| Plan Review Stops For Permit 22091353 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2023-02-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-20 |
Time |
18:31 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-20 |
Time |
18:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2023-01-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-01-04 |
Time |
07:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-04 |
Time |
07:40 |
Sent To |
|
|
| Notes |
| 2023-01-04 07:40:28 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC B 1609, PROVIDE A STRUCTURAL DETAIL FOR THE | | | PROPOSED SIGN INSTALLATION, INCLUDING WIND DESIGN | | | CRITIERA. ENGINEERING IS REQUIRED AS THERE IS NO | | | EXCEPTION TO ENGINEERING FOR COMMERCIAL PROJECTS PER | | | FLORIDA STATUTE 471. | | | | | | NOTE THAT THE DETAIL PROVIDED LACKS COMPLETE STRUCTURAL | | | INFORMATION - WIND DESIGN CRITERIA, FASTENING PATTERN, | | | FASTENER LENGTH. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-11-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-11-19 |
Time |
19:10 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-11-16 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2022-11-19 19:11:10 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC B 1609, FBC 107, PROPOSED INSTALLATION IS NOT | | | CLEAR. PROVIDE A DETAIL. THE PLAN REFERENCES FASTENERS. | | | THE PROPOSED INSTALLATION WILL BE EVALUATED TO | | | DETERMINE IF THIS SIGN, AS WELL AS THE OTHER SIGNS, ARE | | | CONSIDERED "FACE CHANGE" INSTALLATIONS. | | | | | | | | | | | 2022-11-16 16:41:02 | PENDING DETAIL FROM APPLICANT |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-02-22 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-02-22 |
Time |
12:58 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-27 |
Time |
16:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-19 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-01-19 |
Time |
09:06 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-12-27 |
Time |
07:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-11-29 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-10-04 |
Time |
09:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-02-20 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-02-20 |
Time |
18:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-02-20 |
Time |
18:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2023-01-04 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2023-01-04 |
Time |
07:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2023-01-04 |
Time |
07:40 |
Sent To |
|
|
| Notes |
| 2023-01-04 07:40:46 | SEE BUILDING REVIEW | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-11-19 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-11-19 |
Time |
19:11 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-11-19 |
Time |
19:11 |
Sent To |
|
|
| Notes |
| 2022-11-19 19:11:32 | PENDING BUILDING |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-02-21 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-02-21 |
Time |
18:33 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2023-02-21 |
Time |
18:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2023-01-18 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-01-18 |
Time |
16:27 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2023-01-18 |
Time |
16:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-11-29 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-11-29 |
Time |
12:06 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2022-11-29 |
Time |
12:02 |
Sent To |
|
|
| Notes |
|
|