Plan Review Details - Permit 22090153
Plan Review Stops For Permit 22090153
Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2023-01-09 Cont ID  
Sent By rmcphers Date 2023-01-09 Time 08:54 Rev Time 0.00
Received By rmcphers Date 2023-01-09 Time 08:54 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2022-12-07 Cont ID  
Sent By rmcphers Date 2022-12-07 Time 08:19 Rev Time 0.00
Received By rmcphers Date 2022-12-07 Time 08:19 Sent To  
Notes
2022-12-07 08:21:36MOCK UP
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1- SHEETS 200, 400, 401 AND 402 DON'T HAVE ENGINEER'S
 SEAL/SIGNATURE. EACH DRAWING NEEDS TO HAVE THE
 SEAL/SIGNATURE. SEC. 61G-23.00
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2022-10-28 Cont ID  
Sent By rmcphers Date 2022-10-28 Time 09:00 Rev Time 0.00
Received By rmcphers Date 2022-10-28 Time 09:00 Sent To  
Notes
2022-10-28 09:02:15MOCK UP WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE "VISUAL MOCK-UP SHOP DRAWING" NEEDS TO BE
 DIGITALLY/ ELECTRONICALLY SIGNED BY THE ENGINEER.
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  
 2) ON THE "VISUAL MOCK-UP SHOP DRAWING" PLEASE SHOW THE
 WIND DESIGN CRITERIA PER FBC 1603.1.4
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2022-10-03 Cont ID  
Sent By rmcphers Date 2022-10-03 Time 15:59 Rev Time 0.00
Received By rmcphers Date 2022-10-03 Time 15:45 Sent To  
Notes
2022-10-03 15:58:20MOCK UP WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE "VISUAL MOCK-UP SHOP DRAWING" NEEDS TO BE SIGNED
 AND SEALED BY THE ENGINEER WHO DESIGNED IT. FBC WPB
 107.1
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  
 2) ON THE "VISUAL MOCK-UP SHOP DRAWING" PLEASE SHOW THE
 WIND DESIGN CRITERIA PER FBC 1603.1.4
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 08:59 Rev Time 0.00
Received By rmcphers Date 2022-09-20 Time 08:59 Sent To  
Notes
2022-09-20 09:02:54MOCK UP WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS NEED TO BE DIGITALLY / ELECTRONICALLY
 SIGNED BY THE DESIGNER - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE). OR - PROVIDE THE COMPLETE MIAMI DADE OR
 FLORIDA STATE PRODUCT APPROVAL (FRONT PAGES ARE
 MISSING)
  
 2) PLEASE PROVIDE THE REQUIRED WIND DESIGN PRESSURES
 FOR THE LOCATION OF THE WINDOWS - FBC 1609.1.1
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-08 Cont ID  
Sent By rmcphers Date 2022-09-08 Time 08:48 Rev Time 0.00
Received By rmcphers Date 2022-09-08 Time 08:48 Sent To  
Notes
2022-09-08 09:01:42MOCK UP WINDOWS
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS NEED TO BE DIGITALLY / ELECTRONICALLY
 SIGNED BY THE DESIGNER - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).
  
 2) PLEASE PROVIDE THE REQUIRED WIND DESIGN PRESSURES
 FOR THE LOCATION OF THE WINDOWS - FBC 1609.1.1
  
 3) SHOP DRAWINGS NEED TO BE REVIEWED AND MARKED
 APPROVED BY THE DESIGNER OF RECORD - FBC WPB 107.3.4

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2023-01-09 Cont ID  
Sent By rmcphers Date 2023-01-09 Time 08:54 Rev Time 0.00
Received By rmcphers Date 2023-01-06 Time 08:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2022-12-07 Cont ID  
Sent By rmcphers Date 2022-12-07 Time 08:23 Rev Time 0.00
Received By rmcphers Date 2022-12-06 Time 16:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-10-28 Cont ID  
Sent By rmcphers Date 2022-10-28 Time 09:02 Rev Time 0.00
Received By rmcphers Date 2022-10-26 Time 15:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-10-03 Cont ID  
Sent By rmcphers Date 2022-10-03 Time 15:59 Rev Time 0.00
Received By rmcphers Date 2022-10-02 Time 08:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 09:07 Rev Time 0.00
Received By rmcphers Date 2022-09-19 Time 07:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-08 Cont ID  
Sent By rmcphers Date 2022-09-08 Time 09:01 Rev Time 0.00
Received By rmcphers Date 2022-09-07 Time 05:31 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 6 Status P Date 2023-01-06 Cont ID  
Sent By jgomez Date 2023-01-06 Time 18:31 Rev Time 0.00
Received By jgomez Date 2023-01-06 Time 18:31 Sent To  
Notes
2023-01-06 18:31:48HARD COPY DRAWINGS OF VISUAL MOCK-UP SHOP DRAWINGS:
 1- SHEETS 000, 200, 400, 401 AND 402 HAVE ENGINEER'S
 SEAL AND WET SIGNATURE ON 12-9-22. JG

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 5 Status F Date 2022-12-06 Cont ID  
Sent By jgomez Date 2022-12-06 Time 18:22 Rev Time 0.00
Received By jgomez Date 2022-12-06 Time 18:22 Sent To  
Notes
2022-12-06 18:22:25HARD COPY DRAWINGS OF VISUAL MOCK-UP SHOP DRAWINGS:
 1- SHEETS 200, 400, 401 AND 402 DON'T HAVE ENGINEER'S
 SEAL/SIGNATURE. EACH DRAWING NEEDS TO HAVE THE
 SEAL/SIGNATURE. SEC. 61G-23.001.
  
 NOTE: HARD COPY OF INSTALLATION ANALYSIS HAS ENGINEER'S
 SEAL AND WET SIGNATURE. JG.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2022-10-28 Cont ID  
Sent By rmcphers Date 2022-10-28 Time 09:02 Rev Time 0.00
Received By rmcphers Date 2022-10-28 Time 09:02 Sent To  
Notes
2022-10-28 09:02:42SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2022-10-03 Cont ID  
Sent By rmcphers Date 2022-10-03 Time 15:59 Rev Time 0.00
Received By rmcphers Date 2022-10-03 Time 15:59 Sent To  
Notes
2022-10-03 15:59:54SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 09:06 Rev Time 0.00
Received By rmcphers Date 2022-09-20 Time 09:06 Sent To  
Notes
2022-09-20 09:07:11SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-09-08 Cont ID  
Sent By rmcphers Date 2022-09-08 Time 09:01 Rev Time 0.00
Received By rmcphers Date 2022-09-08 Time 09:01 Sent To  
Notes
2022-09-08 09:02:26SEE BUILDING PLAN REVIEW