Plan Review Details - Permit 22080566
Plan Review Stops For Permit 22080566
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-01-30 Cont ID  
Sent By rrossano Date 2023-01-30 Time   Rev Time 0.00
Received By rrossano Date 2023-01-30 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-11-21 Cont ID  
Sent By rrossano Date 2022-11-21 Time   Rev Time  
Received By rrossano Date 2022-11-21 Time   Sent To I
Notes
2022-11-21 13:01:48PLEASE ADDRESS FIRE COMMENTS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-01-24 Cont ID  
Sent By pleduc Date 2023-01-24 Time   Rev Time 0.00
Received By pleduc Date 2023-01-24 Time 11:08 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2022-11-17 Cont ID  
Sent By pleduc Date 2022-11-17 Time   Rev Time 0.00
Received By pleduc Date 2022-11-17 Time 12:30 Sent To  
Notes
2022-11-17 15:21:06THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET C6.00 NOR ANY OTHER PLAN SHEET - THERE IS NO
 CLEAR INDICATION OF WHAT IS PROPOSED UNDER THE PERMIT
 AND THE FIRE LINE UNDERGROUND WORK LOCATIONS.
  
 FOR CLARIFICATION PURPOSES, PLEASE PROVIDE A CLEAR
 INDICATION OF THE PROPOSED FIRE LINE BY HIGHLIGHTING OR
 OTHER METHODS.
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2023-03-02 Time   Rev Time 0.00
Received By lmarchan Date 2023-03-01 Time 16:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-01-31 Cont ID  
Sent By mpeterso Date 2023-01-31 Time 11:57 Rev Time 0.00
Received By mpeterso Date 2023-01-23 Time 08:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-22 Cont ID  
Sent By cthroop Date 2022-11-22 Time 14:21 Rev Time 0.00
Received By cthroop Date 2022-11-16 Time 08:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-03-02 Cont ID  
Sent By ccole Date 2023-03-02 Time 11:07 Rev Time 0.00
Received By ccole Date 2023-03-02 Time 10:24 Sent To  
Notes
2023-03-01 16:15:57DIGITALLY SIGNED FILE UPLOADED INTO SIGNATURES FOLDER

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2023-01-31 Cont ID  
Sent By mpeterso Date 2023-01-31 Time 11:45 Rev Time 0.00
Received By mpeterso Date 2023-01-31 Time 11:44 Sent To  
Notes
2023-01-31 11:57:24SIGNATURE REVIEW FAILED
  
 1) PLANS LOCATED IN THE DRAWING AND SIGNATURE FOLDERS
 DO NOT INDICATE AN EOR/AOR CERTIFIABLE DIGITAL
 SIGNATURES. PLEASE CORRECT AS OUTLINED BELOW.
  
 FS471/FS481 DOCUMENTS PREPARED BY ARCHITECT/ENGINEER OF
 RECORD AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 DIGITALLY SEALED AND SIGNED.
  
 PLEASE SUBMIT DIGITALLY SEALED AND SIGNED PLANS
 FOLLOWING PROJECTDOX INSTRUCTIONS
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
 561-805-6746
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-11-22 Cont ID  
Sent By cthroop Date 2022-11-22 Time 14:21 Rev Time 0.00
Received By cthroop Date 2022-11-22 Time 14:17 Sent To  
Notes
***NONE***