Plan Review Details - Permit 23010186
Plan Review Stops For Permit 23010186
Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-04-25 Cont ID  
Sent By lquinone Date 2023-04-25 Time 14:33 Rev Time 0.00
Received By lquinone Date 2023-04-25 Time 14:33 Sent To  
Notes
2023-04-25 14:33:50NO WORKS TO BE PERFORMED IN THE CITY'S ROW (APRON).
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-04-06 Cont ID  
Sent By lquinone Date 2023-04-06 Time 11:09 Rev Time 0.00
Received By lquinone Date 2023-04-06 Time 11:09 Sent To  
Notes
2023-04-06 11:09:57NO WORKS TO BE PERFORMED IN THE RIGHT OF WAY (APRON).

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-01-31 Cont ID  
Sent By lquinone Date 2023-01-31 Time 14:34 Rev Time 0.00
Received By lquinone Date 2023-01-31 Time 14:34 Sent To  
Notes
2023-01-31 14:35:34NO WORKS TO BE PERFORMED ON ROW (DRIVEWAY APRON).

Review Stop HIST HISTORICAL
Rev No 2 Status N Date 2023-04-06 Cont ID  
Sent By avolcy Date 2023-04-06 Time 12:08 Rev Time 0.00
Received By avolcy Date 2023-04-06 Time 12:08 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status F Date 2023-02-02 Cont ID  
Sent By amhamilt Date 2023-02-02 Time 15:43 Rev Time 0.00
Received By amhamilt Date 2023-02-02 Time 15:43 Sent To  
Notes
2023-02-02 15:44:49THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S)
  
 WHAT IS THE PROPOSED DRIVEWAY MATERIAL?
  
 ANNE HAMILTON
 HISTORIC PRESERVATION PLANNER
 [email protected]
 561.822.1428
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-04-28 Cont ID  
Sent By avolcy Date 2023-04-28 Time 09:40 Rev Time 0.00
Received By avolcy Date 2023-04-19 Time 12:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-06 Cont ID  
Sent By avolcy Date 2023-04-06 Time 12:09 Rev Time 0.00
Received By avolcy Date 2023-03-29 Time 10:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-02 Cont ID  
Sent By avolcy Date 2023-02-02 Time 16:03 Rev Time 0.00
Received By avolcy Date 2023-01-27 Time 05:33 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-04-28 Cont ID  
Sent By avolcy Date 2023-04-28 Time 09:40 Rev Time 0.00
Received By avolcy Date 2023-04-28 Time 09:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2023-04-06 Cont ID  
Sent By avolcy Date 2023-04-06 Time 11:22 Rev Time 0.00
Received By avolcy Date 2023-04-06 Time 11:22 Sent To  
Notes
2023-04-06 11:25:2004.06.2023 - FAILED
  
 DRIVEWAY MUST BE SETBACK A MINIMUM OF 3FT FROM PROPERTY
 LINE.
  
  
 DRIVEWAY WIDTH CANNOT EXCEED 20FT, MEASURED AT THE
 PROPERTY LINE.
  
 ILLUSTRATE THIS INFORMATION ON THE SURVEY TO ENSURE
 THAT THESE REQUIREMENTS ARE MET.
  
 **** REVIEWD BY ****
 GAISHA (ANNE CLERISSE) VOLCY
 PLANNER
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2023-02-02 Cont ID  
Sent By AVolcy Date 2023-02-02 Time 15:23 Rev Time 0.00
Received By avolcy Date 2023-02-02 Time 15:23 Sent To  
Notes
2023-02-02 16:01:5102.02.23 - FAILED
 PROVIDE THE INFORMATION FOR DRIVEWAY PROPOSAL ON SURVEY
 PROVIDE DRIVEWAY AND PATIO SETBACKS ON SURVEY
  
 GAISHA (ANNE CLERISSE) VOLCY
 561.822.1552
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved