Plan Review Details - Permit 22080444
Plan Review Stops For Permit 22080444
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-08-10 Cont ID  
Sent By cpuell Date 2022-08-10 Time 10:22 Rev Time 0.00
Received By cpuell Date 2022-08-10 Time 10:22 Sent To  
Notes
2022-08-10 10:22:24ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-08-22 Cont ID  
Sent By cthroop Date 2022-08-22 Time 16:01 Rev Time 0.00
Received By cthroop Date 2022-08-22 Time 15:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-08-30 Cont ID  
Sent By cthroop Date 2022-08-30 Time 14:33 Rev Time 0.00
Received By cthroop Date 2022-08-30 Time 14:32 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-08-22 Cont ID  
Sent By cthroop Date 2022-08-22 Time 15:58 Rev Time 0.00
Received By cthroop Date 2022-08-22 Time 15:58 Sent To  
Notes
2022-08-22 16:01:20PLAN REVIEW BUILDING DEMO
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 THE FOLLOWING ITEM IS REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING INSPECTION #703.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-08-29 Cont ID  
Sent By rrossano Date 2022-08-29 Time   Rev Time 0.00
Received By rrossano Date 2022-08-29 Time   Sent To  
Notes
2022-08-29 09:47:59PRASSED WITH PROVISO: CALL 811 FOR UTILITY LOCATES 48
 HRS. IN ADVANCE OF CONSTRUCTION.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-08-12 Cont ID  
Sent By rrossano Date 2022-08-12 Time   Rev Time  
Received By rrossano Date 2022-08-12 Time   Sent To  
Notes
2022-08-12 10:14:22ON STORMWATER POLLUTION PREVENTION PLAN, PLEASE PROTECT
 ANY STORM DRAIN INLETS IN VICINITY (EDMOR ANS S OLIVE
 AVE) USING BEST MANAGEMENT PRACTICES (FILTER FABRIC,
 ETC.)
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. (PUBLIC UTILITIES SIGNOFF FOR
 WATER/SEWER APPEARS TO BE OUTSTANDING).
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected] HTTPS://WWW.WPB.ORG/GOVERNMENT/
 ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-08-16 Cont ID  
Sent By amhamilt Date 2022-08-16 Time 13:45 Rev Time 0.00
Received By amhamilt Date 2022-08-16 Time 13:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-08-30 Cont ID  
Sent By cthroop Date 2022-08-30 Time 14:33 Rev Time 0.00
Received By cthroop Date 2022-08-26 Time 16:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-08-22 Cont ID  
Sent By cthroop Date 2022-08-22 Time 16:12 Rev Time 0.00
Received By cthroop Date 2022-08-10 Time 07:13 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-08-22 Cont ID  
Sent By cthroop Date 2022-08-22 Time 16:01 Rev Time 0.00
Received By cthroop Date 2022-08-22 Time 15:58 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-08-16 Cont ID  
Sent By amhamilt Date 2022-08-16 Time 13:45 Rev Time 0.00
Received By amhamilt Date 2022-08-16 Time 13:45 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved