | PLAN/DOCUMENT TO PROJECTDOX | | | PAPER PLANS/DOCUMENTS FOR SIGNATURE REVIEW WILL NO | | | LONGER BE ACCEPTED BY THE CITY OF WEST PALM BEACH | | | BUILDING DEPRTMENT. | | | | | | FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS, | | | 561-805-6656. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-07-03 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-07-03 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2023-07-03 13:17:40 | SIGNATURE REVIEW DENIED: | | | | | | THE CALCULATIONS FOR THE WINDLOADS AND ANCHORING | | | SPACING WERE SUBMITTED ON PAPER WITH ORIGINAL HAND | | | SIGNATURE/SEAL ARE OK. HOWEVER, THE SUBMITTED PLAN | | | SHEET P 410 (REVISION 4) DOES NOT APPEAR TO BE | | | SIGNED/SEALED. | | | | | | PLEASE SUBMIT THE REVISED PLAN SHEET P 410 WITH | | | SIGNATURES/SEALS. | | | | | | FS 471/FS 481 DOCUMENTS PREPARED BY AN | | | ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE | | | TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A | | | SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL. | | | UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY | | | VERIFIED) PLAN: | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | BUILDING DIVISION | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 1ST FLOOR | | | WEST PALM BEACH, FL 33401 | | | FEEL FREE TO CONTACT ME AT 561 805 6673. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-03-20 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-03-20 |
Time |
10:39 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-03-20 |
Time |
10:39 |
Sent To |
|
|
| Notes |
| 2023-03-20 10:43:44 | SIGNATURE REVIEW: | | | | | | 1- HARD COPY OF ENGINEER'S DESIGN PRESSURES HAVE A COPY | | | OF ENGINEER'S DIGITAL SIGNATURE. NEED ORIGINAL | | | SEAL/SIGNATURE WHEN SUBMITTED FOR PUBLIC RECORDS. | | | ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL | | | SIGNATURE. | | | | | | ENGINEERS | | | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND | | | SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. | | | | | | |
|
|