Plan Review Details - Permit 22110775
Plan Review Stops For Permit 22110775
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-02-15 Cont ID  
Sent By rmcdouga Date 2023-02-15 Time 13:38 Rev Time 0.00
Received By rmcdouga Date 2023-02-15 Time 13:38 Sent To  
Notes
2023-02-15 13:39:36BUILDING PROVISO
 THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10
 FEET FROM ANY OPENINGS INTO A BUILDING. FBC-R303.5.1
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-01-26 Cont ID  
Sent By rmcdouga Date 2023-01-26 Time 10:36 Rev Time 0.00
Received By rmcdouga Date 2023-01-26 Time 10:10 Sent To  
Notes
2023-01-26 10:59:45PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10
 FEET FROM ANY OPENINGS INTO A BUILDING. R303.5.1 INTAKE
 OPENINGS. MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE
 OPENINGS SHALL BE LOCATED NOT LESS THAN 10 FEET (3048
 MM) FROM ANY HAZARDOUS OR NOXIOUS CONTAMINANT, SUCH AS
 VENTS, CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS,
 PARKING LOTS AND LOADING DOCKS.
  
 2) SUBMIT ALL THREE PAGES OF THE GENERATOR PAD
 ENGINEERING. SEE THE SIGNATURE REVIEW FOR COMMENTS
 ABOUT THE DIGITAL SIGNATURE. FBC 107.2.1
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-12-27 Cont ID  
Sent By rperdomo Date 2022-12-27 Time 09:14 Rev Time 0.00
Received By rperdomo Date 2022-12-23 Time 11:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-15 Cont ID  
Sent By rmcdouga Date 2023-02-15 Time 13:39 Rev Time 0.00
Received By rmcdouga Date 2023-01-30 Time 13:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-01-26 Cont ID  
Sent By rmcdouga Date 2023-01-26 Time 10:59 Rev Time 0.00
Received By rmcdouga Date 2022-12-20 Time 10:02 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-02-15 Cont ID  
Sent By rmcdouga Date 2023-02-15 Time 13:31 Rev Time 0.00
Received By rmcdouga Date 2023-02-15 Time 13:31 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-01-26 Cont ID  
Sent By rmcdouga Date 2023-01-26 Time 10:24 Rev Time 0.00
Received By rmcdouga Date 2023-01-26 Time 10:10 Sent To  
Notes
2023-01-26 10:36:44THE ENGINEER'S DIGITAL SIGNATURE ON THE GENERATOR PAD
 DRAWING CAN NOT BE VERIFIED. IT DOES NOT APPEAR TO BE
 AN ORIGINAL DIGITALLY SIGNED DOCUMENT. ELECTRONICALLY
 SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT
 OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE
 AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO
 PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE
 ACCEPTABLE. FS 481 & FAC 61G1 OR FS 471 & FAC 61G15

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-30 Cont ID  
Sent By asangele Date 2022-12-30 Time 10:05 Rev Time 0.00
Received By asangele Date 2022-12-30 Time 10:05 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved