| 2022-10-28 14:13:30 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA NO. |
| | 15-0323.02 HAS EXPIRED AND IS NO LONGER VALID. PROVIDE |
| | A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED HIP & RIDGE METAL |
| | SYSTEM TO BE USED. ALL APPLICABLE DETAILS AND |
| | ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| | APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| | SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| | SITE-SPECIFIC ENGINEERING |
| | 2. FBC B 107.2.1. IF RE-ROOFING ENTIRE ROOF AS PER |
| | SUBMITTED ROOF DRAWING/SKETCH A SEPARATE PERMIT |
| | APPLICATION & DOCUMENTS ARE REQUIRED FOR 2058 TARPON |
| | LAKE WAY (NORTH SIDE OF ROOF). REVISE ROOF DRAWING TO |
| | CLEARLY IDENTIFY AREAS TO RECEIVE NEW ROOFING UNDER |
| | THIS PERMIT APPLICATION. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |