| Plan Review Stops For Permit 22110650 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-02-08 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-02-08 |
Time |
06:35 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-02-08 |
Time |
05:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-12-28 |
Time |
12:53 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-12-28 |
Time |
06:46 |
Sent To |
|
|
| Notes |
| 2022-12-28 12:59:44 | 1ST BUILDING REVIEW | | | RESULTS: CORRECTIONS NEEDED | | | | | | CHRISTOPHER S. THROOP, CBO, BN, PX, CFM | | | PLANS EXAMINER II | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: | | | | | | 1.PROVIDE A COPY OF THE MOST RECENT BOUNDARY LINE | | | SURVEY. | | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH | | | 107.2.5. | | | | | | 2.PROVIDE A COPY OF THE CURRENT FLORIDA PRODUCT | | | APPROVALS APPROVED UNDER THE 2020 FBC, FOR THE PROPOSED | | | EXT. DOOR???S AND WINDOWS. | | | FL PRODUCT APPROVALS SHALL INCLUDE THE COVER SHEETS, | | | EVALUATION REPORT AND INSTALLATIONS INSTRUCTIONS. | | | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE | | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | | | 3. PROVIDE A COPY OF THE ICC-ES REPORT FOR THE ICYNENE | | | SPRAY FOAM INSULATION. | | | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE | | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | | | | 4.PROVIDE LOCATION OF ATTIC ACCESS PER R807.1.7. | | | | | | 5.PROVIDE THE DESIGN PRESSURES FOR NEW ROOFING PER | | | FIGURE R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES | | | R301.2.1.1WIND DESIGN REQUIRED. | | | | | | 6.PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER THE | | | ENHANCED CALCULATED DESIGN PRESSURES OF ZONES 2 AND 3. | | | TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING | | | SCHEDULE FOR WOOD STRUCTURAL PANELS. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | | | | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-12-01 |
|
|
Cont ID |
|
| Sent By |
rperdomo |
Date |
2022-12-01 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
rperdomo |
Date |
2022-11-30 |
Time |
16:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-11-29 |
Time |
12:05 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-11-29 |
Time |
12:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-11-28 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2022-11-28 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2022-11-28 |
Time |
15:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-02-17 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-02-17 |
Time |
12:28 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-18 |
Time |
17:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-12-28 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-11-23 |
Time |
06:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2023-02-24 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-02-24 |
Time |
16:11 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-02-16 |
Time |
07:56 |
Sent To |
|
|
| Notes |
| 2023-02-24 16:11:49 | RECEIPT MU-2023-07742 - $459.33 PAID | | 2023-02-16 07:57:05 | EMAILED IMPACT FOR REVIEW-AO |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-12-28 |
Time |
13:20 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-12-28 |
Time |
13:20 |
Sent To |
|
|
| Notes |
| 2022-12-28 13:20:35 | IMPACT WILL BE NOTIFIED TO REVIEW AFTER THE PERMIT HAS | | | PASSED BOTH BUILDING AND ZONING REVIEWS. | | | | | | IMPACT FEES | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF UPON | | | APPROVAL AND FEE PAYMENT (IF ANY), PLEASE UPLOAD THE | | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | | [email protected] . | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2022-12-01 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-12-01 |
Time |
16:53 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-12-01 |
Time |
16:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-11-29 |
Time |
12:04 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-11-29 |
Time |
12:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
P |
Date |
2023-02-16 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2023-02-16 |
Time |
15:39 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2023-02-16 |
Time |
15:39 |
Sent To |
|
|
| Notes |
| 2023-02-16 15:39:57 | PRIVATE PROVIDER INSPECTIONS |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-12-28 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-12-28 |
Time |
06:46 |
Sent To |
|
|
| Notes |
| 2022-12-28 10:42:39 | PROVISO ON PLAN PAGE A-3.1: A SEPERATE ROOFING PERMIT | | | IS REQUIRED. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-02-08 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2023-02-08 |
Time |
06:35 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2023-02-08 |
Time |
05:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-12-28 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-12-28 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-12-28 |
Time |
06:46 |
Sent To |
|
|
| Notes |
| 2022-12-01 16:55:30 | MECHANICAL DIGITAL SIGNATURES APPROVED ME |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-02-15 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2023-02-15 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2023-02-15 |
Time |
08:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-11-28 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2022-11-28 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2022-11-28 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2022-11-28 15:10:03 | REQUIRES SUBMITTAL OF SEPARATE LANDSCAPE PERMIT |
|
|