Plan Review Details - Permit 22111247
Plan Review Stops For Permit 22111247
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-12-15 Cont ID  
Sent By rwbrown Date 2022-12-15 Time 07:00 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2022-12-05 Cont ID  
Sent By rwbrown Date 2022-12-05 Time 06:01 Rev Time 0.00
Received By rwbrown Date 2022-12-05 Time 06:01 Sent To  
Notes
2022-12-05 06:04:361ST PLUMBING REVIEW
  
 THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED
 BY RYAN BROWN WITH THE FOLLOWING COMMENTS.
  
 1. 2017 WPB AMENDS 107.2.1 - PLEASE HAVE THE PERSON WHO
 DESIGNED THE DRAWING PRINT THEIR NAME, SIGN THEIR NAME,
 AS WELL AS PUT YOUR CONTRACTOR NUMBER ON THE DRAWING AS
 REQUIRED BY THE WEST PALM BEACH AMENDMENTS TO CHAPTER
 1.
  
 2. 2020 FRC G2413.3 (402.3) - PLEASE SHOW THE METHOD
 USED FOR PIPE SIZING. INCLUDE PIPE SIZES, MATERIALS
 USED, BTU LOADS AND GAS PRESSURES INVOLVED. ALSO
 INCLUDE A REFERENCE FOR THE TABLE FROM THE GAS CODE
 THAT WAS USED FOR SIZING THE SYSTEM.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
  
 RYAN W. BROWN
 CHIEF PLUMBING INSPECTOR
 OFFICE: 561-805-6692
 CELL: 561-517-4293
 EMAIL: [email protected]
  
  
 V7 FPC - 2020 FLORIDA PLUMBING CODE
 V7 FGC - 2020 FLORIDA FUEL GAS
 V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE
 V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE
 V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE
 V7 FEC - 2020 FLORIDA ENERGY CONSERVATION
 2021 F.S. - 2021 FLORIDA STATUTES
 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE
 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE
 FBC CHAPTER 1
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-15 Cont ID  
Sent By rwbrown Date 2022-12-15 Time 07:01 Rev Time 0.00
Received By rwbrown Date 2022-12-14 Time 06:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-07 Cont ID  
Sent By rwbrown Date 2022-12-07 Time 06:56 Rev Time 0.00
Received By rwbrown Date 2022-12-02 Time 05:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2022-12-15 Cont ID  
Sent By rwbrown Date 2022-12-15 Time 07:00 Rev Time 0.00
Received By rwbrown Date 2022-12-15 Time 07:00 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-12-07 Cont ID  
Sent By rwbrown Date 2022-12-07 Time 06:56 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop PRIVATEPRV PRIVATE PROVIDER DOCUMENTS
Rev No 1 Status P Date 2022-11-30 Cont ID  
Sent By shill Date 2022-11-30 Time 12:58 Rev Time 0.00
Received By shill Date 2022-11-30 Time 12:58 Sent To  
Notes
2022-11-30 12:58:44INSPECTIONS
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-12-07 Cont ID  
Sent By rwbrown Date 2022-12-07 Time 06:56 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved