Plan Review Details - Permit 23011060
Plan Review Stops For Permit 23011060
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-14 Cont ID  
Sent By jwitmer Date 2023-03-14 Time 11:37 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-02-01 Cont ID  
Sent By jwitmer Date 2023-02-01 Time 15:17 Rev Time  
Received By jwitmer Date   Time   Sent To  
Notes
2023-02-01 15:13:10WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION
 SERVICES/ BUILDING DIVISION
 2020 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 23011060
 ADD: 1801 N FLAGLER DR # 839
 CONT: REGIONS PROPERTY MANAGEMENT & CONSTRUCTION
 TEL: 561-291-9881
 E-MAIL: [email protected]
  
 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: WED. FEB. 01/2023
 ACTION: DENIED
  
 1) THE VALUE OF THE PERMIT APPLICATION IS LESS THAN ??
 THE CALCULATED VALUE. IT APPEARS THE VALUE OF 1,000 SQ.
 FT. THAT YOU DID NOT INCLUDE THE LABOR PER YOUR
 CONTRACT, @ $150/ HR. FOR LABOR. OUR CALCULATED VALUE
 IS
 900 X $11.58 / SQ. FT. = $10,422.00 DOLLARS. LAMINATE
 800 X $9.01 / SQ. FT. = $ 7,208.00 DOLLARS. TILE
 TOTAL $ 17,630.00 TOTAL
  
 FLOORING VALUATION. THE PERMIT VERIFICATION OF VALUE
 COULD NOT OCCUR THIS REVIEW SINCE THE SQ. FT. AREA AND
 FLOOR PRODUCT NOR UNDERLAYMENT WERE NOT PROVIDED. 109.3
 BUILDING PERMIT VALUATION. IF, IN THE OPINION OF THE
 BUILDING OFFICIAL, THE CLAIMED VALUATION OF BUILDING OR
 ALTERATION APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDING OR ALTERATION THE TOTAL
 REPLACEMENT PURPOSES, VALUATION OF THE ALTERATION SHALL
 BE THE TOTAL REPLACEMENT VALUE TO INCLUDE THE
 DEMOLITION, DISPOSAL OF DEBRIS, FLOOR FLASH PATCH,
 UNDERLAYMENT COST AND LABOR, THE FLOOR FINISH COST OF
 MATERIALS AND LABOR PLUS, OVERHEAD AND PROFIT.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.) WITH REGIONAL ADJUSTMENTS
 FOR LOCATION AS PUBLISHED BY THE INTERNATIONAL CODE
 CONGRESS.
  
 2) A TRANSMITTAL LETTER / NARRATIVE LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS
 REVIEW, SUBSEQUENT REMARKS MAYBE MADE IN THE NEXT
 REVIEW CYCLE.
 PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS
 REVIEW, SUBSEQUENT
 REMARKS MAYBE MADE IN THE NEXT REVIEW CYCLE.
  
  
 MY WORK HOURS ARE USUALLY TUES. & WED. 7:30 AM- 4:30 PM
 PART-TIME/ SEMI-RETIRED.
  
 IF YOU WISH TO SPEAK WITH A PLANS EXAMINER BEFORE I GET
 BACK INTO THE OFFICE CALL
 (561)805-6700 AND ASK FOR THE PLANS EXAMINER ON-CALL.
 THANK YOU.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-03-28 Cont ID  
Sent By rperdomo Date 2023-03-28 Time 14:20 Rev Time 0.00
Received By rperdomo Date 2023-03-28 Time 14:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-03-15 Cont ID  
Sent By rperdomo Date 2023-03-15 Time 08:25 Rev Time 0.00
Received By rperdomo Date 2023-03-15 Time 08:05 Sent To  
Notes
2023-03-15 08:25:23FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW
  
 1. PROVIDE PANEL SCHEDULE SHOWING NEW EQUIPMENT OR
 CIRCUITS BEEN POWERED FROM IN ACCORDANCE WITH NEC
 408.4(A).
  
 END OF COMMENTS
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 RUBEN PEREZ PERDOMO, P.E.
 ELECTRICAL PLANS EXAMINER
 561-805-6738
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2023-03-20 Cont ID  
Sent By pleduc Date 2023-03-20 Time   Rev Time 0.00
Received By pleduc Date 2023-03-20 Time 09:58 Sent To  
Notes
2023-03-20 10:02:31FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2023-03-02 Cont ID  
Sent By pleduc Date 2023-03-02 Time   Rev Time 0.00
Received By pleduc Date 2023-03-02 Time 10:21 Sent To  
Notes
2023-03-02 10:25:57THE PREVIOUS COMMENTS BY FIRE PREVENTION HAVE NOT BEEN
 ADDRESSED BY THIS RESUBMITTAL AND ARE BEING RE-POSTED
 BELOW:
  
 PLEASE PROVED THE REQUESTED INFORMATION.
  
 *******************************************************
 *******************************************************
 ******************************
  
 THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE
 FLOOR UNDERLAYMENT, BUT NO SPEC SHEET NOR A PRODUCT
 NAME FOR THE ACTUAL PROPOSED VINYL FLOORING.
  
 VINYL FLOORING IS MANUFACTURED AROUND THE WORLD BUT NOT
 ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS.
  
 PER NFPA 101, CH 30
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN
 ACCORDANCE WITH
 SECTION 10.2.
  
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE VINYL
 FLOORING NAME AND THE PRODUCT SPEC SHEETS INDICATING
 THE FIRE BEHAVIOR RATING.
  
 IF THE PROPOSED FLOORING IS PORCELAIN/CERAMIC TILE,
 NATURAL STONE TILE, CONCRETE TILES, PRODUCT SPEC SHEETS
 WOULD NOT BE REQUIRED.
  
 PRODUCT SPEC SHEETS ARE REQUIRED FOR LVT, VINYL
 FLOORING, WOOD/VINYL LAMINATES, ETC.
  
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2023-01-24 Cont ID  
Sent By pleduc Date 2023-01-24 Time   Rev Time 0.00
Received By pleduc Date 2023-01-24 Time 11:13 Sent To  
Notes
2023-01-24 11:13:22THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE
 FLOOR UNDERLAYMENT, BUT NO SPEC SHEET NOR A PRODUCT
 NAME FOR THE ACTUAL PROPOSED VINYL FLOORING.
  
 VINYL FLOORING IS MANUFACTURED AROUND THE WORLD BUT NOT
 ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS.
  
 PER NFPA 101, CH 30
  
 30.3.3.3 INTERIOR FLOOR FINISH.
 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN
 ACCORDANCE WITH
 SECTION 10.2.
  
 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH
 10.2.2.2
 ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL
 HAVE A
 MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
  
 FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE VINYL
 FLOORING NAME AND THE PRODUCT SPEC SHEETS INDICATING
 THE FIRE BEHAVIOR RATING.
  
 IF THE PROPOSED FLOORING IS PORCELAIN/CERAMIC TILE,
 NATURAL STONE TILE, CONCRETE TILES, PRODUCT SPEC SHEETS
 WOULD NOT BE REQUIRED.
  
 PRODUCT SPEC SHEETS ARE REQUIRED FOR LVT, VINYL
 FLOORING, WOOD/VINYL LAMINATES, ETC.
  
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-03-29 Cont ID  
Sent By aoliver Date 2023-03-29 Time 08:06 Rev Time 0.00
Received By aoliver Date 2023-03-17 Time 06:35 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-16 Cont ID  
Sent By aoliver Date 2023-03-16 Time 08:48 Rev Time 0.00
Received By aoliver Date 2023-03-01 Time 14:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-01 Cont ID  
Sent By jwitmer Date 2023-02-01 Time 15:17 Rev Time 0.00
Received By jwitmer Date 2023-01-24 Time 05:48 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2023-03-03 Cont ID  
Sent By rwbrown Date 2023-03-03 Time 10:27 Rev Time 0.00
Received By rwbrown Date 2023-03-03 Time 10:27 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2023-02-01 Cont ID  
Sent By jwitmer Date 2023-02-01 Time 15:17 Rev Time  
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved