Plan Review Details - Permit 23010183
Plan Review Stops For Permit 23010183
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-03-13 Cont ID  
Sent By rmcphers Date 2023-03-13 Time 09:10 Rev Time 0.00
Received By rmcphers Date 2023-03-13 Time 09:10 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-02-14 Cont ID  
Sent By rmcphers Date 2023-02-14 Time 11:24 Rev Time 0.00
Received By rmcphers Date 2023-02-14 Time 11:24 Sent To  
Notes
2023-02-14 11:27:20POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS RP-1, RP-2, RP-3, RP-5,
 RP-6 DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER -
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-02-01 Cont ID  
Sent By rmcphers Date 2023-02-01 Time 15:04 Rev Time 0.00
Received By rmcphers Date 2023-02-01 Time 15:04 Sent To  
Notes
2023-02-01 15:10:37POOL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE THE POOL ENGINEERING POOL DESIGN
 DRAWINGS FBC R4501.6.1
  
 2) PLEASE SHOW THE DISTANCE FROM THE EAST SIDE OF THE
 POOL AND DECK TO THE PROPERTY LINE.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2023-03-16 Cont ID  
Sent By fgiaquin Date 2023-03-16 Time 21:19 Rev Time 0.00
Received By fgiaquin Date 2023-03-16 Time 19:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-02-16 Cont ID  
Sent By fgiaquin Date 2023-02-16 Time 20:26 Rev Time 0.00
Received By fgiaquin Date 2023-02-15 Time 23:12 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-01-19 Cont ID  
Sent By fgiaquin Date 2023-01-19 Time 19:33 Rev Time 0.00
Received By fgiaquin Date 2023-01-19 Time 19:31 Sent To  
Notes
2023-01-19 19:33:14ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. NO ELECTRICAL PLAN SUBMITTED FOR POOL
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2020 7TH ED.
 FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020
 7TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION
 NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO III
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WEST PALM BEACH
 [email protected]
 CELL: 561-805-6744
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-03-21 Cont ID  
Sent By asangele Date 2023-03-21 Time 13:48 Rev Time 0.00
Received By asangele Date 2023-03-21 Time 13:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-27 Cont ID  
Sent By asangele Date 2023-02-27 Time 16:08 Rev Time 0.00
Received By asangele Date 2023-02-27 Time 16:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-01 Cont ID  
Sent By rmcphers Date 2023-02-01 Time 15:12 Rev Time 0.00
Received By rmcphers Date 2023-01-09 Time 08:02 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2023-03-13 Cont ID  
Sent By ccole Date 2023-03-13 Time 10:03 Rev Time 0.00
Received By ccole Date 2023-03-13 Time 09:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2023-02-15 Cont ID  
Sent By ccole Date 2023-02-15 Time 14:41 Rev Time 0.00
Received By ccole Date 2023-02-15 Time 14:01 Sent To  
Notes
2023-02-15 14:42:311ST REVIEW FBC-2020 RES. PLUMBING
 PERMIT- 23010183
 2/15/2023
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET RP-3 (POOL PIPING PLAN) DOES NOT HAVE A
 VERIFIABLE DIGITAL SIGNATURE AND SEAL BY THE ENGINEER
 OF RECORD- SEC. 471.025 AND SEC. 61G15-23.005 FLORIDA
 ADMINISTRATIVE CODE. THE POOL PLUMBING FOR THE PERMIT
 WILL BE APPROVED WHEN THE DIGITALLY SIGNED AND SEALED
 PLAN IS SUBMITTED.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2023-01-17 Cont ID  
Sent By ccole Date 2023-01-17 Time 15:31 Rev Time 0.00
Received By ccole Date 2023-01-17 Time 15:01 Sent To  
Notes
2023-01-17 15:31:581ST REVIEW FBC-2020 RES. PLUMBING
 PERMIT- 23010183
 1/17/23
  
 CODES IN EFFECT:
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) POOL PLANS HAVE NOT BEEN SUBMITTED FOR REVIEW AS
 REQUIRED BY SECS. 107.2.1 & 107.3.5.4 WPB. PLEASE
 SUBMIT COMPLETE PLANS INCLUDING A POOL PLUMBING SITE
 PLAN THAT SHOWS THE PIPING RUNS FROM THE POOL TO THE
 RECIRCULATION EQUIPMENT.
 A) PROVIDE A PIPING DIAGRAM OR SCHEMATIC DRAWING
 SHOWING THE PRESSURE AND SUCTION PIPE SIZES AND FPM
 FLOWS- SEC. R4501.6.3 FBC RES.
 B) PROVIDE POOL AND SPA SPECIFICATIONS INCLUDING THE
 POOL SIZE, DEPTH, AREA, VOLUME IN GALLONS, DESIGN FLOW
 RATE, SYSTEM FLOW RATE, AND TURNOVER TIME- SEC.
 R4501.6.1 FBC RES.
 C) PROVIDE A RECIRCULATION EQUIPMENT SCHEDULE THAT
 INCLUDES THE MAKES AND MODELS OF THE PUMP, FILTER,
 CHLORINATOR, HEATER (IF APPLICABLE), AND UNBLOCKABLE
 DRAIN ASSEMBLY INCLUDING FLOW RATE- SECS. R4501.6.2,
 R4501.6.6, R4501.7.2, R4501.20 & R4501.21.3 FBC RES.
 D) PROVIDE TDH CALCULATIONS, AND THE PUMP CURVE ON THE
 PLAN MARKED UP TO SHOW THE TDH AND FLOW RATE OF THE
 SYSTEM- SECS. 4.4.9, 4.4.9.1 ANSI/APSP/ICC-7 &
 R4501.7.2 & R4501.7.3 FBC RES.
  
 2) PROVIDE ON THE PLAN A LIST OF CONFORMANCE STANDARDS
 IN COMPLIANCE WITH SEC. R4501.6.1 FBC RES.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-03-13 Cont ID  
Sent By rmcphers Date 2023-03-13 Time 09:10 Rev Time 0.00
Received By rmcphers Date 2023-03-13 Time 09:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2023-02-14 Cont ID  
Sent By rmcphers Date 2023-02-14 Time 11:27 Rev Time 0.00
Received By rmcphers Date 2023-02-14 Time 11:27 Sent To  
Notes
2023-02-14 11:29:00SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS RP-1, RP-2, RP-3, RP-5,
 RP-6 DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER -
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-02-01 Cont ID  
Sent By rmcphers Date 2023-02-01 Time 15:11 Rev Time 0.00
Received By rmcphers Date 2023-02-01 Time 15:11 Sent To  
Notes
2023-02-01 15:12:49SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop Z ZONING
Rev No 3 Status P Date 2023-03-21 Cont ID  
Sent By asangele Date 2023-03-21 Time 13:48 Rev Time 0.00
Received By asangele Date 2023-03-21 Time 13:48 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-02-27 Cont ID  
Sent By asangele Date 2023-02-27 Time 16:04 Rev Time 0.00
Received By asangele Date 2023-02-27 Time 16:08 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2023-01-20 Cont ID  
Sent By ASangele Date 2023-01-20 Time 09:23 Rev Time 0.00
Received By asangele Date 2023-01-20 Time 09:23 Sent To  
Notes
2023-01-20 09:32:18FAILED
 1/20/2023
  
 PLEASE LABEL THE REAR AND SIDE SETBACK OF THE POOL.
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved