| Plan Review Stops For Permit 22091356 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
07:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-25 |
Time |
07:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:34 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-04-11 |
Time |
18:14 |
Sent To |
|
|
| Notes |
| 2023-04-11 18:34:15 | BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #22091356 (SIGN S5) | | | 1309 N FLAGLER DR | | | TENET GOOD SAMARITAN INC | | | | | | 1- ACCORDING TO SEC. 1609.4 FBC-BUILDING, THIS | | | BUILDING-IS LOCATED IN EXPOSURE "D" NOT "C". ENGINEER | | | OF RECORD TO REVISE CALCULATIONS AND DESIGN CRITERIA ON | | | DRAWINGS AS REQUIRED. | | | | | | WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE | | | ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND | | | HOW THE COMMENT WAS ADDRESSED WILL HELP TO EXPEDITE THE | | | REVIEW PROCESS. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2023-01-24 |
Time |
16:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-24 |
Time |
16:19 |
Sent To |
|
|
| Notes |
| 2023-01-24 16:21:57 | FS471, IT IS NOT CLEAR WHO THE ENGINEER OF RECORD IS | | | FOR THIS PROJECT. | | | | | | RICHARD WASILEWSKI, PE SIGNED AND SEALED THE DRAWNG | | | WHICH LACKS WIND DESIGN CRITERIA. | | | CHRISTIAN LANGLEY, PE SIGNED AND SEALED CALCULATIONS. | | | | | | THERE SHOULD BE ONE ENGINEER OF RECORD. IF THERE WILL | | | BE MULTIPLE, PLEASE HAVE THEM BOTH SUBMIT A SIGNED AND | | | SEALED LETTER EXPLAINING WHY THIS SIGN PERMIT NEEDS TWO | | | DIFFERENT STRUCTURAL ENGINEERS. IN THAT EVENT EXPLAIN | | | WHO IS ENGINEER OF RECORD, WHO IS THE DELEGATED | | | ENGINEER, AND WHAT IS BEING DELEGATED. | | | | | | REVISE THE PLAN TO INCLUDE WIND DESIGN CRITERIA FBC B | | | 1609. | | | | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2022-11-16 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-11-16 |
Time |
16:06 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-11-16 |
Time |
16:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2023-05-10 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-05-10 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-05-10 |
Time |
10:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2023-01-06 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-01-06 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-01-06 |
Time |
14:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-10-24 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-10-24 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-10-24 |
Time |
10:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
08:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-04-25 |
Time |
16:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:35 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-03-22 |
Time |
07:36 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-01-24 |
Time |
16:22 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-12-29 |
Time |
12:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-11-29 |
Time |
11:07 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-10-04 |
Time |
09:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2023-05-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2023-05-25 |
Time |
07:59 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2023-05-25 |
Time |
07:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-04-11 |
Time |
18:35 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-04-11 |
Time |
18:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2023-01-06 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2023-01-06 |
Time |
15:05 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2023-01-06 |
Time |
15:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-10-24 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-10-24 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-10-24 |
Time |
10:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2023-05-01 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-05-01 |
Time |
15:58 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-05-01 |
Time |
15:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-04-06 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-04-06 |
Time |
17:17 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-04-06 |
Time |
17:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-01-23 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-01-23 |
Time |
11:58 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-01-23 |
Time |
11:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-11-28 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-11-28 |
Time |
17:35 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2022-11-28 |
Time |
17:10 |
Sent To |
|
|
| Notes |
| 2022-11-28 17:36:32 | FAILED | | | | | | 1) PROVIDE A RECENT SURVEY OF THE PROPERTY. THE SITE | | | PLAN THAT WAS PROVIDED DOES NOT MATCH THE SITE LAYOUT | | | AND THUS NOT ALL OF THE SIGN LOCATIONS REFLECT | | | LOCATIONS WHERE THEY CAN BE INSTALLED. | | | | | | 2) WHILE THE PROVIDED SITE PLAN IS NOT ACCURATE, IT | | | APPEARS THAT THIS SIGN IS 27C ON THE APPROVED GOOD | | | SAMARITAN MASTER SIGN PLAN. IN ACCORDANCE WITH THE SIGN | | | PLAN, YOU MUST VERIFY THAT IT IS WITHIN FIVE FEET OF | | | ITS CURRENT LOCATION. | | | | | | 3) SIGN TYPE C IS A LOW FREESTANDING TENANT SIGN AND IS | | | ONLY PERMITTED TO BE 6 FEET IN WIDTH AND HAVE A MAXIMUM | | | TOTAL AREA PER FACE OF 60 SQUARE FEET. NEITHER OF THESE | | | STANDARDS IS MET WITH THE PROPOSED SIGN. | | | | | | 4) PLEASE PROVIDE HOW THIS SIGN IS TO BE ILLUMINATED. | | | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | | [email protected] | | | |
|
|