Plan Review Details - Permit 23011112
Plan Review Stops For Permit 23011112
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-04-28 Cont ID  
Sent By rmcphers Date 2023-04-28 Time 11:09 Rev Time 0.00
Received By rmcphers Date 2023-04-28 Time 11:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-04-27 Cont ID  
Sent By rmcphers Date 2023-04-27 Time 16:05 Rev Time 0.00
Received By rmcphers Date 2023-04-27 Time 16:05 Sent To  
Notes
2023-04-27 16:06:02EV CHARGING STATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING
 INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING
 STATIONS IS AN ACCESSIBLE PARKING SPACE, ACCESS AISLE,
 SIGNAGE ETC. PER FBC FHA REQUIREMENT 2.ACCESSIBLE AND
 USABLE PUBLIC AND COMMON USE AREAS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-03-24 Cont ID  
Sent By rmcphers Date 2023-03-24 Time 11:45 Rev Time 0.00
Received By rmcphers Date 2023-03-24 Time 11:45 Sent To  
Notes
2023-03-24 11:55:01EV CHARGING STATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING
 INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING
 STATIONS IS AN ACCESSIBLE PARKING SPACE, ACCESS AISLE,
 SIGNAGE ETC. PER FBC FHA REQUIREMENT 2.ACCESSIBLE AND
 USABLE PUBLIC AND COMMON USE AREAS.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-04-04 Cont ID  
Sent By jleahy Date 2023-04-04 Time 08:02 Rev Time 0.00
Received By jleahy Date 2023-04-04 Time 08:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-03-02 Cont ID  
Sent By jleahy Date 2023-03-02 Time 17:43 Rev Time 0.00
Received By jleahy Date 2023-03-02 Time 17:20 Sent To  
Notes
2023-03-02 17:47:44FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NEED TO SUPPLY A LINE DIAGRAM SHOWING WIRE SIZES AND
 BREAKER SIZES.
  
 NEED TO SHOW WHERE THE POWER COMES FROM???? POSSIBLE
 LOAD CALCULATION.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-28 Cont ID  
Sent By asangele Date 2023-04-28 Time 11:43 Rev Time 0.00
Received By asangele Date 2023-04-28 Time 11:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-03-24 Cont ID  
Sent By rmcphers Date 2023-03-24 Time 11:55 Rev Time 0.00
Received By rmcphers Date 2023-02-27 Time 11:59 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-04-04 Cont ID  
Sent By jleahy Date 2023-04-04 Time 08:02 Rev Time 0.00
Received By jleahy Date 2023-04-04 Time 08:02 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-03-02 Cont ID  
Sent By jleahy Date 2023-03-02 Time 17:49 Rev Time 0.00
Received By jleahy Date 2023-03-02 Time 17:49 Sent To  
Notes
2023-03-02 17:51:26PLANS WHEN SUBMITTED WILL NEED TO BE SIGNED BY THE
 QUALIFIER OR ENGINEER WHO IS RESPONSIBLE FOR THE
 DESIGN.

Review Stop Z ZONING
Rev No 4 Status P Date 2023-04-28 Cont ID  
Sent By asangele Date 2023-04-28 Time 11:43 Rev Time 0.00
Received By asangele Date 2023-04-28 Time 11:43 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-04-18 Cont ID  
Sent By asangele Date 2023-04-18 Time 11:11 Rev Time 0.00
Received By asangele Date 2023-04-18 Time 11:11 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2023-04-17 Cont ID  
Sent By asangele Date 2023-04-17 Time 10:56 Rev Time 0.00
Received By asangele Date 2023-04-17 Time 10:56 Sent To  
Notes
2023-04-17 10:57:08FAILED
 3/9/2023
 REPEAT COMMENT
  
  
 MORE INFORMATION HAS TO BE PROVIDED WITH THIS
 APPLICATION PLEASE ADDRESS THE FOLLOWING
  
 EQUAL OPPORTUNITY FOR EV PARKING SPACES MEANING ONE
 SPACE HAS TO BE HANDICAP ACCESSIBLE
  
 WHERE IS THE EQUIPMENT GOING TO BE LOCATED?
  
 PLEASE PROVIDE THE NUMBER OF SPACES BEING PROPOSED TO
 BE EV
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 2023-03-09 Cont ID  
Sent By ASangele Date 2023-03-09 Time 09:47 Rev Time 0.00
Received By asangele Date 2023-03-09 Time 09:47 Sent To  
Notes
2023-03-09 09:56:30FAILED
 3/9/2023
  
 MORE INFORMATION HAS TO BE PROVIDED WITH THIS
 APPLICATION PLEASE ADDRESS THE FOLLOWING
  
  
 EQUAL OPPORTUNITY FOR EV PARKING SPACES MEANING ONE
 SPACE HAS TO BE HANDICAP ACCESSIBLE
  
 WHERE IS THE EQUIPMENT GOING TO BE LOCATED?
  
 PLEASE PROVIDE REQUIRED NUMBER OF PARKING SPACES FOR
 PROPERTY AND WHAT YOUR CURRENT NUMBER OF PARKING SPACES
 IS AND THE NUMBER OF SPACES BEING PROPOSED TO BE EV
  
 EV PARKING SPACING CAN ONLY BE CREATED IF THERE IS
 EXTRA PARKING ON SITE FROM WHAT IS REQUIRED.
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]