| Plan Review Stops For Permit 22091360 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:57 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-04-11 |
Time |
18:54 |
Sent To |
|
|
| Notes |
| 2023-04-11 18:57:20 | BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #22091360 (SIGN S8) | | | 1309 N FLAGLER DR | | | TENET GOOD SAMARITAN INC | | | | | | 1- ACCORDING TO SEC. 1609.4 FBC-BUILDING, THIS | | | BUILDING-IS LOCATED IN EXPOSURE "D" NOT "C". ENGINEER | | | OF RECORD TO REVISE CALCULATIONS AND DESIGN CRITERIA ON | | | DRAWINGS AS REQUIRED. | | | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND | | | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE | | | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2023-01-24 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-24 |
Time |
14:21 |
Sent To |
|
|
| Notes |
| 2023-01-24 14:22:08 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC B 1609, FBC 107, PROVIDE A STRUCTURAL DETAIL, | | | PREPARED BY AN ENGINEER, FOR THE PROPOSED SIGN. THIS | | | SHOULD INCLUDE WIND DESIGN CRITERIA, FS 471. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-11-19 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-11-19 |
Time |
19:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-11-16 |
Time |
16:37 |
Sent To |
|
|
| Notes |
| 2022-11-19 19:05:22 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC B 1609, FBC 107, PROPOSED INSTALLATION IS NOT | | | CLEAR. PROVIDE A DETAIL. THE PLAN REFERENCES FASTENERS. | | | THE PROPOSED INSTALLATION WILL BE EVALUATED TO | | | DETERMINE IF THIS SIGN, AS WELL AS THE OTHER SIGNS, ARE | | | CONSIDERED "FACE CHANGE" INSTALLATIONS. | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-25 |
Time |
16:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:58 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-03-22 |
Time |
07:48 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-01-24 |
Time |
14:22 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-12-27 |
Time |
08:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-11-29 |
Time |
12:14 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-10-04 |
Time |
09:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:58 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-04-11 |
Time |
18:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-02-21 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2023-02-21 |
Time |
16:29 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2023-02-21 |
Time |
16:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-11-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-11-19 |
Time |
19:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-11-19 |
Time |
19:07 |
Sent To |
|
|
| Notes |
| 2022-11-19 19:07:45 | PENDING BUILDING |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2023-05-01 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-05-01 |
Time |
16:18 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-05-01 |
Time |
16:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-04-06 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-04-06 |
Time |
17:28 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-04-06 |
Time |
17:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-01-19 |
Time |
09:03 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-01-19 |
Time |
09:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-11-29 |
Time |
11:58 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2022-11-29 |
Time |
11:56 |
Sent To |
|
|
| Notes |
|
|