| 2023-01-18 08:27:25 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOFING TILE SYSTEM TO |
| | BE USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING |
| | 2. FBC B 107.2.1 SUBMITTED PRODUCT APPROVAL FL12328-R9 |
| | HAS BEEN REVISED TO FL12328-R10. PLEASE PROVIDE A |
| | COMPLETE SET; IT COVERS MULTIPLE PRODUCT TYPES; ROOF |
| | COVER OPTIONS; ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE |
| | COMBINATIONS & ALLOWABLE SUBSTRATES. SELECT ALL |
| | APPLICABLE OPTIONS FROM EACH CATEGORY. ALL APPLICABLE |
| | DETAILS AND ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON |
| | THE PRODUCT APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS |
| | NOT SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING. |
| | 3. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| | CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| | MEAN ROOF HEIGHT(S). FLAT/LOW SLOPE ROOFS MUST SHOW |
| | POSITIVE DRAINAGE. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |