| 2023-02-06 11:14:15 | 1ST REVIEW FMC |
| | PERMIT: 23011356 |
| | |
| | CODES IN EFFECT: 2020 |
| | |
| | FBC- FLORIDA BUILDING CODE |
| | FMC- FLORIDA MECHANICAL CODE |
| | FEC- FLORIDA ENERGY CONSERVATION |
| | FGC- FLORIDA FUEL GAS |
| | FEX- FLORIDA EXISTING BUILDING CODE |
| | FRC- FLORIDA RESIDENTIAL BUILDING CODE |
| | F.S.- FLORIDA STATUTES |
| | FAC- FLORIDA ACCESSIBILITY CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | NOT ENOUGH INFORMATION SUBMITTED TO COMPLETE A |
| | MECHANICAL PLAN REVIEW OF THE GREASE HOOD DESIGN AT |
| | THIS TIME. |
| | THE ITEMS LISTED BELOW ARE ONLY A PARTIAL LIST OF |
| | HELPFUL INFORMATION AND IN NO WAY SHOULD THEY BE TAKEN |
| | AS A COMPLETE REVIEW. |
| | |
| | 1) PROVIDE A COMPLETE DESIGN FOR THIS HOOD INCLUDING |
| | THE HOOD TYPE, AND SIZE. SHOW THAT THE GREASE HOOD WILL |
| | MEET CLEARANCES TO COMBUSTIBLES. GREASE DUCT MATERIAL, |
| | SIZE AND TERMINATION DETAILS. FBC 107.3.5 |
| | |
| | 2) SHOW THAT THE GREASE DUCT WILL MEET THE REQUIRED |
| | CLEARANCE TO COMBUSTIBLES. FMC 506 |
| | |
| | 3) PROVIDE THE EQUIPMENT DETAILS FOR THE EQUIPMENT THAT |
| | IS TO BE USED UNDER THIS HOOD. FMC 507.1 |
| | |
| | 4) THE AIR VELOCITY OF THE GREASE DUCT MUST MEET THE |
| | MINIMUM REQUIREMENT IN FMC 506.3.4 |
| | |
| | 5) SHOW THAT THE HOOD EXHAUST OPERATION WILL MEET THE |
| | REQUIREMENTS IN FMC 507.1.1 |
| | |
| | 6) THE SUBMITTED M2.1 AND M6.1 SHEETS HAVE CHANGED FROM |
| | THE APPROVED DRAWINGS. THESE SHEETS SHOULD BE SUBMITTED |
| | AS REVISIONS TO THE APPROVED SET OF DRAWINGS. |
| | |
| | 7) SHOW THAT THE HOOD WILL MEET THE CLEARANCE TO |
| | COMBUSTIBLES REQUIREMENTS OF FMC 507.2.6 |
| | |
| | 8) SHEET M2.1 REFERENCES THE KEF AS AN INLINE BY |
| | GREENHECK QEI-12 BUT IT IS NOT INCLUDED ON THE M6.1 |
| | SCHEDULES. PROVIDE THE INFORMATION FOR THE KEF |
| | INCLUDING THE DETAILS FOR HOW TO ENCLOSE THIS INLINE |
| | FAN. FMC 506.5.1.2 |
| | |
| | 9) SHEET M2.1: THE KSF IS LABELED AS GREENHECK SQ-120- |
| | VG BUT IS NOT SHOWN ON THE SCHEDULES SHEET. PROVIDE |
| | THIS INFORMATION ON THE SCHEDULE SHEET. FBC 107.3.5 |
| | |
| | 10) SHOW THAT THE MAKE UP AIR OPERATION WILL MEET THE |
| | REQUIREMENTS OF FMC 508.1 |
| | |
| | 11) SHEET M2.1: PROVIDE THE INFORMATION FOR THE LOUVERS |
| | OF BOTH THE EXHAUST AND INTAKE ON THE SCHEDULE SHEET. |
| | ALSO PROVIDE NOA???S FOR THESE LOUVERS. FBC 107.3.5 |
| | |
| | 12) PROVIDE A DETAIL DRAWING OF THE GREASE DUCT |
| | INCLUDING SIZES AND CLEANOUTS. FMC 506.3.8 |
| | |
| | 13) PROVIDE A SITE PLAN SHOWING THE GREASE DUCT |
| | TERMINATION LOCATION WILL MEET THE TERMINATION |
| | REQUIREMENTS OF FMC 506.3.13.2 AND 506.3.13.3 |
| | |
| | 14) PROVIDE A SITE PLAN SHOWING THE MAKEUP AIR INTAKE |
| | TERMINATION LOCATION MEETS THE REQUIREMENTS OF FMC |
| | 401.4 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM. |
| | |
| | MICHAEL EDWARDS |
| | MECHANICAL EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL. 33401 |
| | 561-805-6728 |
| | [email protected] |
| | |