| Plan Review Stops For Permit 23011200 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2023-06-09 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-06-09 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-06-09 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-04-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-04-04 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-04-04 |
Time |
07:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2023-03-16 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-03-16 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-03-16 |
Time |
15:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2023-06-07 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-06-07 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-06-07 |
Time |
09:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2023-03-14 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-03-14 |
Time |
16:15 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-03-14 |
Time |
15:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2023-03-31 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-03-31 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-03-31 |
Time |
11:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2023-03-07 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-03-07 |
Time |
08:20 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-03-07 |
Time |
08:20 |
Sent To |
|
|
| Notes |
| 2023-03-07 08:23:00 | 1ST GAS REVIEW | | | | | | THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED | | | BY RYAN BROWN WITH THE FOLLOWING COMMENTS. | | | | | | 1. 2017 WPB AMEND 107.3.5.3 (13) - SHOW THE DETAILS FOR | | | THE GAS SUPPLIED TO THE GRILL OR SHOW THAT IT IS | | | PORTABLE AND NOT CONNECTED TO A "FIXED" GAS SYSTEM. | | | 2020 G2401.1 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | | | | RYAN W. BROWN | | | CHIEF PLUMBING INSPECTOR | | | OFFICE: 561-805-6692 | | | CELL: 561-517-4293 | | | EMAIL: [email protected] | | | | | | | | | V7 FPC - 2020 FLORIDA PLUMBING CODE | | | V7 FGC - 2020 FLORIDA FUEL GAS | | | V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE | | | V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE | | | V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE | | | V7 FEC - 2020 FLORIDA ENERGY CONSERVATION | | | 2021 F.S. - 2021 FLORIDA STATUTES | | | 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE | | | 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE | | | FBC CHAPTER 1 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-06-09 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-06-09 |
Time |
11:11 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-06-02 |
Time |
08:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-04-28 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-04-28 |
Time |
08:04 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-04-28 |
Time |
08:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-03-16 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-03-16 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-03-06 |
Time |
14:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2023-06-05 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-06-05 |
Time |
06:01 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-06-05 |
Time |
06:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2023-03-31 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-03-31 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-03-31 |
Time |
11:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2023-03-07 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-03-07 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-03-07 |
Time |
08:14 |
Sent To |
|
|
| Notes |
| 2023-03-07 08:20:45 | 1ST PLUMBING REVIEW | | | | | | THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED | | | BY RYAN BROWN WITH THE FOLLOWING COMMENTS. | | | | | | 1. 2020 FRC P2801.1 - HOT WATER IS REQUIRED AT THE | | | SINK. | | | | | | 2. 2020 FRC P3101.2.1 - PLEASE DETAIL A VENT FOR THE | | | SINK DRAIN. | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | | | | RYAN W. BROWN | | | CHIEF PLUMBING INSPECTOR | | | OFFICE: 561-805-6692 | | | CELL: 561-517-4293 | | | EMAIL: [email protected] | | | | | | | | | V7 FPC - 2020 FLORIDA PLUMBING CODE | | | V7 FGC - 2020 FLORIDA FUEL GAS | | | V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE | | | V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE | | | V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE | | | V7 FEC - 2020 FLORIDA ENERGY CONSERVATION | | | 2021 F.S. - 2021 FLORIDA STATUTES | | | 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE | | | 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE | | | FBC CHAPTER 1 | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2023-03-16 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-03-16 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-03-16 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2023-03-16 16:25:09 | PROVISO ON PLAN PAGE S-1: A SEPERATE ROOFING PERMIT IS | | | REQUIRED. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-06-09 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-06-09 |
Time |
11:11 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-06-09 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-04-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-04-04 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-04-04 |
Time |
07:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2023-03-16 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-03-14 |
Time |
16:34 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-03-14 |
Time |
16:34 |
Sent To |
|
|
| Notes |
| 2023-03-14 16:37:58 | SIGNATURE REVIEW PASSED. PLANSS ARE SIGNED IN THE | | | SIGNATURE FOLDER. I INFORMED THE CUSTOMER IN THE FUTURE | | | WE WOULD LIKE THE PLANS IN THE DRAWING FOLDER TO BE | | | SIGNED. MP | | | | | | | | | SIGNATURE REVIEW FAILED | | | 1) ALL PLANS DETAIL A DIGITAL SIGNATURE, HOWEVER, NONE | | | CAN BE VERIFIED USING BLUEBEAM, ADOBE SOFTWARE. PLEASE | | | SUBMIT A DGITTALLY VERIFIABLE DIGITAL SIGNATURE AS | | | OUTLINED BELOW. | | | | | | FS471/FS481 DOCUMENTS PREPARED BY ARCHITECT/ENGINEER OF | | | RECORD AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | | DIGITALLY SEALED AND SIGNED. | | | | | | DIGITALLY SUBMITTED DOCUMENTS MUST HAVE A SEAL WITH A | | | DIGITAL SIGNATURE. PLEASE NOTE IT IS EXTREMELY | | | IMPORTANT THAT ALL DIGITAL SIGNATURES ARE VERIFIABLE | | | THROUGH ADOBE OR BLUEBEAM SOFTWARE | | | | | | PLEASE SUBMIT DIGITALLY SEALED AND SIGNED PLANS | | | FOLLOWING PROJECTDOX INSTRUCTIONS | | | | | | MICHAEL PETERSON | | | ELECTRICAL PLANS EXAMINER | | | [email protected] | | | 561-805-6746 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-06-06 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-06-06 |
Time |
11:35 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-06-06 |
Time |
11:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-04-28 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-04-28 |
Time |
07:47 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-04-28 |
Time |
07:47 |
Sent To |
|
|
| Notes |
| 2023-04-28 07:53:52 | 04.28.2023 - FAILED | | | | | | OUTDOOR KITCHEN OK. | | | ROOFED STRUCTURE, HOWEVER, IS NOT MEETING THE BUILDING | | | SEPARATION REQUIREMENT. | | | | | | PER SECTION 94-304(B)(3) OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS, BUILDING SEPARATION: ACCESSORY | | | STRUCTURES COVERED WITH A SOLID ROOF SHALL BE LOCATED | | | NO CLOSER THAN SIX FEET TO THE PRINCIPAL STRUCTURE. | | | ACCESSORY STRUCTURES LESS THAN SIX FEET FROM THE | | | PRIMARY STRUCTURE MUST MEET THE PRIMARY STRUCTURE | | | SETBACKS. ACCESSORY STRUCTURES MAY BE CONNECTED TO THE | | | PRINCIPAL STRUCTURE WITH A CANVAS COVERED OPEN | | | BREEZEWAY. | | | | | | **** REVIEWD BY **** | | | GAISHA (ANNE CLERISSE) VOLCY | | | PLANNER | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2023-03-15 |
|
|
Cont ID |
|
| Sent By |
avolcy |
Date |
2023-03-15 |
Time |
10:55 |
Rev Time |
0.00 |
| Received By |
avolcy |
Date |
2023-03-15 |
Time |
10:54 |
Sent To |
|
|
| Notes |
|
|