| Plan Review Stops For Permit 22090153 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-09 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-09 |
Time |
08:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2022-12-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-07 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-07 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2022-12-07 08:21:36 | MOCK UP | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1- SHEETS 200, 400, 401 AND 402 DON'T HAVE ENGINEER'S | | | SEAL/SIGNATURE. EACH DRAWING NEEDS TO HAVE THE | | | SEAL/SIGNATURE. SEC. 61G-23.00 | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-28 |
Time |
09:00 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-28 |
Time |
09:00 |
Sent To |
|
|
| Notes |
| 2022-10-28 09:02:15 | MOCK UP WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE "VISUAL MOCK-UP SHOP DRAWING" NEEDS TO BE | | | DIGITALLY/ ELECTRONICALLY SIGNED BY THE ENGINEER. | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | | | | 2) ON THE "VISUAL MOCK-UP SHOP DRAWING" PLEASE SHOW THE | | | WIND DESIGN CRITERIA PER FBC 1603.1.4 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-03 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-03 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2022-10-03 15:58:20 | MOCK UP WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE "VISUAL MOCK-UP SHOP DRAWING" NEEDS TO BE SIGNED | | | AND SEALED BY THE ENGINEER WHO DESIGNED IT. FBC WPB | | | 107.1 | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | | | | 2) ON THE "VISUAL MOCK-UP SHOP DRAWING" PLEASE SHOW THE | | | WIND DESIGN CRITERIA PER FBC 1603.1.4 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-09-20 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-20 |
Time |
08:59 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-20 |
Time |
08:59 |
Sent To |
|
|
| Notes |
| 2022-09-20 09:02:54 | MOCK UP WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS NEED TO BE DIGITALLY / ELECTRONICALLY | | | SIGNED BY THE DESIGNER - SIGNED AND SEALED DRAWINGS IN | | | PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED | | | TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE). OR - PROVIDE THE COMPLETE MIAMI DADE OR | | | FLORIDA STATE PRODUCT APPROVAL (FRONT PAGES ARE | | | MISSING) | | | | | | 2) PLEASE PROVIDE THE REQUIRED WIND DESIGN PRESSURES | | | FOR THE LOCATION OF THE WINDOWS - FBC 1609.1.1 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-09-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-08 |
Time |
08:48 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-08 |
Time |
08:48 |
Sent To |
|
|
| Notes |
| 2022-09-08 09:01:42 | MOCK UP WINDOWS | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWINGS NEED TO BE DIGITALLY / ELECTRONICALLY | | | SIGNED BY THE DESIGNER - SIGNED AND SEALED DRAWINGS IN | | | PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED | | | TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE). | | | | | | 2) PLEASE PROVIDE THE REQUIRED WIND DESIGN PRESSURES | | | FOR THE LOCATION OF THE WINDOWS - FBC 1609.1.1 | | | | | | 3) SHOP DRAWINGS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE DESIGNER OF RECORD - FBC WPB 107.3.4 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2023-01-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2023-01-09 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2023-01-06 |
Time |
08:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-12-07 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-12-07 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-12-06 |
Time |
16:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-28 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-26 |
Time |
15:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-03 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-02 |
Time |
08:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-09-20 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-20 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-19 |
Time |
07:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-09-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-08 |
Time |
09:01 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-07 |
Time |
05:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
6 |
Status |
P |
Date |
2023-01-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2023-01-06 |
Time |
18:31 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2023-01-06 |
Time |
18:31 |
Sent To |
|
|
| Notes |
| 2023-01-06 18:31:48 | HARD COPY DRAWINGS OF VISUAL MOCK-UP SHOP DRAWINGS: | | | 1- SHEETS 000, 200, 400, 401 AND 402 HAVE ENGINEER'S | | | SEAL AND WET SIGNATURE ON 12-9-22. JG |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
F |
Date |
2022-12-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-12-06 |
Time |
18:22 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-12-06 |
Time |
18:22 |
Sent To |
|
|
| Notes |
| 2022-12-06 18:22:25 | HARD COPY DRAWINGS OF VISUAL MOCK-UP SHOP DRAWINGS: | | | 1- SHEETS 200, 400, 401 AND 402 DON'T HAVE ENGINEER'S | | | SEAL/SIGNATURE. EACH DRAWING NEEDS TO HAVE THE | | | SEAL/SIGNATURE. SEC. 61G-23.001. | | | | | | NOTE: HARD COPY OF INSTALLATION ANALYSIS HAS ENGINEER'S | | | SEAL AND WET SIGNATURE. JG. | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-10-28 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-28 |
Time |
09:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-28 |
Time |
09:02 |
Sent To |
|
|
| Notes |
| 2022-10-28 09:02:42 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-10-03 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-10-03 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2022-10-03 15:59:54 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2022-09-20 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-20 |
Time |
09:06 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-20 |
Time |
09:06 |
Sent To |
|
|
| Notes |
| 2022-09-20 09:07:11 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-09-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-09-08 |
Time |
09:01 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-09-08 |
Time |
09:01 |
Sent To |
|
|
| Notes |
| 2022-09-08 09:02:26 | SEE BUILDING PLAN REVIEW |
|
|