| Plan Review Stops For Permit 23030322 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-07-03 |
Time |
17:01 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-07-03 |
Time |
17:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-06-14 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-06-14 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2023-06-14 08:21:33 | FBC 107.2.1 | | | SCOPE OF WORK MUST BE CLEARLY DEFINED IN CONSTRUCTION | | | DOCUMENTS PROVIDED | | | | | | COMPLY TO SIGNATURE COMMENTS AND RESPOND TO ALL OTHER | | | TRADES COMMENTS |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-04-25 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-04-25 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-04-25 |
Time |
11:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-03-31 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-03-31 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-03-31 |
Time |
10:41 |
Sent To |
|
|
| Notes |
| 2023-03-31 10:42:56 | COMPLY TO ALL TRADES COMMENTS INCLUDING DIGITAL | | | SIGNATURE AND SEAL ON OCRESSPONDING DOCUMENTS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
F |
Date |
2023-07-07 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-07-07 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-07-07 |
Time |
15:28 |
Sent To |
|
|
| Notes |
| 2023-07-07 16:09:25 | FLORIDA BUILDING CODE 2020 7TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | | NFPA 70 2017 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | PLEASE SUBMIT A COST BREAKDOWN OF THE LABOR AND | | | MATERIAL FOR THIS PROJECT. (50K) VALUE IS LOW FOR WORK | | | SHOWN. FBC 109.3 | | | | | | GLASS TEMPERING FURNACE IS TO BE LISTED BY A NATIONALLY | | | RECOGNOZED TESTING LAB. 110.3 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-05 |
Time |
15:29 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-05 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2023-06-05 15:31:02 | FLORIDA BUILDING CODE 2020 7TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | | NFPA 70 2017 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | PLANS ARE NOT SIGNED AND SEALED. 107.2.1 | | | | | | PAGE E-03 DISCONNECT STILL SHOWS 1000A FUSES OR | | | BREAKER. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2023-04-19 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-04-19 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-04-19 |
Time |
15:07 |
Sent To |
|
|
| Notes |
| 2023-04-19 16:29:12 | ELECTRIC REVIEW FAILED | | | | | | 1) OVERCURRENT PROTECTION DETAILED FOR FEEDER TO MDP2 | | | ARE REQUIRED TO BE RATED AT 125% OF THE CONTINUOUS | | | LOAD, (915 X 1.25%= 1144 AMPERES) IN ACCORDANCE WITH | | | NEC 215.3. THE RATING OF THIS DEVICE IS REQUIRED TO BE | | | A MINIMUM RATING OF 1200 AMPS IN ACCORDANCE WITH THE | | | STANDARD AMPERE RATINGS LISTED IN NEC 240.6(A). PLEASE | | | CORRECT FEEDER OVERCURRENT PROTECTION SIZE AS | | | APPLICABLE. | | | | | | 2) FEEDER CONDUCTORS DETAILED FROM FPL TRANSFORMER TO | | | MDS2 AND MDS2 TO MDP2 ARE DETAILED AS (3) SETS OF | | | 400MCM CONDUCTORS WITH A TOTAL AMPACITY OF 1005 AMPS. | | | THE INDUSTRIAL PROCESS GLASS TEMPERING HEATER ARE | | | REQUIRED TO BE CONSIDERED A CONTINUOUS LOAD IN | | | ACCORDANCE WITH NEC 424.3(B). CONDUCTORS SUPPLYING | | | CONTINUOUS LOADS IS REQUIRED TO BE RATED AT 125% OF THE | | | LOAD SERVED IN ACCORDANCE WITH NEC 215.2(A)(1)(A). THE | | | TOTAL LOAD FOR THE GLASS TEMPERING HEATER IS DETAILED | | | AS 915 AMPS. MINIMUM CONDUCTOR AMPACITY REQUIRED IS 915 | | | X 1.25=1144 AMPS. NEC 424.3(B) NEC 215.2(A)(1)(A). | | | IN ADDITION, ENSURE THE CONDUCTOR AMPACITY RATING IS | | | EQUAL OR GREATER THAN THE OVERCURRENT DEVICE PROTECTING | | | WITH A RATING OVER 800 AMPERES, IN ACCORDANCE WITH NEC | | | 240.4(C). PLEASE CORRECT FEEDER CONDUCTOR SIZE AS | | | APPLICABLE. | | | | | | 3) OVERCURRENT PROTECTION DETAILED AS 500 AMPERES FOR | | | BRANCH CIRCUIT CONDUCTORS TO GLASS HEATERS 1 AND 2 ARE | | | REQUIRED TO BE RATED AT 125% OF THE CONTINUOUS LOAD, | | | (349 X 1.25%= 436 AMPERES) IN ACCORDANCE WITH NEC | | | 210.20(A)THE RATING OF THIS DEVICE IS REQUIRED TO BE A | | | MINIMUM RATING OF 450 AMPS IN ACCORDANCE WITH THE | | | STANDARD AMPERE RATINGS LISTED IN NEC 240.6(A) AND A | | | MAXIMUM RATING OF 450 AMPERES IN ACCORDANCE WITH NEC | | | 670.4(C). PLEASE CORRECT BRANCH CIRCUIT OVERCURRENT | | | PROTECTION SIZE AS APPLICABLE. | | | | | | 4) BRANCH CIRCUIT CONDUCTORS DETAILED AS 500MCM TO | | | GLASS HEATERS 1 AND 2 WITH AN AMPACITY OF 380 AMPERES. | | | THE INDUSTRIAL PROCESS GLASS TEMPERING HEATERS 1 AND 2 | | | ARE REQUIRED TO BE CONSIDERED A CONTINUOUS LOAD IN | | | ACCORDANCE WITH NEC 424.3(B). CONDUCTORS SUPPLYING | | | CONTINUOUS LOADS IS REQUIRED TO BE RATED AT 125% OF THE | | | LOAD SERVED IN ACCORDANCE WITH NEC 21O.19(A)(1)(A). THE | | | TOTAL LOAD FOR EACH GLASS TEMPERING HEATER IS DETAILED | | | AS 349 AMPS. MINIMUM CONDUCTOR AMPACITY REQUIRED IS 349 | | | X 1.25=436 AMPERES. PLEASE CORRECT BRANCH CIRCUIT | | | CONDUCTOR SIZE AS APPLICABLE. | | | | | | 5) BRANCH CIRCUIT CONDUCTORS DETAILED AS 4/0. THE | | | LISTED ALLOWED AMPACITY OF 4/0 IS 230 AMPERES. THE | | | BLOWER MOTOR IS REQUIRED TO BE CONSIDERED A CONTINUOUS | | | LOAD IN ACCORDANCE WITH NEC 670.4(A). CONDUCTORS | | | SUPPLYING CONTINUOUS LOADS ARE REQUIRED TO BE RATED AT | | | 125% OF THE LOAD SERVED IN ACCORDANCE WITH NEC | | | 670.4(A). THE TOTAL LOAD FOR THIS MOTOR IS DETAILED AS | | | 224 AMPERES. MINIMUM CONDUCTOR AMPACITY REQUIRED IS 224 | | | X 1.25=280 AMPERES. PLEASE CORRECT BRANCH CIRCUIT | | | CONDUCTOR SIZE AS APPLICABLE. | | | | | | 6) THE PANEL SCHEDULE FOR MDP2 LISTS THE CONTROL | | | CIRCUIT AS HAVING A 100 AMPERE CIRCUIT BREAKER. THE | | | CONDUCTOR SIZE IS LISTED AS A #8 CONDUCTOR. PLEASE | | | CORRECT THE OVERCURRENT PROTECTION SIZE IN ACCORDANCE | | | WITH NEC 240 REQUIREMENTS. PLEASE NOTE: SUBMITTAL OF | | | ADDITIONAL AND/OR REVISED MATERIALS MAY RESULT IN NEW | | | PLAN REVIEW COMMENTS. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. | | | | | | CODES IN EFFECT: | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2020 7TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | | 7TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | | 7TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | MICHAEL PETERSON | | | ELECTRICAL PLANS EXAMINER | | | [email protected] | | | 561-805-6746 | | | | | | | | | 7) VALUE FOR WORK STATED ON PERMIT APPLICATION APPEARS | | | LOW. PROVIDE A BREAKDOWN OF ALL MATERIALS AND LABOR, | | | OR, AT YOUR DISCRETION, PROVIDE A SIGNED CONTRACT OR, | | | PROVIDE A REASONABLE VALUE. WPB F.B.C. 109.3 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2023-03-09 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-03-09 |
Time |
16:21 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-03-09 |
Time |
14:54 |
Sent To |
|
|
| Notes |
| 2023-03-09 16:25:56 | FLORIDA BUILDING CODE 2020 7TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | | NFPA 70 2017 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | NEED SPECS ON EQUIPMENT BEING INSTALLED, GAS FIRED?, | | | ELECTRIC? EXHAUST SYSTEM? SPRINKLER SYSTEM REQUIRED? | | | | | | PLANS NEED TO BE SIGNED AND SEALED BY AN ENGINEER | | | | | | | | | WHERE A BUILDING OR STRUCTURE IS SUPPLIED BY MORE THAN | | | ONE SERVICE, OR ANY COMBINATION OF BRANCH CIRCUITS, | | | FEEDERS, AND SERVICES, A PERMANENT PLAQUE OR DIRECTORY | | | SHALL BE INSTALLED AT EACH SERVICE DISCONNECT LOCATION | | | DENOTING ALL OTHER SERVICES | | | | | | F.S. 471.003 (H)???ANY ELECTRICAL, PLUMBING, | | | AIR-CONDITIONING, OR MECHANICAL CONTRACTOR WHOSE | | | PRACTICE INCLUDES THE DESIGN AND FABRICATION OF | | | ELECTRICAL, PLUMBING, AIR-CONDITIONING, OR MECHANICAL | | | SYSTEMS, RESPECTIVELY, WHICH SHE OR HE INSTALLS BY | | | VIRTUE OF A LICENSE ISSUED UNDER CHAPTER 489, UNDER | | | 1PART I OF CHAPTER 553, OR UNDER ANY SPECIAL ACT OR | | | ORDINANCE WHEN WORKING ON ANY CONSTRUCTION PROJECT | | | WHICH: | | | | | | 1.???REQUIRES AN ELECTRICAL OR PLUMBING OR | | | AIR-CONDITIONING AND REFRIGERATION SYSTEM WITH A VALUE | | | OF $125,000 OR LESS; AND | | | | | | 2.A .REQUIRES AN AGGREGATE SERVICE CAPACITY OF 600 | | | AMPERES (240 VOLTS) OR LESS ON A RESIDENTIAL ELECTRICAL | | | SYSTEM OR 800 AMPERES (240 VOLTS) OR LESS ON A | | | COMMERCIAL OR INDUSTRIAL ELECTRICAL SYSTEM; | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
clfranci |
Date |
2023-07-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
clfranci |
Date |
2023-07-03 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2023-05-31 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-05-31 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-05-31 |
Time |
12:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2023-04-17 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-04-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-04-17 |
Time |
11:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2023-03-10 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-03-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-03-10 |
Time |
13:55 |
Sent To |
|
|
| Notes |
| 2023-03-10 14:00:54 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE IS AN INDICATION OF A GLASS TEMPERING | | | FURNANCE. | | | | | | THIS FURNACE APPEARS TO BE NEW EQUIPMENT THAT HAS NO | | | PERMIT RECORD FOR LIFE AND FIRE SAFETY. | | | | | | PLEASE REVIEW YOUR RECORDS FOR A PERMIT # AND PROVIDE, | | | OR CONTACT THE BUILDING DEPEARTMENT FOR THEIR PERMIT | | | REQUIREMENTS. | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | 2023-03-09 16:38:48 | SENT THIS TO FIRE FOR REVIEW DUE TO NATURE OF | | | EQUIPMENT. JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
amcgrego |
Date |
2023-07-26 |
Time |
08:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-07-18 |
|
|
Cont ID |
|
| Sent By |
cmontell |
Date |
2023-07-18 |
Time |
12:19 |
Rev Time |
0.00 |
| Received By |
cmontell |
Date |
2023-07-18 |
Time |
12:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-06-20 |
|
|
Cont ID |
|
| Sent By |
cmontell |
Date |
2023-06-20 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
cmontell |
Date |
2023-06-20 |
Time |
13:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-04-25 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-04-25 |
Time |
11:43 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-04-14 |
Time |
14:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-03-31 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-03-31 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-03-08 |
Time |
08:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2023-07-18 |
|
|
Cont ID |
|
| Sent By |
cmontell |
Date |
2023-07-18 |
Time |
12:19 |
Rev Time |
0.00 |
| Received By |
cmontell |
Date |
2023-07-18 |
Time |
12:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2023-06-20 |
|
|
Cont ID |
|
| Sent By |
cmontell |
Date |
2023-06-20 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
cmontell |
Date |
2023-06-20 |
Time |
13:20 |
Sent To |
|
|
| Notes |
| 2023-06-20 13:21:31 | PLAN REVIEW FAIL | | | | | | 1 THERE IS NOT ENOUGH INFORMATION SUBMITTED TO DO A | | | MECHANICAL REVIEW. PLEASE SUBMIT A COMPLETE MECHANICAL | | | DESIGN FOR THIS NEWLY ADDED FURNACE, INCLUDING A | | | DRAWING OF THE BUILD, SITE PLAN, EXHAUST FOR THIS | | | FURNACE, TYPE OF FUEL FOR THIS FURNACE AND A | | | VENTILATION PLAN FOR THE COMBUSTION, MAKE-UP AIR AND | | | EXHAUST AIR FOR THIS FURNACE. FBC 107.3.5. | | | | | | CHRIS MONTELLO | | | 561-805-6733 | | | | | | | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2023-04-25 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2023-04-25 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2023-04-25 |
Time |
11:32 |
Sent To |
|
|
| Notes |
| 2023-04-25 11:36:32 | 2ND CYCLE REVIEW: | | | RESPOND TO THE FIRST CYCLE REVIEW COMMENTS BELOW: | | | | | | 1ST REVIEW FMC | | | PERMIT: 23030322 | | | | | | CODES IN EFFECT: 2020 | | | | | | FBC- FLORIDA BUILDING CODE | | | FMC- FLORIDA MECHANICAL CODE | | | FEC- FLORIDA ENERGY CONSERVATION | | | FGC- FLORIDA FUEL GAS | | | FEX- FLORIDA EXISTING BUILDING CODE | | | FRC- FLORIDA RESIDENTIAL BUILDING CODE | | | F.S.- FLORIDA STATUTES | | | FAC- FLORIDA ACCESSIBILITY CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THERE IS NOT ENOUGH INFORMATION SUBMITTED TO DO A | | | MECHANICAL REVIEW. PLEASE SUBMIT A COMPLETE MECHANICAL | | | DESIGN FOR THIS NEWLY ADDED FURNACE, INCLUDING A | | | DRAWING OF THE BUILD, SITE PLAN, EXHAUST FOR THIS | | | FURNACE, TYPE OF FUEL FOR THIS FURNACE AND A | | | VENTILATION PLAN FOR THE COMBUSTION, MAKE-UP AIR AND | | | EXHAUST AIR FOR THIS FURNACE. FBC 107.3.5 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2023-03-13 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2023-03-13 |
Time |
14:39 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2023-03-13 |
Time |
14:39 |
Sent To |
|
|
| Notes |
| 2023-03-13 14:40:12 | 1ST REVIEW FMC | | | PERMIT: 23030322 | | | | | | CODES IN EFFECT: 2020 | | | | | | FBC- FLORIDA BUILDING CODE | | | FMC- FLORIDA MECHANICAL CODE | | | FEC- FLORIDA ENERGY CONSERVATION | | | FGC- FLORIDA FUEL GAS | | | FEX- FLORIDA EXISTING BUILDING CODE | | | FRC- FLORIDA RESIDENTIAL BUILDING CODE | | | F.S.- FLORIDA STATUTES | | | FAC- FLORIDA ACCESSIBILITY CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) THERE IS NOT ENOUGH INFORMATION SUBMITTED TO DO A | | | MECHANICAL REVIEW. PLEASE SUBMIT A COMPLETE MECHANICAL | | | DESIGN FOR THIS NEWLY ADDED FURNACE, INCLUDING A | | | DRAWING OF THE BUILD, SITE PLAN, EXHAUST FOR THIS | | | FURNACE, TYPE OF FUEL FOR THIS FURNACE AND A | | | VENTILATION PLAN FOR THE COMBUSTION, MAKE-UP AIR AND | | | EXHAUST AIR FOR THIS FURNACE. FBC 107.3.5 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2023-07-03 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-07-03 |
Time |
17:05 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-07-03 |
Time |
17:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-06-05 |
Time |
15:31 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-06-05 |
Time |
15:31 |
Sent To |
|
|
| Notes |
| 2023-06-05 15:32:00 | PLANS NOT SIGNED AND SEALED BY ENGINEER JLEAHY |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-04-17 |
|
|
Cont ID |
|
| Sent By |
lbond |
Date |
2023-04-17 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
lbond |
Date |
2023-04-17 |
Time |
14:35 |
Sent To |
|
|
| Notes |
| 2023-06-14 08:24:04 | PROVISO DOCUMENTS MUST BE DIGITALLY SIGNED AND SELAED | | | BY ENGINEER | | | CONTRACTOR NOT SUFFICIENT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2023-03-09 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-03-09 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-03-09 |
Time |
14:54 |
Sent To |
|
|
| Notes |
| 2023-03-09 16:32:41 | | | | FLORIDA BUILDING CODE 2020 7TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED | | | NFPA 70 2017 EDITION | | | | | | JAKE LEAHY | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6713 | | | [email protected] | | | | | | | | | | | | PLANS NEED TO BE SIGNED AND SEALED BY AN ENGINEEER. | | | JLEAHY | | | | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE THE PREVIOUSLY | | | REVIEWED SHEETS. ONE COPY OF THE PREVIOUSLY REVIEWED | | | SHEETS SHOULD REMAIN IN PACKAGE AND BE MARKED OLD | | | SHEETS. | | | | | | |
|
|