Plan Review Details - Permit 22080991
Plan Review Stops For Permit 22080991
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-09-07 Cont ID  
Sent By cpuell Date 2022-09-07 Time 10:30 Rev Time 0.00
Received By cpuell Date 2022-09-07 Time 10:30 Sent To  
Notes
2022-09-07 10:32:22ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 14:26 Rev Time 0.00
Received By pvalenti Date 2022-12-02 Time 14:14 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-09-19 Cont ID  
Sent By pvalenti Date 2022-09-19 Time 16:28 Rev Time 0.00
Received By pvalenti Date 2022-09-19 Time 16:19 Sent To  
Notes
2022-09-19 16:29:38PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 FAILED PLAN REVIEW, COMMERCIAL:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-
 QUALITY/ASBESTOS-DEMOLITION-RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-01-17 Cont ID  
Sent By pvalenti Date 2023-01-17 Time 14:11 Rev Time 0.00
Received By pvalenti Date 2023-01-17 Time 14:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 14:25 Rev Time 0.00
Received By pvalenti Date 2022-12-02 Time 14:14 Sent To  
Notes
2022-12-02 14:26:37PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-19 Cont ID  
Sent By pvalenti Date 2022-09-19 Time 16:30 Rev Time 0.00
Received By pvalenti Date 2022-09-19 Time 16:19 Sent To  
Notes
2022-09-19 16:32:08PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
  
  
 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-01-23 Cont ID  
Sent By RROSSANO Date 2023-01-23 Time   Rev Time 0.00
Received By rrossano Date 2023-01-23 Time   Sent To  
Notes
2023-01-23 10:22:25PASSED WITH PROVISOS:
  
 ADD NOTE TO SWPPP TO PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-11-07 Cont ID  
Sent By rrossano Date 2022-11-07 Time   Rev Time 0.00
Received By rrossano Date 2022-11-07 Time   Sent To  
Notes
2022-11-07 11:02:14PLEASE PROVIDE DOCUMENTS AS REQUIRED BY BUILDING DEPT.
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-09-08 Cont ID  
Sent By sberglun Date 2022-09-08 Time 11:06 Rev Time 0.00
Received By sberglun Date 2022-09-08 Time 11:05 Sent To  
Notes
2022-09-08 11:06:23PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN
 SHOWN ON COPY OF PROPERTY SURVEY - SILT FENCE AROUND
 PROPERTY TO PREVENT DEBRIS RUNOFF; PROTECT ROADWAY FROM
 TRACKING OF DIRT FROM TRUCKS HAULING DEBRIS; PROTECT
 ANY STORM DRAIN INLETS IN VICINITY USING BEST
 MANAGEMENT PRACTICES (FILTER FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-09-21 Cont ID  
Sent By amhamilt Date 2022-09-21 Time 11:25 Rev Time 0.00
Received By amhamilt Date 2022-09-21 Time 11:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-24 Cont ID  
Sent By lmarchan Date 2023-01-24 Time 08:13 Rev Time 0.00
Received By lmarchan Date 2023-01-17 Time 14:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 14:27 Rev Time 0.00
Received By pvalenti Date 2022-11-01 Time 15:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-24 Cont ID  
Sent By shill Date 2022-09-24 Time 07:30 Rev Time 0.00
Received By shill Date 2022-09-02 Time 10:24 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-09-19 Cont ID  
Sent By pvalenti Date 2022-09-19 Time 16:29 Rev Time 0.00
Received By pvalenti Date 2022-09-19 Time 16:19 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2023-01-18 Cont ID  
Sent By ckimmerl Date 2023-01-18 Time 09:10 Rev Time 0.00
Received By ckimmerl Date 2023-01-18 Time 09:07 Sent To  
Notes
2023-01-18 09:08:05REPEAT COMMENT:
  
 PER SEC. 94-107
  
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS. CLEARING AND
 GRUBBING AND UNDERGROUND UTILITIES AND SITE WORK
 PERMITS ARE NOT CONSIDERED PERMITS WHICH AFFECT
 VERTICAL CONSTRUCTION.
  
 1. DEMOLITION PERMIT CANNOT BE APPROVED UNTIL A PERMIT
 FOR NEW BUILDING OR VERTICAL CONSTRUCTION HAS BEEN
 OBTAINED.
  
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 [email protected] 822-1426

Review Stop Z ZONING
Rev No 2 Status F Date 2022-11-03 Cont ID  
Sent By ckimmerl Date 2022-11-03 Time 14:42 Rev Time 0.00
Received By ckimmerl Date 2022-11-03 Time 14:41 Sent To  
Notes
2022-11-03 14:42:21REPEAT COMMENT:
  
 PER SEC. 94-107
  
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS. CLEARING AND
 GRUBBING AND UNDERGROUND UTILITIES AND SITE WORK
 PERMITS ARE NOT CONSIDERED PERMITS WHICH AFFECT
 VERTICAL CONSTRUCTION.
  
 1. DEMOLITION PERMIT CANNOT BE APPROVED UNTIL A PERMIT
 FOR NEW BUILDING OR VERTICAL CONSTRUCTION HAS BEEN
 OBTAINED.
  
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 [email protected] 822-1426

Review Stop Z ZONING
Rev No 1 Status F Date 2022-09-22 Cont ID  
Sent By ckimmerl Date 2022-09-22 Time 11:02 Rev Time 0.00
Received By ckimmerl Date 2022-09-22 Time 11:01 Sent To  
Notes
2022-09-22 11:02:42PER SEC. 94-107
  
 EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS. CLEARING AND
 GRUBBING AND UNDERGROUND UTILITIES AND SITE WORK
 PERMITS ARE NOT CONSIDERED PERMITS WHICH AFFECT
 VERTICAL CONSTRUCTION.
  
 1. DEMOLITION PERMIT CANNOT BE APPROVED UNTIL A PERMIT
 FOR NEW BUILDING OR VERTICAL CONSTRUCTION HAS BEEN
 OBTAINED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved