Plan Review Details - Permit 22080438
Plan Review Stops For Permit 22080438
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-09-29 Cont ID  
Sent By cpuell Date 2022-09-29 Time 08:07 Rev Time 0.00
Received By cpuell Date 2022-09-29 Time 08:06 Sent To  
Notes
2022-09-29 08:07:28ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 15:40 Rev Time 0.00
Received By pvalenti Date 2022-12-02 Time 14:56 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-09-30 Cont ID  
Sent By pvalenti Date 2022-09-30 Time 16:13 Rev Time 0.00
Received By pvalenti Date 2022-09-30 Time 10:11 Sent To  
Notes
2022-09-30 16:15:39ASBESTOS REVIEW DENIED:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-
 QUALITY/ASBESTOS-DEMOLITION-RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-12-16 Cont ID  
Sent By pvalenti Date 2022-12-16 Time 17:38 Rev Time 0.00
Received By pvalenti Date 2022-12-16 Time 17:38 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 15:40 Rev Time 0.00
Received By pvalenti Date 2022-12-02 Time 14:56 Sent To  
Notes
2022-12-02 15:21:17BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 (PLEASE SCHEDULE A #703 PLUMBING FINAL INSPECTION FOR
 THIS PERMIT #22111157.)
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-30 Cont ID  
Sent By pvalenti Date 2022-09-30 Time 16:16 Rev Time 0.00
Received By pvalenti Date 2022-09-30 Time 10:11 Sent To  
Notes
2022-09-30 16:21:16PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
  
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
  
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2022-10-12 Cont ID  
Sent By mpeterso Date 2022-10-11 Time 15:32 Rev Time 0.00
Received By mpeterso Date 2022-10-12 Time 15:22 Sent To  
Notes
2022-10-11 15:38:15CUSTOMER EMAILED LETTER FROM FPL STATING THERE IS NO
 POWER TO THE BUILDING. MP
  
 FPL LETTER SUBMITTED DOES NOT CONTAIN THE ADDRESS FOR
 THE DEMOLISION. IIN ADDITION IT RECOMENDS THE APPLICANT
 RETAIN AN ELECTRICAL CONTRACTOR.I HAVE SENT SENT AN
 EMAIL REQUESTING AN ELECTRIC APPLICATION ON 10/11/22.
 MP

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2022-12-17 Cont ID  
Sent By rrossano Date 2022-12-17 Time   Rev Time 0.00
Received By rrossano Date 2022-12-17 Time   Sent To I
Notes
2022-12-17 08:51:27PASSED WITH PROVISOS:
  
 CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR MORE
 INFO ON "CALL BEFORE YOU DIG", GO TO
 HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY
 DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE,
 CHAPTER 556.)
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2022-12-05 Cont ID  
Sent By rrossano Date 2022-12-05 Time   Rev Time 0.00
Received By rrossano Date 2022-12-05 Time   Sent To I
Notes
2022-12-05 12:51:35PLEASE ADDRESS BUILDING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-11-07 Cont ID  
Sent By rrossano Date 2022-11-07 Time   Rev Time 0.00
Received By rrossano Date 2022-11-07 Time   Sent To  
Notes
2022-11-07 11:19:57PLEASE PROVIDE ALL DOCUMENTS AS REQUIRED BY BUILDING
 DEPT.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-10-03 Cont ID  
Sent By rrossano Date 2022-10-03 Time   Rev Time  
Received By rrossano Date 2022-10-03 Time   Sent To  
Notes
2022-10-03 08:26:42PLEASE ADDRESSS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2022-11-15 Cont ID  
Sent By fmittner Date 2022-11-15 Time 08:42 Rev Time 0.00
Received By fmittner Date 2022-11-15 Time 08:42 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-10-07 Cont ID  
Sent By fmittner Date 2022-10-07 Time 14:12 Rev Time 0.00
Received By fmittner Date 2022-10-07 Time 14:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-06 Cont ID  
Sent By pvalenti Date 2022-12-06 Time 15:36 Rev Time 0.00
Received By pvalenti Date 2022-11-02 Time 06:22 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-10-11 Cont ID  
Sent By mpeterso Date 2022-10-11 Time 15:38 Rev Time 0.00
Received By mpeterso Date 2022-09-29 Time 05:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-12-02 Cont ID  
Sent By pvalenti Date 2022-12-02 Time 15:40 Rev Time 0.00
Received By pvalenti Date 2022-12-02 Time 14:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-09-30 Cont ID  
Sent By pvalenti Date 2022-09-30 Time 16:16 Rev Time 0.00
Received By pvalenti Date 2022-09-30 Time 10:12 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-11-15 Cont ID  
Sent By fmittner Date 2022-11-15 Time 08:42 Rev Time 0.00
Received By fmittner Date 2022-11-15 Time 08:42 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-10-07 Cont ID  
Sent By fmittner Date 2022-10-07 Time 14:12 Rev Time 0.00
Received By fmittner Date 2022-10-07 Time 14:12 Sent To  
Notes
***NONE***