| Plan Review Stops For Permit 22100202 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2022-11-23 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-11-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-23 08:59:09 | FIRE PROVISO COMMENTS: | | | | | | (1) INSTALL, TEST, AND INSPECT PER NFPA 24, FOR THE | | | INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR | | | APPURTENANCES. | | | | | | (2) DO NOT COVER ANY JOINTS PRIOR TO FIRE DEPARTMENT | | | INSPECTION. | | | | | | C. WALKER | | | | | | 561-804-4762 | | | | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-11-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-07 09:19:31 | FIRE PROVISO COMMENTS: | | | | | | (1) INSTALL, TEST, AND INSPECT PER NFPA 24, FOR THE | | | INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR | | | APPURTENANCES. | | | | | | (2) DO NOT COVER ANY JOINTS PRIOR TO FIRE DEPARTMENT | | | INSPECTION. | | | | | | C. WALKER | | | | | | 561-804-4762 | | | | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
2022-11-01 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-11-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-01 12:23:25 | THE SUBMITTAL DID NOT INCLUDE DETAILS OF THE LOCATION | | | OF THE BACFLOW PREVENTER TO CONDUCT A PROPER REVIEW. | | | PLEASE CLARIFY IF THIS IS PART OF THE FIRE LINE THAT | | | MUST COMPLY WITH NFPA 24, CHAPTER 6, FOR LOCATION. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2022-10-27 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-10-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-27 11:36:04 | THE SUBMITTAL DID NOT HAVE BACKFLOW DOCUMENTATION. NFPA | | | 1, 1.14 | | | | | | C.WALKER | | | | | | 561-804-4762 | | | | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-11-29 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-11-22 |
Time |
06:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-11-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-11-03 |
Time |
06:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-11-02 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-11-02 |
Time |
07:02 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-10-31 |
Time |
16:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-10-27 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-27 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-10-12 |
Time |
08:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2022-10-26 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2022-10-26 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2022-10-26 |
Time |
09:18 |
Sent To |
|
|
| Notes |
| 2022-10-26 09:18:57 | PLUMBING REVIEW NOT REQUIRED FOR FIRE PUMP. |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
N |
Date |
2022-10-27 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-27 |
Time |
12:51 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-10-27 |
Time |
12:51 |
Sent To |
|
|
| Notes |
| 2022-10-27 12:52:48 | CONTRACTROR HAS STATED IN LETTER THAT THIS IS NOT UNDER | | | PRIVATE PROVDER FOR INSPECTIONS. | | | SEE FRONT SCREEN ATTACHMENT AND FILENET. |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
2 |
Status |
N |
Date |
2022-10-26 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2022-10-26 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2022-10-26 |
Time |
09:18 |
Sent To |
|
|
| Notes |
| 2022-10-26 09:18:39 | THIS IS NOT A BACKFLOW. | | | FIRE PUMP ONLY. |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
F |
Date |
2022-10-20 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-10-20 |
Time |
13:34 |
Rev Time |
|
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-10-20 13:34:47 | THERE ARE NO BACKFLOW DOCUMENTS. SEEMS LIKE THEY | | | ATTACHED FIRE PUMP ACCESSORIES INSTEAD OF BACKFLOW | | | ASSEMBLY SPEC SHEETS |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-11-29 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-11-28 |
Time |
10:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-11-17 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2022-11-17 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2022-11-17 |
Time |
08:13 |
Sent To |
|
|
| Notes |
| 2022-11-17 08:25:53 | | | | SIGNATURE REVIEW | | | 11/17/22 | | | | | | DENIED. | | | | | | 1) THE WATER AND WASTEWATER PLAN PREPARED BY FL. | | | LICENSED ENGINEER JESSE J. PARRISH DOES NOT BEAR A | | | VERIFIABLE DIGITAL SIGNATURE AND SEAL- FL. STATUTE | | | 471.025, AND SECTION 61G15-23.005 FAC. | | | | | | 2) SHEET FP-1A IS A COPY OF A PREVIOUSLY APPROVED AND | | | CITY STAMPED PLAN. ALL PLANS SUBMITTED FOR PERMITTING | | | AND PUBLIC RECORD WHICH ARE PREPARED BY A FL. LICENSED | | | ENGINEER SHALL BEAR THE VERIABLE DIGITAL SIGNATURE AND | | | SEAL OF THE ENGINEER. | | | FLORIDA BOARD OF PROFESSIONAL ENGINEERS GUIDELINES FOR | | | ELECTRONIC OR DIGITALLY SIGNED AND SEALED PLANS AND | | | DOCUMENTS. | | | A DIGITAL SIGNATURE MUST BE UNIQUE TO THE PROFESSIONAL | | | ENGINEER USING IT, OBTAINED FROM A THIRD-PARTY | | | CERTIFICATION AUTHORITY, AND CAPABLE OF VERIFICATION. | | | THE CERTIFICATION AUTHORITY WILL VET THE PE AND PROVIDE | | | A PASSWORD-PROTECTED DIGITAL SIGNATURE FILE. (FBPE DOES | | | NOT APPROVE OR PROVIDE A LIST OF AUTHORITIES.) | | | YOU MAY NOT USE THE DIGITAL OPTION PROVIDED IN ADOBE | | | ACROBAT, SINCE IT IS SELF-AUTHENTICATED AND DOES NOT | | | USE A THIRD PARTY. | | | YOUR DIGITAL SIGNATURE MUST BE LINKED TO THE DOCUMENT | | | IN SUCH A WAY THAT ANY CHANGE INVALIDATES THE SIGNATURE | | | AND DOCUMENT. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL/PLUMBING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|