| Plan Review Stops For Permit 22121422 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2023-01-05 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-01-05 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-01-05 |
Time |
11:42 |
Sent To |
|
|
| Notes |
| 2023-01-05 11:42:30 | ADDRESS APPROPRIATE FOR PROJECT. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-02-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-02-25 |
Time |
11:13 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-02-24 |
Time |
14:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-01 |
Time |
15:53 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-01 |
Time |
15:53 |
Sent To |
|
|
| Notes |
| 2023-02-01 15:55:03 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC R 302, PROVIDE A SITE PLAN THAT CLEARLY SHOWS | | | LOCATION OF PROPOSED STRUCTURE. THIS SHOULD INCLUDE | | | DISTANCE TO THE LOT LINES. | | | | | | 2. PROVIDE PROPOSED ELEVATION OF NEW STRUCTURE, | | | DRAINAGE PLAN TO SHOW HOW WATER FLOW WILL NOT AFFECT | | | ADJACENT PROPERTIES. FBC 107. | | | | | | 3. SEE THE MODULAR ENGINEERING, PAGE 1, FOR SITE | | | INSTALLED ITEMS. | | | | | | #3, TERMITE PROTECTION AND VAPOR BARRIER, I WAS UNABLE | | | TO FIND WHERE THIS IS SPECIFIED ON THE FOUNDATION PLAN. | | | EITHER REVISE THE PLAN TO INCLUDE OR ADVISE WHERE THIS | | | INFORMATION CAN BE LOCATED. | | | #10. A ROOF PERMIT WILL BE REQUIRED (ADVISORY ONLY). | | | #12. IMPACT PROTECTION FOR GLAZING IS REQUIRED. | | | #22, HIGH EFFICIENCY LAMPS ARE TO BE INSTALLED ON SITE. | | | A LETTER STATING HOW THIS WILL BE DONE WILL BE | | | ACCEPTABLE. ALTHOUGH THE LIST REFERS TO FRC 404, IT | | | APPEARS THAT THE ENGINEER IS REFERRING TO FBC ENERGY | | | CONSERVATION SECTION R404. | | | | | | 4. FBC 107, THE DESIGN FOR THE FOUNDATION VENTILATION | | | IS NOT CLEAR. PROVIDE A DETAIL. | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2023-01-06 |
|
|
Cont ID |
|
| Sent By |
rperdomo |
Date |
2023-01-06 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
rperdomo |
Date |
2023-01-06 |
Time |
08:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-03-29 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2023-03-29 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2023-03-29 |
Time |
13:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-02-27 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2023-02-27 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2023-02-27 |
Time |
08:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-01 |
Time |
16:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-18 |
Time |
10:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-01-09 |
Time |
09:31 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-04 |
Time |
08:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2023-04-21 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-04-21 |
Time |
08:34 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-03-29 |
Time |
14:24 |
Sent To |
|
|
| Notes |
| 2023-04-17 11:53:25 | RECEIPT MU-2023-016171 - $11,623.07 PAID | | 2023-03-29 14:24:58 | 3/29/23 EMAILED IMPACT OFFICE TO REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-01 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-01 |
Time |
15:55 |
Sent To |
|
|
| Notes |
| 2023-02-01 15:55:41 | IMPACT FEES - DIGITAL SUBMITTALS | | | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION WILL OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE EMAIL THE RECEIPT | | | TO [email protected]. | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2023-02-17 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2023-02-17 |
Time |
10:09 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2023-02-17 |
Time |
10:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2023-01-19 |
Time |
14:29 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2023-01-19 |
Time |
14:29 |
Sent To |
|
|
| Notes |
| 2023-01-19 14:29:17 | 1ST REVIEW FMC | | | PERMIT: 22121422 | | | | | | CODES IN EFFECT: 2020 | | | | | | FBC- FLORIDA BUILDING CODE | | | FMC- FLORIDA MECHANICAL CODE | | | FEC- FLORIDA ENERGY CONSERVATION | | | FGC- FLORIDA FUEL GAS | | | FEX- FLORIDA EXISTING BUILDING CODE | | | FRC- FLORIDA RESIDENTIAL BUILDING CODE | | | F.S.- FLORIDA STATUTES | | | FAC- FLORIDA ACCESSIBILITY CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET 10 OF 15: A FLORIDA LICENSED MECHANICAL | | | CONTRACTOR SHALL APPLY FOR A MECHANICAL SUB-PERMIT AND | | | PROVIDE THE MANUAL J AND MANUAL S CALCULATIONS FOR THIS | | | MODULAR HOME. | | | | | | 2) PROVIDE A DRAWING INDICATING WHERE THE CONDENSING | | | UNIT WILL BE LOCATED AND HOW IT WILL BE SECURED. FBC | | | 107.3.5 | | | | | | 3) ON THE RESCHECK COMPLIANCE CERTIFICATE SUBMITTED THE | | | SEER RATING IS 14, THIS PROJECT WAS SUBMITTED AFTER | | | JAN. 01, 2023. PLEASE SHOW THAT THE SEER RATING MEETS | | | THE NEW FEDERAL GUIDELINES ADOPTED 01/01/2023 | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2023-01-06 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2023-01-06 |
Time |
09:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2023-02-25 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-02-25 |
Time |
11:11 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-02-24 |
Time |
14:12 |
Sent To |
|
|
| Notes |
| 2023-02-25 11:12:28 | PROVISO ON BOUNDARY LINE SURVEY: A SEPERATE ROOFING | | | PERMIT IS REQUIRED FOR THE MATING SEAM. CT |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-01 |
Time |
16:14 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-01 |
Time |
16:14 |
Sent To |
|
|
| Notes |
| 2023-02-01 16:15:23 | SUBMIT A SUB PERMIT APPLICATION. ROOFING AT THE MATING | | | SEAM IS REQUIRED. PROVIDE A PRODUCT APPROVAL FOR THE | | | SHINGLE RIDGE PROPOSED. | | | | | | | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2023-02-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-01 |
Time |
16:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-01 |
Time |
16:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-03-29 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2023-03-29 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2023-03-29 |
Time |
13:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-02-27 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2023-02-27 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2023-02-27 |
Time |
08:51 |
Sent To |
|
|
| Notes |
| 2023-02-27 08:53:19 | FAILED | | | 2/27/2023 | | | | | | PLEASE LABEL THE HEIGHT OF THE HOME | | | ARTICLE III. SECTION 94-72 | | | MAXIMUM BUILDING HEIGHT: 30 FEET. | | | | | | | | | A SEPARATE LANDSCAPE PERMIT IS REQUIRED TO BE IN THE | | | SYSTEM | | | | | | | | | ALEXIS SANGELEER | | | PLANNER | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2023-01-10 |
|
|
Cont ID |
|
| Sent By |
ASangele |
Date |
2023-01-10 |
Time |
17:27 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2023-01-10 |
Time |
17:27 |
Sent To |
|
|
| Notes |
| 2023-01-10 17:29:29 | FAILED | | | 1/10/2023 | | | | | | PLEASE PROVIDE A SURVEY AND SITE PLANS WITH LABELED | | | SETBACKS | | | | | | | | | A SEPARATE LANDSCAPE PERMIT IS REQUIRED FOR ALL NEW | | | CONSTRUCTION | | | | | | | | | | | | ALEXIS SANGELEER | | | PLANNER | | | [email protected] |
|
|