| 2023-02-27 09:44:30 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC EB 706.3(1) PROVIDE A SIGNED AND SEALED MOISTURE |
| | REPORT PREPARED BY A FLORIDA REGISTERED DESIGN |
| | PROFESSIONAL FOR AREAS TO RECEIVE RECOVER APPLICATION. |
| | 2. GENERAL LIMITATION #7 IS SPECIFICALLY REFERRED TO IN |
| | PRODUCT APPROVAL FL15894-R20 SYSTEM NO. R-M-6. |
| | PERIMETER AND CORNER AREAS SHALL COMPLY WITH THE |
| | ENHANCED UPLIFT PRESSURE REQUIREMENTS OF THESE AREAS. |
| | FASTENER DENSITIES SHALL BE INCREASED FOR BOTH |
| | INSULATION AND BASE SHEET AS CALCULATED IN COMPLIANCE |
| | WITH ROOFING APPLICATION STANDARD RAS 117. CALCULATIONS |
| | PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED |
| | PROFESSIONAL ENGINEER, REGISTERED ARCHITECT, OR |
| | REGISTERED ROOF CONSULTANT. NOTE: THIS PROJECT IS |
| | LOCATED IN AN EXPOSURE CATEGORY D AREA. |
| | 3. FBC B 107.2.1 PROVIDE A ROOF DRAINAGE PLAN THAT |
| | COMPLIES WITH SECTION 903.4 OF THE 2020 FBC-RESIDENTIAL |
| | AND CHAPTER 11 OF THE 2020 FBC-PLUMBING |
| | 4. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| | CLEARLY IDENTIFIED ON DRAWING; IDENTIFY AREAS TO |
| | RECEIVE RECOVER APPLICATION & AREAS TO RECEIVE ROOF |
| | COATING; INCLUDE ROOF SLOPE(S), MEAN ROOF HEIGHT(S). |
| | FLAT/LOW SLOPE ROOFS MUST SHOW POSITIVE DRAINAGE. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |