| Plan Review Stops For Permit 22110012 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
4 |
Status |
P |
Date |
2023-01-30 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-01-30 |
Time |
12:05 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-01-30 |
Time |
12:05 |
Sent To |
|
|
| Notes |
| 2023-01-30 12:06:40 | SPOKE WITH HARRISON FULCHS ADDRESS APPROPRIATE FOR | | | PROJECT. |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
3 |
Status |
F |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-01-24 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-01-24 |
Time |
16:00 |
Sent To |
|
|
| Notes |
| 2023-01-24 16:00:27 | PREVIOUS COMMENTS NOT ADDRESSED |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
F |
Date |
2023-01-05 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2023-01-05 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2023-01-05 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2023-01-05 09:28:52 | I AM TRYING T ESTABLISH THE APPROPRIATE ADDRESS FOR THE | | | AREA OF WORK, USING THE ADDRESS OF 366 S ROSEMARY AVE | | | DOES NOT ADDRESS THE COMMENTS. I BELIEVE THAT THE | | | ADDRESSES BASED ON THE PLANS SHOULD BE 585 FERN ST, | | | PLEASE CONFIRM WITH BUILDER OR OWNER AND RESPOND TO | | | [email protected] OR CALL 561-805-6659 |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2022-12-13 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-12-13 |
Time |
16:22 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-12-13 |
Time |
16:22 |
Sent To |
|
|
| Notes |
| 2022-12-13 16:24:08 | PLANS INDICATE THAT THE AREA OF WORK IS FOR 501 FERN ST | | | UNIT 105, THIS IS NOT AN ADDRESS FOR THIS BUILDING, I | | | BELIEVE THAT THE ADDRESSES BASED ON THE PLANS SHOULD BE | | | 585 FERN ST, PLEASE CONFIRM WITH BUILDER OR OWNER AND | | | RESPOND TO [email protected] OR CALL 561-805-6659 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2023-02-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-02-14 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-02-14 |
Time |
10:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-02-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-02-02 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-02-02 |
Time |
08:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-24 |
Time |
11:15 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-24 |
Time |
11:13 |
Sent To |
|
|
| Notes |
| 2023-01-24 11:15:42 | AWNING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE REVISED SITE PLAN SHOWS 6 AWNINGS - THE | | | ARCHITECTURAL PLANS PROVIDE A SIZING PLAN FOR AWNINGS | | | 1, 2, 3 AND 4 - PLEASE PROVIDE THE ARCHITECTURAL SIZING | | | PLAN FOR AWNINGS 5 AND 6. FBC 107 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2023-01-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-04 |
Time |
10:56 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-04 |
Time |
10:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-12-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-13 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-13 |
Time |
15:46 |
Sent To |
|
|
| Notes |
| 2022-12-13 15:48:33 | AWNING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PLEASE PROVIDE A COPY OF THE AWNING MATERIAL FLAME | | | CERTIFICATE - FBC 3105.3.4.1 | | | FABRIC USED FOR AWNINGS OR FABRIC-COVERED FRAMES SHALL | | | MEET THE FLAME PROPAGATION PERFORMANCE CRITERIA OF NFPA | | | 701 OR HAVE A FLAME SPREAD INDEX NOT GREATER THAN 25 | | | WHEN TESTED IN ACCORDANCE WITH ASTM E84 OR UL 723. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2023-02-02 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-02-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-02-02 |
Time |
10:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2023-01-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2023-01-24 |
Time |
10:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-12-29 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-12-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-12-29 |
Time |
10:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2022-11-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-11-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-11-04 |
Time |
10:35 |
Sent To |
|
|
| Notes |
| 2022-11-04 15:22:31 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE IS AN INDICATION OF A FABRIC COVERING OVER THE | | | AWNING FRAME, HOWEVER, THERE NO FLAME CERIFICATION FOR | | | THAT PROPOSED FABRIC. | | | | | | PER NFPA 101, CH 11 | | | | | | 11.11.2 FLAME PROPAGATION PERFORMANCE. | | | 11.11.2.1 ALL TENT FABRIC SHALL MEET THE FLAME | | | PROPAGATION PERFORMANCE | | | CRITERIA CONTAINED IN TEST METHOD 2 OF NFPA 701 | | | | | | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE FLAME | | | CERTIFICATE FOR THE AWNING. | | | | | | | | | 2) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2023-02-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-02-27 |
Time |
09:37 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-02-13 |
Time |
16:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-02-06 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-02-06 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-02-01 |
Time |
14:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-01-31 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-01-31 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-23 |
Time |
13:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-05 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-01-05 |
Time |
11:52 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-12-28 |
Time |
15:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-12-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-13 |
Time |
16:24 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-11-03 |
Time |
07:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
P |
Date |
2023-02-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-02-14 |
Time |
10:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-02-14 |
Time |
10:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2023-02-02 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-02-02 |
Time |
08:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-02-02 |
Time |
08:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-24 |
Time |
11:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-24 |
Time |
11:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-01-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-04 |
Time |
10:56 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-04 |
Time |
10:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-12-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-13 |
Time |
15:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-13 |
Time |
15:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2023-02-24 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-02-24 |
Time |
15:17 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-02-24 |
Time |
15:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2023-02-03 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-02-03 |
Time |
15:18 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-02-03 |
Time |
15:16 |
Sent To |
|
|
| Notes |
| 2023-02-03 15:18:10 | AWNING PLAN AND ELEVATIONS NOT DRAWN TO SCALE. | | | | | | [REPEAT COMMENT]1. DIMENSIONS PROVIDED ON SHEETS A0H12 | | | - A0H16 ARE NOT ACCURATE DIMENSIONS. (FOR EXAMPLE: | | | SHEET A0H13 CANOPY WIDTH SHOWN AT 3'-4 1/2" WHICH FAR | | | EXCEEDS THE ILLUSTRATED 3' DIMENSION FOR DEPTH) | | | PLEASE REVISE ALL PLANS AND ELEVATIONS TO BE ACCURATE. | | | | | | 2. PLEASE NOTE THIS HAS ALREADY BEEN INSTALLED WITHOUT | | | AN APPROVED PERMIT, HAS BEEN SUBJECT TO 4X FEES. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-01-30 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-01-30 |
Time |
15:46 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-01-30 |
Time |
15:41 |
Sent To |
|
|
| Notes |
| 2023-01-30 15:46:00 | 1. DIMENSIONS PROVIDED ON SHEETS A0H12 - A0H16 ARE NOT | | | ACCURATE DIMENSIONS. (FOR EXAMPLE: SHEET A0H13 CANOPY | | | WIDTH SHOWN AT 3'-4 1/2" WHICH FAR EXCEEDS THE | | | ILLUSTRATED 3' DIMENSION FOR DEPTH) | | | PLEASE REVISE ALL PLANS AND ELEVATIONS TO BE ACCURATE. | | | | | | 2. PLEASE NOTE THIS HAS ALREADY BEEN INSTALLED WITHOUT | | | AN APPROVED PERMIT, HAS BEEN SUBJECT TO 4X FEES. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-11-07 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-11-07 |
Time |
10:23 |
Sent To |
|
|
| Notes |
| 2022-11-07 10:31:03 | PER SEC. 94-109 TABLE IV-5: PROJECTION STANDARDS | | | | | | AWNINGS HAVE A MINIMUM HORIZONTAL PROJECTION OF 3FT. | | | PROPOSED AWNINGS ARE SHOWN ONLY TO PROJECT1.4FT. PLEASE | | | ADJUST TO MEET THE MINIMUM PROJECTION STANDARD. | | | | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | [email protected] 822-1426 |
|
|