Plan Review Details - Permit 22081236
Plan Review Stops For Permit 22081236
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-09-29 Cont ID  
Sent By cpuell Date 2022-09-29 Time 09:37 Rev Time 0.00
Received By cpuell Date 2022-09-29 Time 09:37 Sent To  
Notes
2022-09-29 09:38:04THE SOUTH BUILDING GIVEN THE ADDRESS OF 244 9TH ST

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-09-01 Cont ID  
Sent By cpuell Date 2022-09-01 Time 15:14 Rev Time 0.00
Received By cpuell Date 2022-09-01 Time 15:14 Sent To  
Notes
2022-09-01 15:16:33DEMO IS FOR THE NORTH BUILDING. THE SOUTH BUILDING IS A
 GARAGE APARTMENT AND NEEDS TO BE ASSIGNED AN ADDRESSES.
 PLEASE HAVE THE OWNER CONTACT [email protected] OR
 CALL 561-805-6659 TO ASSIGN AN ADDRESS FOR THE SOUTH
 BUILDING.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-11-15 Cont ID  
Sent By cthroop Date 2022-11-15 Time 14:22 Rev Time 0.00
Received By cthroop Date 2022-11-15 Time 13:28 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-09-17 Cont ID  
Sent By cthroop Date 2022-09-17 Time 08:04 Rev Time 0.00
Received By cthroop Date 2022-09-17 Time 07:42 Sent To  
Notes
2022-09-17 08:05:30SEE COMMENTS UNDER BUILDING REVIEW CHECKLIST. CT

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-11-15 Cont ID  
Sent By cthroop Date 2022-11-15 Time 14:22 Rev Time 0.00
Received By cthroop Date 2022-11-15 Time 13:28 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-17 Cont ID  
Sent By cthroop Date 2022-09-17 Time 08:13 Rev Time 0.00
Received By cthroop Date 2022-09-17 Time 07:42 Sent To  
Notes
2022-09-17 08:22:341ST BUILDING DEMO REVIEW
 RESULTS: CORRECTIONS NEEDED
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NFPA 70 2017 EDITION NEC 2017
  
  
 ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT:
  
  
 DEMO CHECKLIST-ENTIRE STRUCTURE
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. COMPLETE
  
 2. COMPLETE
  
 3. COMPLETE
  
 4. COMPLETE
  
 5.COMPLETE
  
 6. COMPLETE
  
 7. COMPLETE
  
 8. COMPLETE
  
 9. COMPLETE
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-09-28 Cont ID  
Sent By RROSSANO Date 2022-09-28 Time   Rev Time 0.00
Received By rrossano Date 2022-09-28 Time   Sent To  
Notes
2022-09-28 16:54:54PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-09-08 Cont ID  
Sent By sberglun Date 2022-09-08 Time 09:30 Rev Time 0.00
Received By sberglun Date 2022-09-08 Time 09:27 Sent To  
Notes
2022-09-08 09:30:011) THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 THIS PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. INFORMATION CAN BE
 FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 2) PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS
 REQUIRED BY BUILDING DEPT. - STORMWATER POLLUTION
 PREVENTION PLAN, AND UTILITY SIGNOFFS - WATER/SEWER,
 PEST, FPL, FPU, ASBESTOS ETC. NO UTILITY SIGN-OFFS WERE
 INCLUDED WITH THIS SUBMITTAL, AND WILL BE REQUIRED
 PRIOR TO ENGINEERING SIGN-OFF.
  
 3) TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 4) ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-09-16 Cont ID  
Sent By amhamilt Date 2022-09-16 Time 16:49 Rev Time 0.00
Received By amhamilt Date 2022-09-16 Time 16:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-11-17 Cont ID  
Sent By cthroop Date 2022-11-17 Time 13:24 Rev Time 0.00
Received By cthroop Date 2022-11-14 Time 16:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-22 Cont ID  
Sent By cthroop Date 2022-09-22 Time 14:15 Rev Time 0.00
Received By cthroop Date 2022-09-01 Time 14:34 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-09-17 Cont ID  
Sent By cthroop Date 2022-09-17 Time 08:05 Rev Time 0.00
Received By cthroop Date 2022-09-17 Time 07:42 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-11-17 Cont ID  
Sent By ckimmerl Date 2022-11-17 Time 12:36 Rev Time 0.00
Received By ckimmerl Date 2022-11-17 Time 12:35 Sent To  
Notes
2022-11-17 12:36:31MASTER PERMIT FOR NEW CONSTRUCTION PASSED/PRINTED
 (22081235)

Review Stop Z ZONING
Rev No 1 Status F Date 2022-09-21 Cont ID  
Sent By ckimmerl Date 2022-09-21 Time 11:41 Rev Time 0.00
Received By ckimmerl Date 2022-09-21 Time 11:37 Sent To  
Notes
2022-09-21 11:40:43PER SEC. 94-107:
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS. CLEARING AND
 GRUBBING AND UNDERGROUND UTILITIES AND SITE WORK
 PERMITS ARE NOT CONSIDERED PERMITS WHICH AFFECT
 VERTICAL CONSTRUCTION. THE FINAL BUILDING PERMIT FOR
 THE NEW BUILDING SHALL BE APPLIED FOR WITHIN 30 DAYS OF
 ISSUANCE OF THE DEMOLITION PERMIT AND SHALL BE
 DILIGENTLY RESPONDED TO BY THE APPLICANT. VERTICAL
 CONSTRUCTION SHALL COMMENCE WITHIN SIX MONTHS OF THE
 ISSUANCE OF THE BUILDING PERMIT. THE APPLICATION AND/OR
 BUILDING PERMIT WILL EXPIRE IN THE EVENT OF SIX MONTHS
 OF INACTIVITY OR FAILURE TO PROGRESS WITH THE
 APPLICATION OR CONSTRUCTION, OR AS OTHERWISE PROVIDED
 IN THE LOCAL AMENDMENTS TO THE FLORIDA BUILDING CODE
 ADOPTED BY THE CITY. IN THE EVENT THAT VERTICAL
 CONSTRUCTION HAS NOT COMMENCED WITHIN SIX MONTHS, THE
 SITE SHALL BE RESTORED TO GRADE, TILLED, SODDED, AND
 IRRIGATED. ANY TEMPORARY CONSTRUCTION FENCE SHALL ALSO
 BE REMOVED.
  
 1. PLEASE ACQUIRE APPROVED PERMITS FOR RECONSTRUCTION,
 FOUNDATION, OR VERICAL CONSTRUCTION PRIOR TO DEMOLITION
 APPROVAL.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 [email protected] 822-1426


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved