| Plan Review Stops For Permit 22080666 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
3 |
Status |
P |
Date |
2022-12-16 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-12-16 |
Time |
11:33 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-12-16 |
Time |
11:33 |
Sent To |
|
|
| Notes |
| 2022-12-16 11:33:46 | SEPARATE PERMIT SAPPLIED FOR THE DEMOS. THIS PERMIT IS | | | FOR PARCE 74434309050530040L 2501 PINEWOOD AVE ONLY |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
2 |
Status |
F |
Date |
2022-11-19 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-11-19 |
Time |
09:55 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-11-19 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2022-11-19 09:55:10 | PLANS INDICATE THAT THE DEMOLITION ARE FOR TWO SEPARATE | | | PARCELS, PARCEL 74434309050520500 HAS TWO STRUCTURES | | | WHICH HAVE THE ADDRESSES OF 550 NORTHWOOD RD AND 602 | | | NORTHWOOD RD, THE SECOND PARCEL 74434309050480050 HAS | | | ONE STRUCTURE WITH THE ADDRESS OF 610 25TH ST. TWO | | | PERMITS WILL BE REQUIRED, ONE FOR EACH PARCEL, PLEASE | | | LET ME KNOW WHICH PARCEL YOU WOULD LIKE THIS PERMIT | | | 22080666 TO BE FOR AND ALSO PLEASE LET ME KNOW WHAT THE | | | SECOND PERMIT NUMBER IS FOR THE SECONDARY PARCEL. | | | PLEASE CONTACT [email protected] TO APPLY FOR THE | | | SECOND PERMIT. CONTACT [email protected] OR CALL | | | 561-805-6659 FOR THE ADDRESSING RESPONSES. |
|
|
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
F |
Date |
2022-09-27 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-09-27 |
Time |
17:08 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-09-27 |
Time |
17:08 |
Sent To |
|
|
| Notes |
| 2022-09-27 17:09:20 | PLEASE PROVIDE A SITE PLAN OR AERIAL MAP SHOWING THE | | | EXACT BUILDINGS TO BE DEMOLISHED. PLEASE EMAIL RESPONSE | | | TO [email protected] OR CALL 561-805-6659 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2023-03-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-03-22 |
Time |
08:42 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-03-21 |
Time |
10:22 |
Sent To |
|
|
| Notes |
| 2023-03-22 08:57:31 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II/INSPECTOR | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | | | | 1.) PRIOR TO ANY PHASE OF DEMO WORK THE STATE LICENSED | | | ELECTRICAL CONTRACTOR IS REQUIRED TO PROVIDE A | | | CONFIRMATION LETTER STATING THAT ALL ELECTRIC IN AREA | | | OF WORK HAS BEEN DISCONNECTED AND AREA IS SAFE FOR | | | WORK. | | | | | | 2.) THE PLUMBING CONTRACTOR IS REQUIRED TO CAP SEWER | | | LATERAL IN ALL PHASES OF DEMOLITION. THE CONTRACTOR IS | | | RESPONSIBLE FOR SCHEDULING CITY PLUMBING INSPECTIONS | | | FOR THE CAPPING OF LINES PRIOR TO CONCEALING/COVERING | | | UP AREAS OF WORK. | | | | | | 3.) A HYDRANT METER PERMIT HAS BEEN OBTAINED THROUGH | | | THE UTILITIES DEPARTMENT FOR WATERING DOWN SITE DURING | | | DEMOLITION AS NEEDED. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2023-01-30 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-30 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-30 |
Time |
08:35 |
Sent To |
|
|
| Notes |
| 2023-01-30 10:51:28 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION. | | | PLEASE PROVIDE ELECTRIC PERMIT INFORMATION FOR THE | | | REMOVAL OF POWER POLES AND SAFE DISCONNECTING OF | | | ELECTRIC. | | | | | | 3. WATERDOWN METHOD: | | | SINCE A BACKFLOW PREVENTER DEVICE HAS BEEN SELECTED AS | | | THE METHOD OF WATERING DOWN SITE DURING DEMOLITION, | | | PLEASE INFORM ME WHEN THE PLUMBING FINAL INSPECTION | | | #703 HAS BEEN APPROVED. BEFORE SCHEDULING THE #703 | | | PLUMBING FINAL INSPECTION, THE BACKFLOW DEVICE NEEDS TO | | | BE TESTED AND CERTIFIED BY THE CITY PUBLIC UTILITIES | | | DEPARTMENT, 561 822 2244. FAX THE COMPLETED "DEMOLITION | | | APPLICATION" FORM TO | | | 561-822-2183. | | | | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703 INSPECTION AND INFORM ME | | | WHEN THE PLUMBING FINAL INSPECTION #703 HAS BEEN | | | APPROVED. | | | | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION. | | | PLEASE PROVIDE ELECTRIC PERMIT INFORMATION FOR THE | | | REMOVAL OF POWER POLES AND SAFE DISCONNECTING OF | | | ELECTRIC. | | | | | | 3. WATERDOWN METHOD: | | | SINCE A BACKFLOW PREVENTER DEVICE HAS BEEN SELECTED AS | | | THE METHOD OF WATERING DOWN SITE DURING DEMOLITION, | | | PLEASE INFORM ME WHEN THE PLUMBING FINAL INSPECTION | | | #703 HAS BEEN APPROVED. BEFORE SCHEDULING THE #703 | | | PLUMBING FINAL INSPECTION, THE BACKFLOW DEVICE NEEDS TO | | | BE TESTED AND CERTIFIED BY THE CITY PUBLIC UTILITIES | | | DEPARTMENT, 561 822 2244. FAX THE COMPLETED "DEMOLITION | | | APPLICATION" FORM TO | | | 561-822-2183. | | | | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703 INSPECTION AND INFORM ME | | | WHEN THE PLUMBING FINAL INSPECTION #703 HAS BEEN | | | APPROVED. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-12-06 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-06 |
Time |
16:45 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-12-06 |
Time |
16:01 |
Sent To |
|
|
| Notes |
| 2022-12-06 16:09:20 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION. | | | PLEASE PROVIDE ELECTRIC PERMIT INFORMATION FOR THE | | | REMOVAL OF POWER POLES AND SAFE DISCONNECTING OF | | | ELECTRIC. | | | | | | 3. WATERDOWN METHOD: | | | SINCE A BACKFLOW PREVENTER DEVICE HAS BEEN SELECTED AS | | | THE METHOD OF WATERING DOWN SITE DURING DEMOLITION, | | | PLEASE INFORM ME WHEN THE PLUMBING FINAL INSPECTION | | | #703 HAS BEEN APPROVED. BEFORE SCHEDULING THE #703 | | | PLUMBING FINAL INSPECTION, THE BACKFLOW DEVICE NEEDS TO | | | BE TESTED AND CERTIFIED BY THE CITY PUBLIC UTILITIES | | | DEPARTMENT, 561 822 2244. FAX THE COMPLETED "DEMOLITION | | | APPLICATION" FORM TO | | | 561-822-2183. | | | | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703 INSPECTION AND INFORM ME | | | WHEN THE PLUMBING FINAL INSPECTION #703 HAS BEEN | | | APPROVED. | | | | | | | | | 7. SEPARATE PERMITS ARE REQUIRED (ONE FOR EACH PARCEL) | | | THAT INVOLVES WORK AS SUBMITTED FOR. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-10-03 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-10-03 |
Time |
11:10 |
Sent To |
|
|
| Notes |
| 2022-10-03 11:24:07 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION | | | | | | 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS) | | | RELEASE OF SERVICE CONFIRMATION | | | | | | 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER | | | DEPARTMENT, REQUEST FOR METER PULL, ON | | | THEIR FORM "DEMOLITION APPLICATION" | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | WATERDOWN METHOD: | | | IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED | | | INFPRMATION OF THE WATER TRUCK SUCH AS: THE | | | GALLON CAPACITY OF THE WATER TANK AND A LETTER | | | INCLUDING A STATEMENT THAT THE WATER | | | USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY | | | AND WILL BE ON-SITE AT ALL TIMES | | | DURING DEMOLITION. | | | IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED, | | | THEN A PARTIAL RELEASE WILL BE NOTED | | | ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS | | | SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE | | | SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE | | | BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY | | | THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE | | | COMPLETED "DEMOLITION APPLICATION" FORM TO | | | 561-822-2183. | | | | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703. | | | | | | 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART | | | MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS | | | IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR | | | THE FORM TO [email protected]. | | | | | | 7. SEPARATE PERMITS ARE REQUIRED (ONE FOR EACH PARCEL) | | | THAT INVOLVES WORK AS SUBMITTED FOR. | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2023-01-17 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2023-01-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2023-01-17 |
Time |
|
Sent To |
|
|
| Notes |
| 2023-01-17 11:01:42 | DEMO PROVISOS | | | | | | APPROVAL IS FOR SITE WORK ONLY (NO RIGHT OF WAY). | | | | | | THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS | | | PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES, | | | YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL | | | BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR | | | DEMOLITION WORK. INFORMATION CAN BE FOUND HERE: | | | HTTP://WWW.SUNSHINE811.COM/ | | | | | | THANKS, | | | RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES | | | DEPT., 561-494-1098, FAX: 561-494-1116 [email protected] | | | FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2022-11-21 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-11-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2022-11-21 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-11-21 10:18:07 | PROJECT IS STILL UNDER SITE PLAN REVIEW. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-09-27 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2022-09-27 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2022-09-27 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-09-27 10:59:54 | PROJECT IS STILL UNDER SITE PLAN REVIEW. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-10-06 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-10-06 |
Time |
16:33 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-10-06 |
Time |
16:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-03-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-03-22 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-03-17 |
Time |
12:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-01-30 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-01-30 |
Time |
10:51 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-01-12 |
Time |
09:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-12-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-07 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-11-18 |
Time |
07:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-10-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-10-07 |
Time |
06:27 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-09-27 |
Time |
05:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2023-03-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2023-03-22 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2023-03-22 |
Time |
09:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-12-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-12-07 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-12-06 |
Time |
16:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-10-03 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-10-03 |
Time |
11:09 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-10-03 |
Time |
11:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-10-11 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-10-11 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-10-11 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2023-01-06 10:23:17 | *****THIS PERMIT NUMBER ONLY APPLIES TO THE DEMO ON | | | 2501 PINEWOOD.***** | | | | | | NOT ALL PERMITS LISTED ON THE FRONT SCREEN HAVE PASSED | | | AND COVERED BY THE FEES/PLANS ARE APPROVED. | | | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | | [email protected] | | | | | 2022-10-11 16:26:15 | AS THERE IS NO EXISTING STRUCTURE ON THE SITE, PERMIT | | | HAS PASSED CONDITIONALLY: NO TREES IN THE RIGHT OF WAY | | | WILL BE ALTERED WITHOUT A SEPARATE PERMIT | | | | | | ANNE HAMILTON | | | HISTORIC PRESERVATION PLANNER | | | [email protected] | | | 561.822.1428 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-10-06 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-10-06 |
Time |
16:34 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-10-06 |
Time |
16:33 |
Sent To |
|
|
| Notes |
| 2022-10-06 16:35:01 | THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S) | | | | | | SEC 94-210 (D)(5) | | | "EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED | | | UNTIL A BUILDING PERMIT HAS BEEN ISSUED FOR A | | | REPLACEMENT BUILDING WHICH COMPLIES WITH THE NMUD | | | REGULATIONS" | | | | | | ANNE HAMILTON | | | HISTORIC PRESERVATION PLANNER | | | [email protected] | | | 561.822.1428 | | | |
|
|