| 2023-01-19 11:46:40 | FAILED |
| | |
| | PROVIDE WRITTEN RESPONSES TO COMMENTS. |
| | |
| | THE VIBRO PERMIT STATES THAT THIS PERMIT IS FOR |
| | BUILDING A ONLY; HOWEVER, THE PERMIT ENCOMPASSES THE |
| | ENTIRE NORTHWOOD COMMONS DEVELOPMENT BOUNDARY, WHICH |
| | INCLUDES BOTH BUILDINGS B AND C, AS A PHASED |
| | DEVELOPMENT. THE CURRENT REVIEW INCLUDES THE BUILDING A |
| | FOUNDATION/GROUND LEVEL FRAMING PLAN, THE ARCHITECTURAL |
| | SITE PLAN COVERING THE ENTIRE PROPERTY, AND THE PHASING |
| | PLAN COVERING THE 3 BUILDINGS. |
| | |
| | 1) THE PHASING PLAN NEEDS TO BE DRAWN FOLLOWING THE |
| | PROPERTY LINES (IE. EXCLUDING THE RIGHTS-OF-WAYS) TO |
| | CLEARLY SHOW WHERE THE WORK WILL BE PERFORMED ON |
| | PRIVATE PROPERTY (THE NOTE ON THE PLAN IS NOT |
| | SUFFICIENT). UPON APPROVAL OF A RIGHT-OF-WAY PERMIT |
| | THAT PERMITS WORK WITHIN A SPECIFIC PORTION OF A CITY |
| | RIGHT-OF-WAY, THE SPECIFIC PHASE LINE CAN BE EXTENDED |
| | TO ENCOMPASS THE SPECIFIC RIGHT-OF-WAY AREA THROUGH THE |
| | APPROVAL OF A PERMIT REVISION. CURRENTLY, CITY |
| | ENGINEERING HAS NOT ISSUED A RIGHT-OF-WAY PERMIT TO USE |
| | THE RIGHTS-OF-WAY WITHIN THE PROJECT BOUNDARIES VIBRO |
| | RELATED WORK. THE APPROVED RIGHT-OF-WAY PERMIT, |
| | INCLUDING THE SITE PLANS, MUST BE UPLOADED PRIOR TO A |
| | PHASE LINE BEING SHOWED OVER A RIGHT-OF-WAY. |
| | |
| | 2) BASED ON THE REQUIREMENT FOR A PERMIT FOR EACH |
| | INDIVIDUAL PARCEL, THE PHASE LINE BETWEEN PHASE 1 AND 2 |
| | NEEDS TO FOLLOW PARCEL LINES SO THAT THE ENTIRE PARCEL |
| | IS COVERED BY ONE PHASE. |
| | |
| | 3) THIS PERMIT WILL ONLY PERMIT THE VIBRO WORK FOR |
| | PHASE 1. PHASES 2, 3 AND 4 WILL REQUIRE A REVISION TO |
| | THE PERMIT BEFORE COMMENCING. |
| | |
| | 4) NO WORK MAY OCCUR WITHIN THE RIGHTS-OF-WAY IN PHASE |
| | 1 UNTIL THE CITY UTILITIES ARE NO LONGER ACTIVE. THE |
| | PERMIT REVISION TO MOVE THE PHASE 1 LINE TO INCLUDE THE |
| | RIGHTS-OF-WAY INCLUDED ON AN APPROVED RIGHT-OF-WAY |
| | PERMIT MUST ALSO BE ACCOMPANIED BY VERIFICATION FROM |
| | THE CITY'S ENGINEERING DIVISION THAT THE UTILITIES |
| | WITHIN THE SPECIFIC RIGHT-OF-WAY ARE NO LONGER ACTIVE. |
| | THE APPROVAL MUST BE PROVIDED WITH THE PERMIT REVISION |
| | SUBMITTAL TO CHANGE THE PHASE LINE. |
| | |
| | 5) THE SOUTH PORTION OF PHASE 1 IS SHOWN IN THE |
| | EXISTING PINEWOOD AVENUE RIGHT-OF-WAY. SINCE WORK MAY |
| | NOT OCCUR IN THE PINEWOOD AVENUE RIGHT-OF-WAY UNTIL THE |
| | EXISTING CITY UTILITIES ARE NO LONGER ACTIVE, THIS AREA |
| | MUST BE EXCLUDED FROM PHASE 1. PINEWOOD AVENUE HAS |
| | MAJOR CITY UTILITIES. |
| | |
| | 6) THE ARCHITECTURAL SITE PLAN PROVIDED WITH THIS |
| | PERMIT DOES NOT MATCH THE SITE PLAN FOR BUILDING A |
| | CURRENTLY UNDER REVIEW AS PART OF THE FORMAL SITE PLAN. |
| | |
| | A. THE DIMENSION FOR THE 5,510 SF RETAIL SPACE ALONG |
| | THE WEST SIDE OF NEW PINEWOOD IS INCORRECT. |
| | B. THE DIMENSION FOR LOBBY #3 ALONG BROADWAY IS |
| | INCORRECT. |
| | |
| | 7) THE FOUNDATION/GROUND LEVEL FRAMING PLAN SHEETS DO |
| | NOT MATCH THE ARCHITECTURAL SITE PLAN PROVIDED WITH |
| | THIS PERMIT OR THE ARCHITECTURAL SITE PLAN CURRENTLY |
| | UNDER REVIEW AS PART OF THE FORMAL SITE PLAN. THE |
| | ACCURATE PLANS MUST BE INCLUDED WITH THIS PERMIT. |
| | |
| | 8) ONCE CORRECTED, THE RESUBMITTED FOUNDATION/GROUND |
| | LEVEL FRAMING PLAN NEEDS TO INCLUDE THE SETBACK |
| | DIMENSIONS TO THE PROPERTY LINES. |
| | |
| | SINCE THERE ARE CURRENTLY MULTIPLE PROPERTIES WITHIN |
| | THE LIMITS OF WORK, THERE HAS BEEN A PERMIT SUBMITTED |
| | FOR EACH PARCEL. THE CURRENT PHASE LAYOUT FOR THE |
| | VARIOUS BUILDINGS INCLUDES THE FOLLOWING PERMITS. |
| | |
| | PHASE 1 BUILDING A (WILL BE APPROVED WITH THIS PERMIT |
| | WHEN COMMENTS ARE ADDRESSED) |
| | |
| | 2505 BROADWAY - 22120838 |
| | 604 25TH STREET - 22120840 |
| | 2501 BROADWAY - 22120836 |
| | 2401 BROADWAY - 22120834 |
| | |
| | PHASE 2 BUILDING A |
| | |
| | 2501 PINEWOOD - 22100245 (FUTURE REVISION) |
| | |
| | SPLIT BETWEEN PHASE 1 AND 2. THE ENTIRE PROPERTY MUST |
| | BE ASSIGNED TO JUST ONE PHASE. (ANY OF THESE SHOWN IN |
| | PHASE 1 WILL BE APPROVED WITH THIS PERMIT WHEN COMMENTS |
| | ARE ADDRESSED) |
| | |
| | 610 25TH STREET - 22120837 |
| | 609 24TH STREET - 22120841 |
| | 2425 BROADWAY - 22120835 |
| | |
| | PHASE 3 BUILDING B (FUTURE REVISION) WHEN SUBMITTED - |
| | PROVIDE THE SETBACK DIMENSION FOR BUILDING B FROM 23RD |
| | STREET SO THAT STAFF CAN VERIFY THAT IT MATCHES THE |
| | SITE PLAN CURRENTLY UNDER REVIEW AS PART OF THE FORMAL |
| | SITE PLAN |
| | |
| | 550 NORTHWOOD ROAD - 22120842 |
| | |
| | NOTE: THE HISTORIC BUILDING WALL THAT IS TO REMAIN MUST |
| | BE SHOWN ON THIS REVISION, INCLUDING HOW IT WILL BE |
| | PROTECTED DURING THE VIBRO WORK FOR BUILDING B. |
| | |
| | PHASE 4 BUILDING C (FUTURE REVISION) WHEN SUBMITTED - |
| | PROVIDE ALL THE BUILDING DIMENSIONS FOR BUILDING C SO |
| | THAT STAFF CAN VERIFY THAT IT MATCHES THE SITE PLAN |
| | CURRENTLY UNDER REVIEW AS PART OF THE FORMAL SITE PLAN |
| | |
| | 2446 BROADWAY - 22120833 |
| | 2400 BROADWAY - 22120832 |
| | |
| | **** 701 23RD STREET - 22120839 HAD A SEPARATE VIBRO |
| | PERMIT SUBMITTED, BUT DOES NOT HAVE ANY FUTURE BUILDING |
| | CONSTRUCTION. THIS PERMIT SHOULD MOST LIKELY BE VOIDED |
| | AS IT DOES NOT SEEM TO APPLY. |
| | |
| | CONTACT ERIC SCHNEIDER @ 561-822-1446 |
| | [email protected] |
| | |
| 2023-01-05 17:51:43 | |
| | |