| Plan Review Stops For Permit 22110755 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2023-02-24 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-02-24 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-02-23 |
Time |
15:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-19 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-19 |
Time |
16:06 |
Sent To |
|
|
| Notes |
| 2023-01-19 16:32:04 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW FAILED: | | | | | | FBC B 107.2.1, COMMENTS ARE NOT CLEAR AS TO SELECTED | | | APPROVED ADHESIVE TO BE USED(AH160?). PLEASE PROVIDE A | | | RESPONSE LETTER TO SHOW SPECIFICALLY WHICH ADHESIVE IS | | | TO BE USED ALONG WITH APPROVED CALCULATIONS OR REMOVE | | | THE ADHESIVE DETAILS AND USE THE MECHANICAL ANCHORING | | | OPTION AS SHOWN ON PLAN SHEET S-2 FOR ALL ANCHORING | | | ATTACHMENTS. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-28 |
Time |
13:04 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-12-28 |
Time |
10:27 |
Sent To |
|
|
| Notes |
| 2022-12-28 13:26:50 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | 1.) FBC B 107.2.1, CLARIFY ON PLAN SHEET S-1, WHICH | | | ROOF SECTION IS FLAT AND WHICH ROOF SECTION IS PITCHED. | | | 2.) FBC B 107.2.1, CLARIFY ON PLAN SHEET S-2, AT WHICH | | | AREA OF ROOF IS THE LAG BOLT ANCHORING TO BE USED. | | | 3.) FBC B 107.2.1, CLARIFY ON PLAN SHEET S-3, AT WHICH | | | AREA OF ROOF IS THE FOAM ADHERED SYSTEM TO BE USED. IF | | | THIS ADHESIVE SYSTEM IS TO BE USED, PLEASE SELECT THE | | | PRODUCT TO BE USED AND REMOVE THE PRODUCT FROM PLANS | | | THAT IS NOT TO BE USED (TILE FOAM POLSET AH160 OR DAP | | | TOUCH N SEAL STORM BOND). | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2023-02-08 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-02-08 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-02-08 |
Time |
10:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-12-09 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-12-09 |
Time |
16:13 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-12-09 |
Time |
16:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-02-24 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-02-24 |
Time |
08:16 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-02-02 |
Time |
12:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-19 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-04 |
Time |
13:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-28 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-11-21 |
Time |
07:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-02-08 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-02-08 |
Time |
10:26 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-02-08 |
Time |
10:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-19 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-19 |
Time |
16:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-12-09 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-12-09 |
Time |
16:13 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-12-09 |
Time |
16:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-02-10 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2023-02-10 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2023-02-10 |
Time |
16:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-12-14 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-12-14 |
Time |
15:33 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-12-14 |
Time |
15:33 |
Sent To |
|
|
| Notes |
|
|