| Plan Review Stops For Permit 22090270 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2022-10-04 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-10-04 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-10-04 |
Time |
09:26 |
Sent To |
|
|
| Notes |
| 2022-10-04 09:27:09 | ADDRESS APPROPRIATE FOR PROJECT. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-09 |
Time |
16:25 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-09 |
Time |
16:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-21 |
Time |
10:35 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-21 |
Time |
10:35 |
Sent To |
|
|
| Notes |
| 2022-12-21 10:37:45 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD FBC 107.3.4 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-07 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-07 |
Time |
11:59 |
Sent To |
|
|
| Notes |
| 2022-11-07 14:48:13 | NEW SFR | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, DOORS AND | | | ROOFING SYSTEM. ALL PRODUCT APPROVALS NEED TO BE | | | REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER | | | OF RECORD FBC 107.3.4 | | | | | | 2) PLEASE SHOW THE DOOR FROM THE LIVING SPACE TO THE | | | GARAGE TO COMPLY WITH FBC R302.5.1 OPENING PROTECTION. | | | OPENINGS FROM A PRIVATE GARAGE DIRECTLY INTO A ROOM | | | USED FOR SLEEPING PURPOSES SHALL NOT BE PERMITTED. | | | OTHER OPENINGS BETWEEN THE GARAGE AND RESIDENCE SHALL | | | BE EQUIPPED WITH SOLID WOOD DOORS NOT LESS THAN 1 3/8 | | | INCHES (35 MM) IN THICKNESS, SOLID OR HONEYCOMBCORE | | | STEEL DOORS NOT LESS THAN 13/8 INCHES (35 MM) THICK, OR | | | 20-MINUTE FIRE-RATED DOORS. | | | | | | 3) ONE BATHROOM NEEDS A 29 INCH CLEAR OPENING - A 30 | | | INCH WIDE DOOR DOES NOT ALLOW A CLEAR OPENING OF 29 | | | INCHES CLEAR OPENINGS OF DOORWAYS WITH SWINGING DOORS | | | SHALL BE MEASURED BETWEEN THE FACE OF THE DOOR AND THE | | | STOP, WITH THE DOOR OPEN 90 DEGREES. FBC R320.1.1 | | | ALL NEW SINGLE-FAMILY HOUSES, DUPLEXES, TRIPLEXES, | | | CONDOMINIUMS AND TOWNHOUSES SHALL PROVIDE AT LEAST ONE | | | BATHROOM, LOCATED WITH MAXIMUM POSSIBLE PRIVACY, WHERE | | | BATHROOMS ARE PROVIDED ON HABITABLE GRADE LEVELS, WITH | | | A DOOR THAT HAS A 29-INCH (737 MM) CLEAR OPENING. | | | HOWEVER, IF ONLY A TOILET ROOM IS PROVIDED AT GRADE | | | LEVEL, SUCH TOILET ROOMS SHALL HAVE A CLEAR OPENING OF | | | NOT LESS THAN 29 INCHES (737 MM). | | | | | | 4) PLEASE PROVIDE A SURVEY. | | | | | | 5) THE SOIL REPORT PROVIDED NEEDS TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE DESIGNER TO BE | | | USED IN PROJECTDOX. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-10-20 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2022-10-20 |
Time |
08:56 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2022-10-20 |
Time |
08:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-09 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-05 |
Time |
08:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-12-27 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-12-27 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-12-20 |
Time |
09:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-07 |
Time |
14:55 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-03 |
Time |
05:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2023-01-17 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-01-17 |
Time |
12:09 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-17 |
Time |
12:09 |
Sent To |
|
|
| Notes |
| 2023-01-13 11:22:10 | RECEIPT MU-2023-001246 - $1945.04 PAID | | 2023-01-09 16:35:26 | 1/9/23 EMAILED IMPACT OFFICE TO REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-07 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-07 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2022-11-07 14:49:10 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | | | | UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE | | | RECEIPT TO YOUR PROJECT OR EMAIL IT TO | | | [email protected] . | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2022-12-27 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-12-27 |
Time |
10:30 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-12-27 |
Time |
10:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2022-10-18 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-10-18 |
Time |
08:16 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-10-18 |
Time |
08:16 |
Sent To |
|
|
| Notes |
| 2022-10-18 08:17:06 | 1ST REVIEW FMC | | | PERMIT: 22090270 | | | | | | CODES IN EFFECT: 2020 | | | | | | FBC- FLORIDA BUILDING CODE | | | FMC- FLORIDA MECHANICAL CODE | | | FEC- FLORIDA ENERGY CONSERVATION | | | FGC- FLORIDA FUEL GAS | | | FEX- FLORIDA EXISTING BUILDING CODE | | | FRC- FLORIDA RESIDENTIAL BUILDING CODE | | | F.S.- FLORIDA STATUTES | | | FAC- FLORIDA ACCESSIBILITY CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) PROVIDE THE ENERGY CALCULATIONS. FEC R101.5.1.1.1 | | | | | | 2) PROVIDE THE MECHANICAL EQUIPMENT SIZING | | | CALCULATIONS. FEC R403.7.1 | | | | | | 3) PROVIDE A MECHANICAL DRAWING THAT IS CLEAR. THE | | | MECHANICAL DESIGN ON THE DRAWING SUBMITTED IS BLURRY | | | AND NOT READABLE. FBC 107.3.5 | | | | | | 4) PROVIDE THE TERMINATION LOCATION, SIZE AND MATERIAL | | | OF THE CONDENSATE DRAIN. FRC M1411.3 | | | | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM. | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-12-27 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-12-27 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-10-10 |
|
|
Cont ID |
|
| Sent By |
rwbrown |
Date |
2022-10-10 |
Time |
13:59 |
Rev Time |
0.00 |
| Received By |
rwbrown |
Date |
2022-10-10 |
Time |
13:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-09 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-09 |
Time |
16:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-21 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-21 |
Time |
10:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-07 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-07 |
Time |
14:49 |
Sent To |
|
|
| Notes |
| 2022-11-07 14:49:40 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-21 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-21 |
Time |
10:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-11-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-11-07 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-11-07 |
Time |
14:53 |
Sent To |
|
|
| Notes |
| 2022-11-07 14:54:52 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE SOIL REPORT PROVIDED DOES NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | | | 2022-10-20 09:41:32 | ELECTRICAL PLAN CREATED BY GENERAL CONTRACTOR PASSED | | | SIGNATURE AS PER EXEMPTIONS SS 481.229 | | 2022-10-10 14:00:24 | PLUMBING PAGE SIGNED BY CONTRACTOR |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-10-13 |
|
|
Cont ID |
|
| Sent By |
asangele |
Date |
2022-10-13 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
asangele |
Date |
2022-10-13 |
Time |
15:13 |
Sent To |
|
|
| Notes |
|
|