Plan Review Details - Permit 22100953
Plan Review Stops For Permit 22100953
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status N Date 2023-07-28 Cont ID  
Sent By cthroop Date 2023-07-28 Time 09:26 Rev Time 0.00
Received By cthroop Date 2023-07-28 Time 08:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status N Date 2023-03-29 Cont ID  
Sent By cthroop Date 2023-03-29 Time 13:07 Rev Time 0.00
Received By cthroop Date 2023-03-29 Time 07:41 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2022-11-28 Cont ID  
Sent By cthroop Date 2022-11-28 Time 10:34 Rev Time 0.00
Received By cthroop Date 2022-11-23 Time 17:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-07-28 Cont ID  
Sent By cthroop Date 2023-07-28 Time 16:41 Rev Time 0.00
Received By cthroop Date 2023-07-19 Time 08:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-30 Cont ID  
Sent By cthroop Date 2023-03-30 Time 07:13 Rev Time 0.00
Received By cthroop Date 2023-03-23 Time 07:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-28 Cont ID  
Sent By cthroop Date 2022-11-28 Time 16:28 Rev Time 0.00
Received By cthroop Date 2022-11-01 Time 05:38 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 3 Status F Date 2023-07-28 Cont ID  
Sent By cthroop Date 2023-07-28 Time 16:41 Rev Time 0.00
Received By cthroop Date 2023-07-28 Time 08:35 Sent To  
Notes
2023-07-28 10:19:133RD NFIP PLAN REVIEW
 FINISHED CONSTRUCTION ELEVATION CERTIFICATE:
 CORRECTIONS REQUIRED
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 1. LINES A9 B&C) SHOULD BE N/A PER EC INSTRUCTIONS.
 2. LINE A9 D) SHOULD BE NO.
 3. LINE C2 A) STATES TOP OF BOTTOM FLOOR IS 5.3 FEET.
 FINAL BOUNDARY LINE SURVEY STATES GARAGE FF EL. IS
 5.21. THESE ELEVATIONS MUST MATCH.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 2 Status F Date 2023-03-30 Cont ID  
Sent By cthroop Date 2023-03-30 Time 07:13 Rev Time 0.00
Received By cthroop Date 2023-03-29 Time 07:41 Sent To  
Notes
2023-03-29 13:09:512ND NFIP PLAN REVIEW
 FINISHED CONSTRUCTION ELEVATION CERTIFICATE:
 CORRECTIONS REQUIRED
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
  
 1. SECTIOIN A8 SHOULD BE FILLED OUT IN PLACE OF A9 (THE
 GARAGE IS THE BUILDING - NOT AN ATTACHED GARAGE)
  
 2. LINE A7 SHOULD BE 1A. (SOG)
  
 3. LINE A9B) STATES 3 OPENINGS. DATA SHOULD BE ENTERED
 ON LINE A8B) AND SHOULD BE 4 VENTS.
  
 4. LINE A9C) STATES 600 SQ IN. DATA SHOULD BE ENTERED
 ON LINE A8C) AND SHOULD BE 800 SQ IN.
  
 5. ADD PHOTO OF GARAGE DOOR ELEVATION.
 NOTE: PHOTOS FROM 1ST EC ARE MUCH BETTER.
  
 6. VALID DIGITAL SIGNATURE OF SURVEYOR IS REQUIRED.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2022-11-28 Cont ID  
Sent By cthroop Date 2022-11-28 Time 16:14 Rev Time 0.00
Received By cthroop Date 2022-11-28 Time 10:11 Sent To  
Notes
2022-11-28 10:38:111ST NFIP PLAN REVIEW
 FINISHED CONSTRUCTION ELEVATION CERTIFICATE:
 CORRECTIONS REQUIRED
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 1. ATTACH A COPY OF THE ICC-ES REPORT FOR THE SMART
 VENTS.
  
 2. LINE C2E) LOWEST ELEVATION OF MACHINERY... 7.1FT
 NAVD. MINIMUM ELEVATION SHALL BE 8'0"NAVD.
  
 3. LINE A8 SHOULD BE FILLED OUT IN PLACE OF A9 (THE
 GARAGE IS THE BUILDING - NOT AN ATTACHED GARAGE)
  
 4. LINE B9 = SHOULD BE 6 (THE BUILDING IN QUESTION IS
 IN AE 6)
  
 5. LINE C2(D) = SHOULD BE N/A ITS NOT THE ATTACHED
 GARAGE IT IS THE BUILDING.
  
 6. SECTION D = THE BOX THAT SAYS CHECK HERE IF
 ATTACHMENTS SHOULD BE CHECKED (THE SMART VENT DOCUMENTS
 WOULD BE THE ATTACHMENTS).
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-07-28 Cont ID  
Sent By cthroop Date 2023-07-28 Time 09:19 Rev Time 0.00
Received By cthroop Date 2023-07-28 Time 08:35 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2023-03-29 Cont ID  
Sent By cthroop Date 2023-03-29 Time 13:06 Rev Time 0.00
Received By cthroop Date 2023-03-29 Time 07:42 Sent To  
Notes
2023-03-29 13:07:39VALID SIGNATURE OF THE SURVEYOR IS REQUIRED. CT

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-28 Cont ID  
Sent By cthroop Date 2022-11-28 Time 10:10 Rev Time 0.00
Received By cthroop Date 2022-11-23 Time 17:10 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved