| 2023-02-24 09:41:10 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| | DIAGRAM/SKETCH AND SHOW THE AREAS TO RECEIVE NEW |
| | ROOFING CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF |
| | SLOPE(S), MEAN ROOF HEIGHT(S). |
| | 2. FBC B 107.2.1 SUBMITTED ROOF DIAGRAM/SKETCH APPEARS |
| | TO INDICATE REROOFING LOW/FLAT SLOPE AREA (CRICKET); IF |
| | NOT INDICATE BY PLACING AN X IN LOW/FLAT SLOPE AREAS |
| | (CRICKET); IF TO RECEIVE NEW ROOFING PROVIDE A COMPLETE |
| | SET OF 2020 CODE VERSION PRODUCT APPROVALS/NOA'S FOR |
| | THE PROPOSED FLAT ROOF SYSTEM TO BE USED. INCLUDE COVER |
| | PAGE, EVALUATION REPORTS AND INSTALLATION INSTRUCTIONS |
| | FOR SYSTEM USED. ALL APPLICABLE DETAILS AND ATTACHMENTS |
| | MUST BE CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL |
| | DRAWINGS. DETAILS AND ATTACHMENTS NOT SPECIFICALLY |
| | COVERED IN PRODUCT APPROVALS WILL NEED SITE-SPECIFIC |
| | ENGINEERING. REVISE ROOF DIAGRAM/SKETCH TO INCLUDE MEAN |
| | ROOF HEIGHT(S). |
| | 3. FBC B 107.2.1 REVISE SCOPE OF WORK ON PERMIT |
| | APPLICATION TO INCLUDE INCREASE VALUE FOR ROOF-TO-WALL |
| | MITIGATION. WORK TO BE PERFORMED BY A LICENSED |
| | RESIDENTIAL CONTRACTOR, LICENSED BUILDING CONTRACTOR OR |
| | LICENSED GENERAL CONTRACTOR. PROVIDE CONTRACTORS NAME & |
| | LICENSE NUMBER ON PERMIT APPLICATION. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |