| 2023-03-08 10:08:04 | TEMPORARY MEMBRANE STRUCTURES (TENTS) |
| | |
| | BUILDING PLAN REVIEW |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | FBC SECTION 3103 TEMPORARY STRUCTURES |
| | F.S. 553.79 THRESHOLD STRUCTURES |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 1. FOR TEMPORARY MEMBRANE STRUCTURES (TENTS) WITH A |
| | SPAN OF 40 FEET OR GREATER IN ANY DIRECTION: |
| | |
| | A. PROVIDE DETAILS OF STRUCTURAL CONNECTIONS. INCLUDE |
| | BASEPLATE/TIEDOWN DETAILS.(REVIEWED AND PENDING RECEIPT |
| | OF WIND LOAD DESIGN CALC'S) |
| | B. PROVIDE STRUCTURAL EVALUATION PER FBC CHPT 16/ ASCE |
| | 7-16 OF STRUCTURE. PROVIDE WIND LOAD DESIGN CRITERIA |
| | FOR ALL TENTS WITH A SPAN OF 40 FEET OR GREATER IN ANY |
| | DIRECTION. |
| | |
| | THESE DOCUMENTS SHALL BE REVIEWED, SIGNED AND SEALED BY |
| | A DESIGN PROFESSIONAL. |
| | |
| | NO EXCEPTIONS BY ORDER OF THE BUILDING OFFICIAL |
| | |
| | _______________________________________________________ |
| | _________ |
| | |
| | 2. LAND BASED STRUCTURES A, B & C ARE POTENTIAL |
| | THRESHOLD STRUCTURES. PROVIDE THE OCCUPANCY RATING OF |
| | THESE THREE STRUCTURES. SEE COMMENTS UNDER THRESHOLD |
| | REVIEW. |
| | |
| | ***ADDITIONAL REQUIREMENTS*** |
| | FOR TEMPORARY MEMBRANE STRUCTURES (TENTS) WITH AN |
| | ASSEMBLY OCCUPANCY CLASSIFICATION AS DEFINED IN THE |
| | FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN |
| | AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 |
| | PERSONS. |
| | |
| | FLORIDA STATUTE 553.79 THREHOLD STRUCTURE MAY APPLY |
| | |
| | A. PROVIDE THRESHOLD INSPECTOR AGREEMENT ??? WILL BE |
| | PROVIDED TO APPLICANT |
| | B. PROVIDE THRESHOLD INSPECTION PLAN |
| | C. PROVIDE AFFIDAVIT ???CERTIFICATE OF CODE |
| | COMPLIANCE??? |
| | |
| | 3. PROVIDE THE CERTIFICATION OF FLAME RESISTANCE FOR |
| | ALL TEMPORARY MEMBRANE STRUCTURES. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | |