Plan Review Details - Permit 22101231
Plan Review Stops For Permit 22101231
Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-11-28 Cont ID  
Sent By medwards Date 2022-11-28 Time 07:53 Rev Time 0.00
Received By medwards Date 2022-11-21 Time 09:00 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-11-18 Cont ID  
Sent By medwards Date 2022-11-18 Time 08:48 Rev Time 0.00
Received By medwards Date 2022-11-14 Time 09:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-08 Cont ID  
Sent By medwards Date 2022-11-08 Time 06:23 Rev Time 0.00
Received By medwards Date 2022-10-27 Time 08:38 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2022-11-28 Cont ID  
Sent By medwards Date 2022-11-28 Time 07:51 Rev Time 0.00
Received By medwards Date 2022-11-28 Time 07:51 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2022-11-18 Cont ID  
Sent By medwards Date 2022-11-18 Time 08:47 Rev Time 0.00
Received By medwards Date 2022-11-18 Time 08:47 Sent To  
Notes
2022-11-18 08:48:03PROVIDE A DRAWING SHOWING THE LOCATION OF THE
 CONDENSING UNITS. FBC 107.3.5

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2022-11-08 Cont ID  
Sent By medwards Date 2022-11-08 Time 06:08 Rev Time 0.00
Received By medwards Date 2022-11-08 Time 06:08 Sent To  
Notes
2022-11-08 06:23:281) THIIS PERMIT IS FOR THE WALK-IN COOLER BUT THERE WAS
 NOTHING SUBMITTED FOR THE WALK-IN COOLER. THERE ARE 2
 DIFFERENT DRAWINGS ONE SHOWING THE COOLER UP AGAINST
 THE STAIR WALL WITH THE ENTRANCE TO THE COOLER THROUUGH
 A DOOR UNDER THE STAIRS AND ANOTHER DRAWING SHOWING THE
 COOLER AWAY FROM THE WALL WITH THE GLYCOL COOLERS
 SITTING BEHIND THE COOLER. PLEASE SUBMIT THE ONE
 DRAWING THAT WILL BE ACCURATE TO THE TRUE LAYOUT OF THE
 COOLER. FBC 107.3.5
 2) THE WALK-IN COOLER REFRIGERATION SYSTEM MUST MEET
 FMC 1102. PROVIDE THE FOLLOWING INFORMATION FOR THIS
 COOLER.
  
 1102.1 GENERAL. THE SYSTEM CLASSIFICATION, ALLOWABLE
 REFRIGERANTS,
 MAXIMUM QUANTITY, ENCLOSURE REQUIREMENTS, LOCATION
 LIMITATIONS, AND FIELD PRESSURE TEST REQUIREMENTS SHALL
 BE
 DETERMINED AS FOLLOWS:
 1. DETERMINE THE REFRIGERATION SYSTEM'S CLASSIFICATION,
 IN
 ACCORDANCE WITH SECTION 1103.3.
 2. DETERMINE THE REFRIGERANT CLASSIFICATION IN
 ACCORDANCE
 WITH SECTION 1103.1.
 3. DETERMINE THE MAXIMUM ALLOWABLE QUANTITY OF
 REFRIGERANT
 IN ACCORDANCE WITH SECTION 1104, BASED ON TYPE OF
 REFRIGERANT, SYSTEM CLASSIFICATION AND OCCUPANCY.
 4. DETERMINE THE SYSTEM ENCLOSURE REQUIREMENTS IN
 ACCORDANCE
 WITH SECTION 1104.
 5. REFRIGERATION EQUIPMENT AND APPLIANCE LOCATION AND
 INSTALLATION SHALL BE SUBJECT TO THE LIMITATIONS OF
 CHAPTER
 3.
 6. NONFACTORY-TESTED, FIELD-ERECTED EQUIPMENT AND
 APPLIANCES
 SHALL BE PRESSURE TESTED IN ACCORDANCE WITH SECTION
 1108.

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-10-31 Cont ID  
Sent By rwbrown Date 2022-10-31 Time 11:58 Rev Time 0.00
Received By rwbrown Date 2022-10-31 Time 11:58 Sent To  
Notes
2022-10-31 12:55:18PLUMBING UNDER 22050615

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-11-08 Cont ID  
Sent By medwards Date 2022-11-08 Time 06:23 Rev Time 0.00
Received By medwards Date 2022-11-08 Time 06:23 Sent To  
Notes
***NONE***