Plan Review Stops For Permit 23011002
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-04-11 Cont ID  
Sent By jgomez Date 2023-04-11 Time 09:06 Rev Time 0.00
Received By jgomez Date 2023-04-11 Time 08:39 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-03-15 Cont ID  
Sent By jgomez Date 2023-03-15 Time 18:54 Rev Time 0.00
Received By jgomez Date 2023-03-15 Time 18:44 Sent To  
Notes
2023-03-15 18:55:17RESIDENTIAL (R3) BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #23011002
 130 BLOOMFIELD DR
  
 1- GENERATOR CONCRETE PAD ENGINEERING IS DESIGNED BASED
 ON 2017 FBC. ENGINEERING NEEDS TO BE REVISED USING ASCE
 -16 AND 2020 FBC WHICH IS THE CURRENT CODE. ENGINEER TO
 REVISE ENGINEERING DATA AS REQUIRED.
 CHAPTER 553 F.S.
  
 2- GENERATOR CONCRETE PAD ENGINEERING HAS A COPY OF THE
 ENGINEER'S DIGITAL SIGNATURE. NEED ORIGINAL
 SEAL/SIGNATURE WHEN SUBMITTED FOR PUBLIC RECORDS.
 ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 3- THE GENERATOR SHALL BE LOCATED A MINIMUM OF 10 FT.
 FROM ANY OPENING INCLUDING WINDOWS, DOORS, ETC. SEC.
 R303.5.1 FBC RES. PROVIDE NOTE ON SURVEY TO AVOID
 CONFLICTS AT TIME OF INSPECTION.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND
 HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE
 REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2023-03-10 Cont ID  
Sent By jleahy Date 2023-03-10 Time 08:40 Rev Time 0.00
Received By jleahy Date 2023-03-10 Time 08:35 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2023-06-05 Cont ID  
Sent By ccole Date 2023-06-05 Time 10:08 Rev Time 0.00
Received By ccole Date 2023-06-05 Time 09:39 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2023-04-10 Cont ID  
Sent By ccole Date 2023-04-10 Time 17:09 Rev Time 0.00
Received By ccole Date 2023-04-10 Time 17:05 Sent To  
Notes
2023-04-10 17:11:162ND REVIEW FBC-2020 RES. GAS
 PERMIT- 23011002
 4/10/23
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. PLEASE REVIEW THE COMMENTS
 BELOW AND NOTE- THE CONTRACTOR HAS THE OPTION OF
 REQUESTING A SEPARATE PERMIT FOR THE GAS PIPING SYSTEM.
 IF THIS OPTION IS SELECTED PLEASE EMAOIL ME AT
 [email protected] AND I WILL REMOVE THE FAILED REVIEW AND
 PROVIDE A "N" RESULT WHICH MEANS NO GAS REVIEW UNDER
 THIOS PERMIT.
  
 1) PROVIDE A COMPLETE GAS RISER DRAWING THAT INCLUDES
 THE NEW GAS PIPING TO THE GENERATOR AND EXISTING GAS
 PIPING AND APPLIANCES AT THE RESIDENCE- SECTION G2412.3
 & G2412.4 FBC RES. WPB BUILDING DEPT. RECORDS INDICATE
 PREVIOUS GAS PIPING PERMIT- 13100338. REFER TO FBC RES.
 CHAPTER 24 FUEL GAS- THE NEW RISER SHALL INDICATE:
 A) DELIVERY PRESSURE AT THE METER.
 B) TOTAL BTU LOAD AND INDIVIDUAL APPLIANCE BTU LOADS.
 C) TYPES AND SIZES OF PIPING.
 D) TOTAL DEVELOPED LENGTH OF THE SYSTEM FROM THE METER
 TO THE MOST REMOTE APPLIANCE OUTLET.
 E) BRANCH AND CUT PIPE LENGTH MEASUREMENTS.
 F) LOCATIONS OF REGULATORS, SHUTOFF VALVES.
 G) OUTLET PRESSURES AT REGULATORS.
 H) LOCATIONS AND TYPES OF PIPE SLEEVES.
 I) PIPE SIZING TABLES.
 2) SUBMIT A GAS SUB-PERMIT APPLICATION- SECTION 105.1
 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2023-03-16 Cont ID  
Sent By ccole Date 2023-03-16 Time 15:06 Rev Time 0.00
Received By ccole Date 2023-03-16 Time 12:52 Sent To  
Notes
2023-03-16 15:07:131ST REVIEW FBC-2020 RES. GAS
 PERMIT- 23011002
 3/16/23
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. PLEASE REVIEW THE COMMENTS
 BELOW AND NOTE- THE CONTRACTOR HAS THE OPTION OF
 REQUESTING A SEPARATE PERMIT FOR THE GAS PIPING SYSTEM.
  
 1) PROVIDE A COMPLETE GAS RISER DRAWING THAT INCLUDES
 THE NEW GAS PIPING TO THE GENERATOR AND EXISTING GAS
 PIPING AND APPLIANCES AT THE RESIDENCE- SECTION G2412.3
 & G2412.4 FBC RES. WPB BUILDING DEPT. RECORDS INDICATE
 PREVIOUS GAS PIPING PERMIT- 13100338. REFER TO FBC RES.
 CHAPTER 24 FUEL GAS- THE NEW RISER SHALL INDICATE:
 A) DELIVERY PRESSURE AT THE METER.
 B) TOTAL BTU LOAD AND INDIVIDUAL APPLIANCE BTU LOADS.
 C) TYPES AND SIZES OF PIPING.
 D) TOTAL DEVELOPED LENGTH OF THE SYSTEM FROM THE METER
 TO THE MOST REMOTE APPLIANCE OUTLET.
 E) BRANCH AND CUT PIPE LENGTH MEASUREMENTS.
 F) LOCATIONS OF REGULATORS, SHUTOFF VALVES.
 G) OUTLET PRESSURES AT REGULATORS.
 H) LOCATIONS AND TYPES OF PIPE SLEEVES.
 I) PIPE SIZING TABLES.
 2) SUBMIT A GAS SUB-PERMIT APPLICATION- SECTION 105.1
 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2023-06-05 Time   Rev Time 0.00
Received By amcgrego Date 2023-06-02 Time 10:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-17 Cont ID  
Sent By vbroglia Date 2023-04-17 Time 14:15 Rev Time 0.00
Received By vbroglia Date 2023-04-07 Time 09:47 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2023-03-16 Time   Rev Time 0.00
Received By amcgrego Date 2023-02-24 Time 11:13 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status N Date 2023-06-05 Cont ID  
Sent By ccole Date 2023-06-05 Time 09:59 Rev Time 0.00
Received By ccole Date 2023-06-05 Time 09:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2023-04-10 Cont ID  
Sent By ccole Date 2023-04-10 Time 17:05 Rev Time 0.00
Received By ccole Date 2023-04-10 Time 17:05 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2023-03-16 Cont ID  
Sent By ccole Date 2023-03-16 Time 12:52 Rev Time 0.00
Received By ccole Date 2023-03-16 Time 12:52 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-04-11 Cont ID  
Sent By jgomez Date 2023-04-11 Time 09:05 Rev Time 0.00
Received By jgomez Date 2023-04-11 Time 09:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-03-15 Cont ID  
Sent By jgomez Date 2023-03-15 Time 18:56 Rev Time 0.00
Received By jgomez Date 2023-03-15 Time 18:55 Sent To  
Notes
2023-03-15 18:59:02 
  
 SIGNATURE REVIEW:
  
 1-- GENERATOR CONCRETE PAD ENGINEERING HAS A COPY OF
 THE ENGINEER'S SEAL/SIGNATURE. NEED ORIGINAL
 SEAL/SIGNATURE WHEN SUBMITTED FOR PUBLIC RECORDS.
 ELECTRONIC SUBMITTALS NEED VERIFIABLE DIGITAL
 SIGNATURE.
  
 ENGINEERS
 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND
 SEALING ELECTRONICALLY TRANSMITTED PLANS,
 SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
2023-03-10 08:40:43ELECTRICAL PAGE NOT SIGNED. JLEAHY

Review Stop Z ZONING
Rev No 2 Status P Date 2023-04-17 Cont ID  
Sent By vbroglia Date 2023-04-17 Time 14:15 Rev Time 0.00
Received By vbroglia Date 2023-04-17 Time 14:15 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2023-03-07 Cont ID  
Sent By VBroglia Date 2023-03-07 Time 08:53 Rev Time 0.00
Received By vbroglia Date 2023-03-07 Time 08:53 Sent To  
Notes
2023-03-07 08:57:003/7/23 FAILED FOR THE FOLLOWING REASONS:
  
  
 1. PURSUANT TO SECTION 94-305(B)(4) OF THE ZLDR:
 MECHANICAL EQUIPMENT MAY NOT PROJECT MORE THAN 4 FEET
 INTO A REQUIRED SETBACK.
  
 REAR SETBACK FOR THE PRIMARY STRUCTURE IS REQUIRED TO
 BE 15 FEET OR 10% OF LOT DEPTH, WHICHEVER IS LESS
  
 REAR SETBACK FOR BLOOMFILED IS 13 FEET, THEREFORE
 GENERATOR MUST BE 9 FEET FROM THE REAR PROPERTY LINE
  
 **** REVIEWD BY ****
 VALENTINA BROGLIA
 PLANNER
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved