Plan Review Details - Permit 22101259
Plan Review Stops For Permit 22101259
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-01-09 Cont ID  
Sent By rmcphers Date 2023-01-09 Time 09:12 Rev Time 0.00
Received By rmcphers Date 2023-01-09 Time 09:12 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-12-07 Cont ID  
Sent By rmcphers Date 2022-12-07 Time 11:46 Rev Time 0.00
Received By rmcphers Date 2022-12-07 Time 11:41 Sent To  
Notes
2022-12-07 11:46:25DOCK AND BOAT LIFT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE BOAT LIFT ENGINEERING SIGNED AND SEALED BY OSCAR
 BERMUDEZ P.E. DOES NOT SHOW AS DIGITALLY SIGNED IN
 ADOBE READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX
 NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED
 IN ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-11-18 Cont ID  
Sent By rmcphers Date 2022-11-18 Time 16:17 Rev Time 0.00
Received By rmcphers Date 2022-11-18 Time 16:17 Sent To  
Notes
2022-11-18 16:19:10DOCK AND BOAT LIFT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE THE DRAWINGS FOR THE BOAT LIFT -
 REVIEWED AND MARKED APPROVED BY THE ENGINEER OF RECORD
 AS NOTED ON THE DRAWINGS.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-09 Cont ID  
Sent By rmcphers Date 2023-01-09 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2023-01-04 Time 15:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-30 Cont ID  
Sent By ajones Date 2022-12-30 Time 09:29 Rev Time 0.00
Received By ajones Date 2022-12-06 Time 07:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-18 Cont ID  
Sent By rmcphers Date 2022-11-18 Time 16:19 Rev Time 0.00
Received By rmcphers Date 2022-10-28 Time 07:17 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-01-09 Cont ID  
Sent By rmcphers Date 2023-01-09 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2023-01-09 Time 09:12 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-12-07 Cont ID  
Sent By rmcphers Date 2022-12-07 Time 11:46 Rev Time 0.00
Received By rmcphers Date 2022-12-07 Time 11:46 Sent To  
Notes
2022-12-07 11:48:10SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) THE BOAT LIFT ENGINEERING SIGNED AND SEALED BY OSCAR
 BERMUDEZ P.E. DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE
 READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-18 Cont ID  
Sent By rmcphers Date 2022-11-18 Time 16:19 Rev Time 0.00
Received By rmcphers Date 2022-11-18 Time 16:19 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-12-30 Cont ID  
Sent By ajones Date 2022-12-30 Time 09:28 Rev Time 0.00
Received By ajones Date 2022-12-30 Time 09:28 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-11-04 Cont ID  
Sent By afowlkes Date 2022-11-04 Time 11:00 Rev Time 0.00
Received By afowlkes Date 2022-11-04 Time 11:00 Sent To  
Notes
2022-11-04 11:02:1111/04/22 FAILED
  
 THE NEW BOATLIFT ENCROACHES ONTO THE NORTHERN ONE-THIRD
 OF THE PROPERTY. PER CITY CODE, IT MUST BE LOCATED IN
 THE MIDDLE ONE THIRD OF THE PROPERTY.
  
 ALEXANDER FOWLKES
 [email protected]
 5618221431