Plan Review Details - Permit 22110665
Plan Review Stops For Permit 22110665
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-03-14 Cont ID  
Sent By rmcphers Date 2023-03-14 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2023-03-14 Time 09:13 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-02-09 Cont ID  
Sent By rmcphers Date 2023-02-09 Time 10:43 Rev Time 0.00
Received By rmcphers Date 2023-02-09 Time 10:43 Sent To  
Notes
2023-02-09 10:44:16EV CHARGING STATIONS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 2ND REVIEW - NO CHANGES
  
 CORRECTIONS NEEDED -
  
 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING
 INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING
 STATIONS IS AN ACCESSIBLE PARKING SPACE, ACCESS AISLE,
 SIGNAGE ETC. PER FBC 502
 FBC 406.1.7 ELECTRIC VEHICLE CHARGING STATIONS.
 ACCESSIBILITY TO ELECTRIC VEHICLE CHARGING STATIONS
 SHALL BE PROVIDED IN ACCORDANCE WITH CHAPTER 11.
 OR EXPLAIN IN A WRITTEN RESPONSE WHY THE ACCESSIBLE
 SPACE WOULD NOT BE REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-01-04 Cont ID  
Sent By rmcphers Date 2023-01-04 Time 16:15 Rev Time 0.00
Received By rmcphers Date 2023-01-04 Time 16:07 Sent To  
Notes
2023-01-04 16:15:35EV CHARGING STATIONS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) ELECTRIC VEHICLE CHARGING STATIONS ARE BEING
 INSTALLED - PLEASE SHOW THAT AT LEAST 1 OF THE CHARGING
 STATIONS IS AN ACCESSIBLE PARKING SPACE, ACCESS AISLE,
 SIGNAGE ETC. PER FBC 502
 FBC 406.1.7 ELECTRIC VEHICLE CHARGING STATIONS.
 ACCESSIBILITY TO ELECTRIC VEHICLE CHARGING STATIONS
 SHALL BE PROVIDED IN ACCORDANCE WITH CHAPTER 11.
 OR EXPLAIN IN A WRITTEN RESPONSE WHY THE ACCESSIBLE
 SPACE WOULD NOT BE REQUIRED.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2023-03-09 Cont ID  
Sent By jleahy Date 2023-03-09 Time 08:22 Rev Time 0.00
Received By jleahy Date 2023-03-09 Time 08:17 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2023-02-10 Cont ID  
Sent By jleahy Date 2023-02-10 Time 15:17 Rev Time 0.00
Received By jleahy Date 2023-02-10 Time 15:09 Sent To  
Notes
2023-02-10 15:18:19ITEM #2 FROM 12/5/ REVIEW NOTADDRESSED. JLEAHY

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-12-05 Cont ID  
Sent By jleahy Date 2022-12-05 Time 07:28 Rev Time 0.00
Received By jleahy Date 2022-12-05 Time 06:50 Sent To  
Notes
2022-12-05 07:31:14 
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 (1) LOAD ON 147 DOES NOT INCLUDE 125% PER 625.41
  
 625.41 OVERCURRENT PROTECTION.
  
 OVERCURRENT PROTECTION FOR FEEDERS AND BRANCH CIRCUITS
 SUPPLYING EQUIPMENT SHALL BE SIZED FOR CONTINUOUS DUTY
 AND SHALL HAVE A RATING OF NOT LESS THAN
 125 PERCENT OF THE MAXIMUM LOAD OF THE EQUIPMENT. WHERE
 NONCONTINUOUS LOADS ARE SUPPLIED FROM THE SAME FEEDER,
 THE OVERCURRENT DEVICE SHALL HAVE
 A RATING OF NOT LESS THAN THE SUM OF THE NONCONTINUOUS
 LOADS PLUS 125 PERCENT OF THE CONTINUOUS LOADS.
  
 (2) FAULT CURRENT CALCULATION NEED FOR SERVICE. 110.24

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-03-14 Cont ID  
Sent By rmcphers Date 2023-03-14 Time 09:14 Rev Time 0.00
Received By rmcphers Date 2023-03-08 Time 07:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-16 Cont ID  
Sent By asangele Date 2023-02-16 Time 08:54 Rev Time 0.00
Received By asangele Date 2023-02-16 Time 08:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-01-05 Cont ID  
Sent By asangele Date 2023-01-05 Time 16:36 Rev Time 0.00
Received By asangele Date 2023-01-05 Time 16:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-03-09 Cont ID  
Sent By jleahy Date 2023-03-09 Time 08:22 Rev Time 0.00
Received By jleahy Date 2023-03-09 Time 08:22 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-02-09 Cont ID  
Sent By rmcphers Date 2023-02-09 Time 10:44 Rev Time 0.00
Received By rmcphers Date 2023-02-09 Time 10:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-12-05 Cont ID  
Sent By jleahy Date 2022-12-05 Time 11:13 Rev Time 0.00
Received By jleahy Date 2022-12-05 Time 06:50 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-03-09 Cont ID  
Sent By asangele Date 2023-03-09 Time 10:12 Rev Time 0.00
Received By asangele Date 2023-03-09 Time 10:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2023-02-16 Cont ID  
Sent By asangele Date 2023-02-16 Time 08:53 Rev Time 0.00
Received By asangele Date 2023-02-16 Time 08:53 Sent To  
Notes
2023-02-16 08:54:02FAILED
 2/16/2022
  
 REPEAT COMMENTS NEED TO BE ADDRESSED
  
 EQUIPMENT NEEDS TO CLEARLY SHOW THAT ITS IS AVOIDING
 TREES AND TREE ROOTS.
  
 FULL PROPERTY SURVEY IS REQUIRED TO CONFIRM SITE MEETS
 REQUIRED PARKING SPACES.
  
 EV SPACES ARE NOT INCLUDED IN THE REQUIREMENT THEREFORE
 YOU MUST HAVE EXTRA PARKING ON SITE.
  
 PLEASE PROVIDE THE DIMENTIONS OF THE PROPOSED EV
 CHARGER SPOTS
  
 ONE OF THE EIGHT PROPOSED SPOTS MUST SEVER AS BOTH
 ACCESSIBLE AND EV FOR EQUAL OPPORTUNITIES
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2023-01-05 Cont ID  
Sent By asangele Date 2023-01-05 Time 16:24 Rev Time 0.00
Received By asangele Date 2023-01-05 Time 16:24 Sent To  
Notes
2023-01-05 16:36:18FAILED
 1/5/2022
  
  
 EQUIPMENT NEEDS TO CLEARLY SHOW THAT ITS IS AVOIDING
 TREES AND TREE ROOTS.
  
 FULL PROPERTY SURVEY IS REQUIRED TO CONFIRM SITE MEETS
 REQUIRED PARKING SPACES.
  
 EV SPACES ARE NOT INCLUDED IN THE REQUIREMENT THEREFORE
 YOU MUST HAVE EXTRA PARKING ON SITE.
  
 PLEASE PROVIDE THE DIMENTIONS OF THE PROPOSED EV
 CHARGER SPOTS
  
 ONE OF THE EIGHT PROPOSED SPOTS MUST SEVER AS BOTH
 ACCESSIBLE AND EV FOR EQUAL OPPORTUNITIES
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]
  
  
  
  