Rev No 3 Status P Date 2023-01-30 Cont ID  
Sent By lquinone Date 2023-01-30 Time 09:26 Rev Time 0.00
Received By lquinone Date 2023-01-30 Time 09:26 Sent To  
Notes
2023-01-30 09:27:26PASSED WITH PROVISO.
  
 THERE IS A WATER LINE IN THE VICINITY OF THIS PROJECT.
 PER CHAPTER 556 OF THE FLORIDA STATE STATUTES, YOU MUST
 CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL BUSINESS
 DAYS IN ADVANCE OF ANY CONSTRUCTION OR DEMOLITION WORK.
 INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2023-01-24 Cont ID  
Sent By lquinone Date 2023-01-24 Time 10:10 Rev Time 0.00
Received By lquinone Date 2023-01-24 Time 10:09 Sent To  
Notes
2023-01-24 10:13:15DRAWING IS NOT CLEAR. CLEARLY LABEL BOTH DRIVEWAYS WITH
 MEASUREMENTS OF LENGTH AND WIDTH, INCLUDING APRONS.
 SHOW MIN. 3 FT. SETBACK FROM PROPERTY LINE WHERE
 WIDENING IS PROPOSED. PLEASE ADDRESS ANY OTHER
 REVIEWERS??? COMMENTS.
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2023-01-04 Cont ID  
Sent By lquinone Date 2023-01-04 Time 09:55 Rev Time 0.00
Received By lquinone Date 2023-01-04 Time 09:55 Sent To  
Notes
2023-01-04 09:58:27 
 DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND
 VERTICALLY. CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF
 PROPOSED DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER
 METERS, SANITARY CLEANOUTS, STORM INLETS ETC. IN
 VICINITY OF PROPOSED DRIVEWAY. DO NOT CONSTRUCT
 DRIVEWAY ON TOP OF WATER METERS, SANITARY CLEANOUTS,
 STORMWATER INLETS ETC. MAXIMUM DRIVEWAY WIDTHS AT RIGHT
 OF WAY SHALL NOT EXCEED 20 FT. PLUS TWO 3 FT. FLARES.
 (TWO 10 FT. DRIVEWAYS PLUS 3 FT. FLARES ON EACH ARE
 ACCEPTABLE).
  
 SHOW EXISTING OR PROPOSED DRIVEWAY APRON.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT
 WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR
 DRIVEWAYS.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON???T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE WHERE CAN I FIND MY PLAN REVIEW
 COMMENTS ONLINE? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-31 Cont ID  
Sent By vbroglia Date 2023-01-31 Time 15:12 Rev Time 0.00
Received By vbroglia Date 2023-01-24 Time 16:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-01-24 Cont ID  
Sent By aoliver Date 2023-01-24 Time 16:16 Rev Time 0.00
Received By aoliver Date 2023-01-18 Time 17:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-01-10 Cont ID  
Sent By vbroglia Date 2023-01-10 Time 15:57 Rev Time 0.00
Received By vbroglia Date 2022-12-28 Time 10:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-01-31 Cont ID  
Sent By vbroglia Date 2023-01-31 Time 15:12 Rev Time 0.00
Received By vbroglia Date 2023-01-31 Time 15:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2023-01-20 Cont ID  
Sent By vbroglia Date 2023-01-20 Time 14:11 Rev Time 0.00
Received By vbroglia Date 2023-01-20 Time 14:11 Sent To  
Notes
2023-01-20 14:12:461/20/23 FAILED
  
 SEE PREVIOUS COMMENT ABOUT SETBACKS
  
 PLEASE NOTE: FENCE REQUIRES A SEPERATE PERMIT

Review Stop Z ZONING
Rev No 1 Status F Date 2023-01-10 Cont ID  
Sent By VBroglia Date 2023-01-10 Time 15:55 Rev Time 0.00
Received By vbroglia Date 2023-01-10 Time 15:55 Sent To  
Notes
2023-01-10 15:57:221/10/23 FAIELD
  
 PER CODE REQUIREMENT DRIVEWAYS WITHIN A FRONT YARD MUST
 BE THREE FEET FROM A SIDE OR REAR PROPERTY LINE,
 DRIVEWAY MAY BE REPLACED IN THE EXACT LOCATION OR WITH
 A GREATER SETBACK THAN CURRENTLY EXISTS.
  
 PLEASE PROVIDE DRIVEWAY WIDTH MEASUREMENTS. PER CODE
 PARKING FOR LESS THAN THREE RESIDENTIAL DWELLING UNITS
 MAY BE ACHIEVED BY INSTALLING ACCESS POINTS IN ONE OF
 THE FOLLOWING WAYS:
  
 A SINGLE DRIVEWAY WITH A WIDTH OF NO GREATER THAN 20
 FEET AT THE PROPERTY LINE OR WHERE THE DRIVEWAY ADJOINS
 THE APRON IF THE APRON IS NOT LOCATED WHOLLY WITHIN THE
 RIGHT-OF-WAY.
  
 A CIRCULAR DRIVEWAY PROVIDED THAT EACH DRIVEWAY OPENING
 SHALL NOT EXCEED TEN FEET IN WIDTH AT THE PROPERTY LINE
 OR WHERE THE DRIVEWAY OPENING ADJOINS THE APRON IF THE
 APRON IS NOT LOCATED WHOLLY WITHIN THE RIGHT-OF-WAY.
  
 TWO DRIVEWAYS EACH WITH A WIDTH OF NO GREATER THAN TEN
 FEET AT THE PROPERTY LINE OR WHERE THE DRIVEWAY ADJOINS
 THE APRON IF THE APRON IS NOT LOCATED WHOLLY WITHIN THE
 RIGHT-OF-WAY, PROVIDED THAT THE DRIVEWAYS SHALL BE ON
 TWO DIFFERENT STREET FRONTAGES OR ON ONE STREET
 FRONTAGE AND THE ALLEY.
  
 **** REVIEWD BY ****
 VALENTINA BROGLIA
 PLANNER
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved