Plan Review Details - Permit 22091234
Plan Review Stops For Permit 22091234
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-01 Cont ID  
Sent By shill Date 2023-03-01 Time 16:09 Rev Time 0.00
Received By shill Date 2023-03-01 Time 16:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-11-16 Cont ID  
Sent By shill Date 2022-11-16 Time 16:02 Rev Time 0.00
Received By shill Date 2022-11-16 Time 16:02 Sent To  
Notes
2022-11-16 16:02:40FS471, THIS ENGINEER HAS A DIGITAL SIGNATURE. UPLOAD
 DIGITALLY SIGNED PLANS.
  
 [email protected]
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-02-14 Cont ID  
Sent By fgiaquin Date 2023-02-14 Time 22:51 Rev Time 0.00
Received By fgiaquin Date 2023-02-14 Time 22:39 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-10-18 Cont ID  
Sent By fgiaquin Date 2022-10-18 Time 18:41 Rev Time 0.00
Received By fgiaquin Date 2022-10-18 Time 18:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-01 Cont ID  
Sent By shill Date 2023-03-01 Time 16:09 Rev Time 0.00
Received By shill Date 2023-02-09 Time 08:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-17 Cont ID  
Sent By vbroglia Date 2022-11-17 Time 13:29 Rev Time 0.00
Received By vbroglia Date 2022-09-30 Time 11:32 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-03-01 Cont ID  
Sent By shill Date 2023-03-01 Time 16:09 Rev Time 0.00
Received By shill Date 2023-03-01 Time 16:09 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-10-06 Cont ID  
Sent By pvalenti Date 2022-10-06 Time 07:54 Rev Time 0.00
Received By pvalenti Date 2022-10-06 Time 07:52 Sent To  
Notes
2022-10-06 07:59:55SIGNATURE REVIEW DENIED:
  
 THE SUBMITTE PAPER CALCULATIONS AND SIGN PLAN ARE
 ENGINEER SEALED BUT NOT SIGNED BY ENGINEER. THESE
 DOCUMENTS NEED TO BE SIGNED/SEALED AND RE-SUBMITTED.
  
 FS 471/FS 481 DOCUMENTS PREPARED BY AN
 ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE
 TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A
 SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL.
 UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY
 VERIFIED) PLAN:
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER II
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 FEEL FREE TO CONTACT ME AT 561 805 6673.
  

Review Stop Z ZONING
Rev No 2 Status P Date 2023-02-22 Cont ID  
Sent By vbroglia Date 2023-02-22 Time 11:18 Rev Time 0.00
Received By vbroglia Date 2023-02-22 Time 11:18 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-11-17 Cont ID  
Sent By vbroglia Date 2022-11-17 Time 13:26 Rev Time 0.00
Received By vbroglia Date 2022-11-17 Time 13:26 Sent To  
Notes
2022-11-17 13:29:1811/17/2022 FAILED
  
 PLEASE PROVIDE PHOTOS OF THE FOUR SIDES OF THE
 BUILDING. THE SIGN CODE ALLOWS ONE SIGN PER BUSINESS
 PLUS 2 ADDITIONAL. THE PHOTO IS TO VERIFY THAT THIS
 REQUIREMENT IS MET.
  
 PLEASE PROVIDE THE HIEGHT OF THE BUILDING FACAD FOR
 STAFF TO MEASURE ACCURATLY THE TOTAL AMOUNT OF SIGNAGE
 PERMITTED PER AREA.
  
 **** REVIEWD BY ****
 VALENTINA BROGLIA
 ASSOCIATE PLANNER
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved