Plan Review Details - Permit 22101201
Plan Review Stops For Permit 22101201
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-12-08 Cont ID  
Sent By rmcdouga Date 2022-12-08 Time 07:42 Rev Time 0.00
Received By rmcdouga Date 2022-12-08 Time 07:03 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-11-18 Cont ID  
Sent By rmcdouga Date 2022-11-18 Time 15:15 Rev Time 0.00
Received By rmcdouga Date 2022-11-18 Time 14:06 Sent To  
Notes
2022-11-18 15:15:221ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SHOW COMPLIANCE WITH FBCR 4501.17 FOR REQUIRED
 SWIMMING POOL BARRIER. NOTE: FENCES THAT ARE USED FOR
 POOL BARRIERS ARE REQUIRED TO BE ON THE POOL OWNER'S
 PROPERTY AND UNDER THE CONTROL OF THE POOL OWNER.THE
 SURVEY SHOWS THAT SOME OF THE EXISTING FENCE IS ON THE
 NEIGHBORS PROPERTY.
  
 2) SUBMIT THE MANUFACTURER'S SPECIFICATION FOR THE
 WINDOW AND DOOR ALARMS. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-11-21 Cont ID  
Sent By ppetty Date 2022-11-21 Time 10:00 Rev Time 0.00
Received By ppetty Date 2022-11-21 Time 09:49 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2022-11-15 Cont ID  
Sent By rwbrown Date 2022-11-15 Time 10:47 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
2022-11-15 10:48:46MASTER PERMIT 21080512 INCLUDES GAS LINES ROUGHED IN TO
 POOL HEATER.
 GAS SUB REQUIRED FOR THIS PERMIT FOR FINAL CONNECTIONS
 TO POOL HEATER.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-08 Cont ID  
Sent By rmcdouga Date 2022-12-08 Time 07:42 Rev Time 0.00
Received By rmcdouga Date 2022-12-08 Time 07:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-02 Cont ID  
Sent By asangele Date 2022-12-02 Time 10:27 Rev Time 0.00
Received By asangele Date 2022-12-02 Time 10:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-11-15 Cont ID  
Sent By rwbrown Date 2022-11-15 Time 10:49 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-18 Cont ID  
Sent By rmcdouga Date 2022-11-18 Time 15:08 Rev Time 0.00
Received By rmcdouga Date 2022-11-18 Time 14:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-02 Cont ID  
Sent By asangele Date 2022-12-02 Time 10:27 Rev Time 0.00
Received By asangele Date 2022-12-02 Time 10:27 Sent To  
Notes
***NONE***