| Plan Review Stops For Permit 22100182 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2023-01-25 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-25 |
Time |
09:55 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-25 |
Time |
09:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-22 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-22 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2022-12-22 10:40:40 | RAILING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) I NEED TO KNOW WHAT THE VIEW RAIL IS TO BE USED FOR | | | ( GUARD RAILING?) - PERHAPS A PHOTO OF THE EXISTING | | | AREA WOULD HELP. | | | | | | 2) FOR A GUARD RAIL - PLEASE SHOW THE PROPOSED HEIGHT. | | | FBC 1015.3 | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-11-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-16 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-16 |
Time |
15:07 |
Sent To |
|
|
| Notes |
| 2022-11-16 15:13:15 | RAILING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) BUILDING PERMIT APPLICATION SAYS HAND RAILS TO HANDI | | | CAP RAMP - THE DRAWINGS DO NOT COMPLY WITH HAND RAIL | | | REQUIREMENTS - FBC A 505 | | | | | | 2) NEED A BETTER SITE PLAN SHOWING THE LOCATION OF THE | | | PROPOSED RAILING. | | | | | | 3) HANDRAILS OR GUARD RAILS - PLEASE CLARIFY | | | | | | 4) FOR A GUARD RAIL - PLEASE SHOW THE PROPOSED HEIGHT. | | | FBC 1015.3 | | | | | | 5) THE SIGNED AND SEALED CALCULATIONS PROVIDED NEED TO | | | BE SIGNED DIGITALLY/ELECTRONICALLY BY THE DESIGNER TO | | | BE USED IN PROJECTDOX. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-12-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-12-22 |
Time |
10:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2022-10-11 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-10-11 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-10-11 |
Time |
13:19 |
Sent To |
|
|
| Notes |
| 2022-10-11 13:26:38 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THERE IS AN INDICATION OF NEW RAILINGS/GAURDS, | | | HOWEVER, THERE IS LIMITED DETAIL OF WHERE IT WILL BE | | | LOCATED AND HOW IT AFFECTS THE EXISTING LIFE SAFETY | | | PLAN. | | | | | | FOR THE OFFICIAL RECORD, PLEASE PROVIDE A GREATER | | | DETAILED LIFE SAFETY PLAN INDICATING WHAT IS EXISTING | | | AND WHAT IS BEING PROPOSED. | | | | | | | | | 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET | | | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE | | | ABOVE. | | | | | | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-01-25 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-25 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-24 |
Time |
15:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-22 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-21 |
Time |
16:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-16 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-11 |
Time |
05:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-01-25 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-25 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-25 |
Time |
09:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-12-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-22 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-22 |
Time |
10:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-11-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-16 |
Time |
15:20 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-16 |
Time |
15:20 |
Sent To |
|
|
| Notes |
| 2022-11-16 15:21:45 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) SIGNED AND SEALED CALCULATIONS PROVIDED DO NOT SHOW | | | AS DIGITALLY SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|