Plan Review Details - Permit 23010896
Plan Review Stops For Permit 23010896
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-07-20 Cont ID  
Sent By rmcphers Date 2023-07-20 Time 13:21 Rev Time 0.00
Received By rmcphers Date 2023-07-20 Time 13:21 Sent To  
Notes
2023-07-20 13:22:57REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWING S2 SHOWS AS A BLANK PAGE IN PROJECTDOX.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-02-17 Cont ID  
Sent By rmcphers Date 2023-02-17 Time 12:46 Rev Time 0.00
Received By rmcphers Date 2023-02-17 Time 11:29 Sent To  
Notes
2023-02-17 12:45:55REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE WINDOW AND DOOR LOCATION PLAN DOES NOT MATCH ALL
 OF THE OTHER FLOOR PLANS (BEDROOM #3 EXTERIOR DOORS)
 ALL FLOOR PLANS NEED TO MATCH. FBC 107
  
 2) SIGNED AND SEALED DRAWINGS (A-100, A-101, A-102,
 A-103) DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER
 - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-07-28 Cont ID  
Sent By mpeterso Date 2023-07-28 Time 11:01 Rev Time 0.00
Received By mpeterso Date 2023-07-28 Time 10:54 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-01-30 Cont ID  
Sent By mpeterso Date 2023-01-30 Time 15:42 Rev Time 0.00
Received By mpeterso Date 2023-01-30 Time 15:42 Sent To  
Notes
2023-01-30 16:11:48ELECTRIC REVIEW FAILED
 1) PLEASE PROVIDE ACCURATE ELCTRICAL FLOOR PLANS.
 PLEASE REMOVE PORTIONS NOT INCLUDED IN THE WORK SCOPE,
 FBC 107.2
 2) PLEASE CORRECT ELECTRIC LOAD CACULATION. INCLUDE ALL
 LOADS I.E. CAR CHARGER
 3) SEE SIGNATURE REVIEW
  
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM.
  
 CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By amcgrego Date 2023-07-28 Time 14:37 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-28 Cont ID  
Sent By mpeterso Date 2023-07-28 Time 11:01 Rev Time 0.00
Received By mpeterso Date 2023-07-19 Time 15:45 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-17 Cont ID  
Sent By rmcphers Date 2023-02-17 Time 12:46 Rev Time 0.00
Received By rmcphers Date 2023-01-23 Time 15:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2023-07-24 Cont ID  
Sent By cmontell Date 2023-07-24 Time 12:47 Rev Time 0.00
Received By cmontell Date 2023-07-24 Time 12:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2023-07-20 Cont ID  
Sent By rwbrown Date 2023-07-20 Time 09:50 Rev Time 0.00
Received By rwbrown Date 2023-07-20 Time 09:50 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2023-01-24 Cont ID  
Sent By rwbrown Date 2023-01-24 Time 15:03 Rev Time 0.00
Received By rwbrown Date 2023-01-24 Time 15:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-07-20 Cont ID  
Sent By rmcphers Date 2023-07-20 Time 13:23 Rev Time 0.00
Received By rmcphers Date 2023-07-20 Time 13:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-01-30 Cont ID  
Sent By mpeterso Date 2023-01-30 Time 16:11 Rev Time 0.00
Received By mpeterso Date 2023-01-30 Time 16:11 Sent To  
Notes
2023-01-30 16:17:35SIGNATURE REVIEW FAILED
 1) SHEETS G001,A100, A102, A103 E1.1, E3.1, P1.1, P2.1
 DETAIL THE DIGITAL SIGNATURES OF THE EOR/AOR AS INVALID
 USING BLUEBEAM SOFTWARE. PLEASE CORRECT AS OUTLINED
 BELOW.
  
 FS471/FS481 DOCUMENTS PREPARED BY ARCHITECT/ENGINEER OF
 RECORD AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 DIGITALLY SEALED AND SIGNED.
  
 PLEASE SUBMIT VALID, DIGITALLY SEALED AND SIGNED PLANS
 FOLLOWING PROJECTDOX INSTRUCTIONS
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  