Plan Review Details - Permit 22091105
Plan Review Stops For Permit 22091105
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-11-18 Cont ID  
Sent By rmcdouga Date 2022-11-18 Time 13:25 Rev Time 0.00
Received By rmcdouga Date 2022-11-18 Time 13:25 Sent To  
Notes
2022-11-18 13:27:16THE FIRST B REVIEW STOP IS LOCKED BY C. COLE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date   Cont ID  
Sent By rmcdouga Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-11-29 Cont ID  
Sent By jleahy Date 2022-11-29 Time 08:46 Rev Time 0.00
Received By jleahy Date 2022-11-29 Time 08:39 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-11-03 Cont ID  
Sent By pleduc Date 2022-11-03 Time   Rev Time 0.00
Received By pleduc Date 2022-10-31 Time 12:11 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-11-16 Cont ID  
Sent By ccole Date 2022-11-16 Time 17:31 Rev Time 0.00
Received By ccole Date 2022-11-04 Time 16:12 Sent To  
Notes
2022-11-16 17:32:05NO GAS REVISIONS SUBMITTED.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-29 Cont ID  
Sent By medwards Date 2022-12-29 Time 11:18 Rev Time 0.00
Received By medwards Date 2022-12-15 Time 08:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-30 Cont ID  
Sent By lmarchan Date 2022-11-30 Time 08:42 Rev Time 0.00
Received By lmarchan Date 2022-10-29 Time 09:22 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-11-15 Cont ID  
Sent By medwards Date 2022-11-15 Time 05:55 Rev Time 0.00
Received By medwards Date 2022-11-15 Time 05:55 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-11-16 Cont ID  
Sent By ccole Date 2022-11-16 Time 17:25 Rev Time 0.00
Received By ccole Date 2022-11-04 Time 15:28 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-12-29 Cont ID  
Sent By medwards Date 2022-12-29 Time 11:18 Rev Time 0.00
Received By medwards Date 2022-12-29 Time 11:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-17 Cont ID  
Sent By rwbrown Date 2022-11-17 Time 09:12 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
2022-11-15 05:56:01MECHANICAL DIGITAL SIGNATURES APPROVED ME

Review Stop Z ZONING
Rev No 2 Status P Date 2022-12-28 Cont ID  
Sent By ckimmerl Date 2022-12-28 Time 15:27 Rev Time 0.00
Received By ckimmerl Date 2022-12-28 Time 15:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-11-21 Cont ID  
Sent By ckimmere Date 2022-11-21 Time 16:06 Rev Time 0.00
Received By ckimmerl Date 2022-11-21 Time 15:58 Sent To  
Notes
2022-11-21 16:06:11APPROVED PLANS FOR FORMAL SITE PLAN REVIEW 15-06A
 FROM10.26.20 ON SHEET L0-001 SHOWS THE PRIVATE OPEN
 SPACE PROVIDING A TOTAL OF 3,022 SF WITH 926 SF OF
 VEGETATED AREA, AND 1000SF OF TREE CANOPY.
 THIS MET THE SPACES REQUIRED 30% VEGETATED AREA (907
 SF) AND THE 20% TREE CANOPY (605SF),
  
 1. PLEASE PROVIDE THE CALCULATIONS WITHIN A TABLE AND
 ILLUSTRATE THAT THIS SPACE MEETS THE REQUIREMENTS FOR
 AREA, VEGETATION, AND CANOPY.
  
 PROPOSAL IN THIS APPLICATION ONLY SEEMS TO SHOW APPROX.
 706SF OF VEGETATED AREA.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 822-1426 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved