Plan Review Details - Permit 22080239
Plan Review Stops For Permit 22080239
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-10-24 Cont ID  
Sent By rmcphers Date 2022-10-24 Time 15:11 Rev Time 0.00
Received By rmcphers Date 2022-10-24 Time 15:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 11:14 Rev Time 0.00
Received By rmcphers Date 2022-09-20 Time 11:08 Sent To  
Notes
2022-09-20 11:13:38REVISION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWING A603 - DETAIL 1D - PLEASE SHOW ALL FRAMING
 ATTACHMENTS TO FRAMING MEMBERS AND TO THE EXISTING SLAB
 ABOVE - SHOW ATTACHMENT TYPE AND ON CENTER SPACING. FBC
 WPB 107.2.1

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-09-29 Cont ID  
Sent By jleahy Date 2022-09-29 Time 15:58 Rev Time 0.00
Received By jleahy Date 2022-09-29 Time 15:48 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2022-09-16 Cont ID  
Sent By pleduc Date 2022-09-16 Time   Rev Time 0.00
Received By pleduc Date 2022-09-15 Time 10:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-10-24 Cont ID  
Sent By rmcphers Date 2022-10-24 Time 15:11 Rev Time 0.00
Received By rmcphers Date 2022-10-05 Time 06:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-09-29 Cont ID  
Sent By jleahy Date 2022-09-29 Time 15:58 Rev Time 0.00
Received By jleahy Date 2022-09-08 Time 14:08 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-10-19 Cont ID  
Sent By medwards Date 2022-10-19 Time 15:46 Rev Time 0.00
Received By medwards Date 2022-10-19 Time 15:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-09-15 Cont ID  
Sent By medwards Date 2022-09-15 Time 17:27 Rev Time 0.00
Received By medwards Date 2022-09-15 Time 17:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-09-16 Cont ID  
Sent By ccole Date 2022-09-16 Time 15:17 Rev Time 0.00
Received By ccole Date 2022-09-16 Time 15:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-10-24 Cont ID  
Sent By rmcphers Date 2022-10-24 Time 15:11 Rev Time 0.00
Received By rmcphers Date 2022-10-24 Time 15:11 Sent To  
Notes
2022-10-19 15:46:29MECHANICAL DIGITAL SIGNATURES APPROVED ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-09-20 Cont ID  
Sent By rmcphers Date 2022-09-20 Time 11:29 Rev Time 0.00
Received By rmcphers Date 2022-09-20 Time 11:28 Sent To  
Notes
2022-09-20 11:29:40SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS A111, M102 AND M103 DO NOT SHOW AS
 DIGITALLY SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved